Institutional Policy Report screen Fields

 

Field

Description

Scenario

Budget Planning Scenario is selected from lookup button.

Planning CoA Group

Budget Planning CoA Group is selected from drop down box.

Print amount

Print the amount 

Execution CoA Group

Execution CoA Group is selected from drop down box.

Fiscal Year

Fiscal Year is selected from drop down box.

Budget Version (Fiscal Year)

Budget Version is selected from the lookup button.

Comment

Comment on the report is entered in this field.

 

Economic Classification Per Program Report

Overview

Reports of Economic Classification by program can be required and are generated by the Central Administrator from this screen.

 

Navigation

Budget Formulation ► Budget Book Builder ► Nicaragua Reports ► Fascicle Central Administration Report ► Economic Classification per Program Report

 

Fields of the Report of Economic Classification by Programs

Field

Description

Scenario

Through this parameter user can choose the scenario for which he wants to generate the report

Planning CoA Group

The Default value is the CoA Group from Scenario CoA Group with attribute Lower level CoA Group equal to Null

Execution CoA Group

Signifies the Executing CoA group for the report to be generated.

Fiscal Year

The current Fiscal Year

Budget Version (Fiscal Year)

First Budget Version in list. Alphabetically ascending order.

Comment

Comment regarding the report.

 

Budget Credits Per Expense Group and Program Report

Overview

Reports on Budget Credits per Expense Group and Program are generated from this screen.

 

Navigation 

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Fascicle Central Administration Reports ► Budget Credits Per Expense Group and Program Report

 

Budget Credits Per Expense Group and Program Report Screen Fields

Field

Description

Scenario

Budget Planning Scenario is selected from lookup button for filtering records.

Planning CoA Group

Planning CoA Group is selected from drop down box for filtering records.

Execution CoA Group

Execution CoA Group is selected from drop down box for filtering records.

Fiscal Year

Fiscal Year is selected from drop down box for filtering records.

Budget Version (Fiscal Year)

Budget Version is selected from lookup button which relate to Budget Scenario.

Comment

Comment on the report entered in this field.

 

Budget Assignments Per Expense Object Report

Overview

Reports on Budget Assignments Per Expense Object can be required and are generated by Central Administrator from this screen.

 

Navigation 

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Fascicle Central Administration Reports ► Budget Assignments Per Expense Object Report

 

Budget Assignments Per Expense Object Report screen Fields

Field

Description

Scenario

Budget Planning Scenario selected from lookup button for filtering records.

Planning CoA Group

Planning CoA Group selected from drop down box for filtering records.

Fiscal Year

Fiscal Year selected from drop down box for filtering records.

Budget Version (Fiscal Year)

Fiscal Year selected from lookup button.

Comment

Comment on the report entered in this field.

 

Program And Subprogram Narrative Report

Overview

Displays the description of each of the programs and subprograms registered in the Medium Term Expenditure Framework and belonging to the institution.

 

Navigation

Budget Planning ► Budget Book Builder ► Nicaragua Reports ►Fascicle Central Administration Reports ► Program And Subprogram Narrative Report
 
 

Program And Subprogram Narrative Report Screen Fields

Field

Description

Scenario

Through this parameter user can choose the scenario for which user wants to generate the report.

Planning CoA Group

The Default value is the CoA Group from Scenario CoA Group with attribute Lower level CoA Group equal to Null.

Execution CoA Group

Signifies the Executing CoA group for the report to be generated.

Fiscal Year

The current Fiscal Year.

Budget Version (Fiscal Year)

First Budget Version in list. Alphabetically ascending order.

Comment

Comment regarding the report.

 

Capital Expense Details Report

Overview

Reports on details regarding capital expenditure are generated from this screen.

 

Navigation 

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Fascicle Central Administration Reports ► Capital Expense Details Report

 

Capital Expense Details Report screen Fields

Field

Description

Scenario

Budget Planning Scenario is selected from lookup button for filtering records.

Planning CoA Group

Planning CoA Group is selected from drop down box for filtering records.

Execution CoA Group

Execution CoA Group is selected from drop down box for filtering records.

Fiscal Year

Fiscal Year is selected from drop down box for filtering records.

Budget Version (Fiscal Year)

Budget version is selected from lookup button which relate to Budget Scenario.

Comment

Comment on the report entered in this field.

 

Fascicle Central Administration Report

Overview

This Fascicle contains multiple data sources. All the reports included here can be generated as one Report. These are the list of Reports: Institution Narrative, Economic Classification per Program, Budget Credits per Expense Group and Program, Budget Assignments per Expense Object , Program Narrative and Goals, Capital Expense Details and Budget assignments per Expense object.
 
 
Navigation
 
Budget Planning ► Budget Book Builder ► Nicaragua Report ► Fascicle Central Administration Report ► Fascicle Central Administration Report
 

 

Fascicle Central Administration Report Screen Fields

Field

Description

Scenario

Budget Planning Scenario is selected from lookup button.

Planning CoA Group

Budget Planning CoA Group is selected from drop down box.

Execution CoA Group

Signifies the Executing CoA group for the report to be generated.

Fiscal Year

Fiscal Year is selected from drop down box. The current Fiscal Year

Budget Version (Fiscal Year)

Budget Version is selected from the lookup button.

Comment

Comment on the report is entered in this field.

 

Fascicle Non Central Administration Reports

Consolidated Operations Report

Overview

Show assigned amounts of all Consolidates Operations separated by Revenues and Expenses. Then, within each group (Revenues or Expenses), amounts are divided and displayed into Current and Capital. Data is displayed for the closed fiscal year (FY-2), for the fiscal year being executed (FY-1) and the fiscal year being planned (FY). 

 

Navigation

Budget Planning ► Budget Book Builder ► Nicaragua Reports ►Fascicle Non Central Administration Reports ► Consolidated Operations Report
 
 
Consolidated Operations Report Screen Fields

Field

Description

Scenario

Scenario, from the list of Active Scenarios, for which the report will be generated.

Planning COA Group

COA Group, selected from the list of COA groups belonging to the Scenario selected previously.

Execution CoA Group

Signifies the Executing CoA group for the report to be generated.

Fiscal Year

Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year

Fiscal Year - 2

Two year before the Fiscal Year is selected from drop down box for filtering records.

Fiscal Year - 1

One year before the Fiscal Year is selected from drop down box for filtering records.

Budget Version (Fiscal Year)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

 

 

Fascicle Non Central Administration Reports

Overview

This Fascicle contains multiple data sources. All the reports included here can be generated as one Report. These are the reports : Institution Narrative, Capital Expense Details and Budget assignments per Expense object.

 

Navigation

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Fascicle Non Central Administration Reports ► Fascicle Non Central Administration Reports

 

Fascicle Non Central Administration Report Screen Fields

Field

Description

Scenario

Scenario, from the list of Active Scenarios, for which the report will be generated.

Planning COA Group

COA Group, selected from the list of COA groups belonging to the Scenario selected previously.

Execution CoA Group

Signifies the Executing CoA group for the report to be generated.

Fiscal Year

Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year

Fiscal Year - 2

Two year before the Fiscal Year is selected from drop down box for filtering records.

Fiscal Year - 1

One year before the Fiscal Year is selected from drop down box for filtering records.

Budget Version (Fiscal Year)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

 

Fascicle Mid Term Budget Reports

Expenses Projections Per Program And Subprogram Report

Overview

Show amounts assigned to Projections of Expenditures for programs and subprograms of the institution. Such information must be displayed for the current fiscal year, for closed fiscal year (FY-2), for fiscal year being executed (FY-1) and the projections for the next three fiscal years to come (FY+1, FY+2, FY+3).

 

Navigation

Budget Planning ► Budget Book Builder ► Nicaragua Reports ►Fascicle Mid Term Budgets Report ► Consolidated Operations Report

 

Expenses Projections Per Program And Subprogram Report Screen Fields

Field

Description

Scenario

Scenario, from the list of Active Scenarios, for which the report will be generated.

Planning COA Group

COA Group, selected from the list of COA groups belonging to the Scenario selected previously.

Execution CoA Group

Signifies the Executing CoA group for the report to be generated.

Fiscal Year

Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year

Fiscal Year - 2

Two year before the Fiscal Year is selected from drop down box for filtering records.

Fiscal Year - 1

One year before the Fiscal Year is selected from drop down box for filtering records.

Budget Version (Fiscal Year)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 1

This is the Projection 1 Fiscal Year

Budget Version (Fiscal Year 1)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 2

This is the Projection 2 Fiscal Year

Budget Version (Fiscal Year 2)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 3

This is the Projection 3 Fiscal Year

Budget Version (Fiscal Year 3)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Comment

Comment on the report is entered in this field.

 

 

Projections By Program, Type And Expense Group Report

Overview

Projections of scenarios for each program, Financing Type and Expense Group are generated through this screen by applying relevant filtering required for report generation.

 

Navigation 

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Fascicle Mid Term Budget Reports ► Projections By Program, Type And Expense Group Report

 

Projections By Program, Type And Expense Group Report screen Fields

Field

Description

Scenario

Scenario, from the list of Active Scenarios, for which the report will be generated.

Planning COA Group

COA Group, selected from the list of COA groups belonging to the Scenario selected previously.

Execution CoA Group

Signifies the Executing CoA group for the report to be generated.

Fiscal Year

Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year

Fiscal Year - 2

Two year before the Fiscal Year is selected from drop down box for filtering records.

Fiscal Year - 1

One year before the Fiscal Year is selected from drop down box for filtering records.

Budget Version (Fiscal Year)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 1This is the Projection 1 Fiscal Year.
Budget Version (Fiscal Year 1)This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.
Fiscal Year 2This is the Projection 2 Fiscal Year.
Budget Version (Fiscal Year 2)This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.
Fiscal Year 3This is the Projection 3 Fiscal Year.
Budget Version (Fiscal Year 3)This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.
CommentComment on the report is entered in this field.
 

Projections Per Program And Financing Type Report

Overview

Projections of scenarios for each program and Financing Type are generated through this screen by applying relevant filtering required for report generation.

 

Navigation

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Fascicle Mid Term Budget Reports ► Projections Per Program And Financing Type Report

 

Projections Per Program And Financing Type Report screen Fields

Field

Description

Scenario

Budget Planning Scenario selected from lookup button for filtering records.

Planning CoA Group

Planning CoA Group is selected from drop down box for filtering records.

Execution CoA Group

Execution CoA Group is selected from drop down box for filtering records.

Fiscal Year - 2

Two Years before the current fiscal year is selected from drop down box.

Fiscal Year - 1

One year before the current fiscal year is selected from drop down box.

Fiscal Year

Current fiscal year is selected from drop down box.

Budget Version (Fiscal Year)

Budget Version for the Fiscal Year is selected from lookup button.

Fiscal Year + 1

One year after current Fiscal Year is selected from drop down box.

Budget Version (Fiscal Year + 1)

Budget Version for the Fiscal Year plus one year is selected from lookup button.

Fiscal Year + 2

Two years after current Fiscal Year is selected from drop down box.

Budget Version (Fiscal Year + 2)

Budget Version for the Fiscal Year plus two years is selected from lookup button.

Fiscal Year + 3

Three years after current Fiscal Year is selected from drop down box.

Budget Version (Fiscal Year + 3)

Budget Version for the Fiscal Year plus three years is selected from lookup button.

Comment

Comment on the report is entered in this field.

 

Projections Per Project And Financing Type Report

Overview

Show amounts assigned to Projections of Expenditures for different Investment Projects. Such information must be displayed grouped by financing source type for the current fiscal year, for closed fiscal year (FY-2), for fiscal year being executed (FY-1) and the projections for the next three fiscal years to come (FY+1, FY+2, FY+3).

 

Navigation

Budget Formulation ► Budget Book Builder ► Nicaragua Reports ► Fascicle Mid Term Budget Report ► Projections Per Project And Financing Type Report

 

Projection Per Project and Financing Type Report Screen Fields 

Field

Description

Scenario

Scenario, from the list of Active Scenarios, for which the report will be generated.

Planning COA Group

COA Group, selected from the list of COA groups belonging to the Scenario selected previously.

Execution CoA Group

Signifies the Executing CoA group for the report to be generated.

Fiscal Year

Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year

Fiscal Year - 2

Two year before the Fiscal Year is selected from drop down box for filtering records.

Fiscal Year - 1

One year before the Fiscal Year is selected from drop down box for filtering records.

Budget Version (Fiscal Year)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 1

This is the Projection 1 Fiscal Year

Budget Version (Fiscal Year 1)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 2

This is the Projection 2 Fiscal Year

Budget Version (Fiscal Year 2)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 3

This is the Projection 3 Fiscal Year

Budget Version (Fiscal Year 3)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Comment

Comment on the report is entered in this field.

 
 

Product By Program And Sub Program Report

Overview

Indicators associated with each Program and Sub Program.

 

Navigation

Budget Formulation ► Budget Book Builder ► Nicaragua Reports ► Fascicle Mid Term Budget Report ► Product By Program And Sub Program Report

 

Product By Program And Sub Program Report Screen Fields 

Field

Description

Scenario

Scenario, from the list of Active Scenarios, for which the report will be generated.

Planning COA Group

COA Group, selected from the list of COA groups belonging to the Scenario selected previously.

Execution CoA Group

Signifies the Executing CoA group for the report to be generated.

Fiscal Year

Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year

Fiscal Year - 2

Two year before the Fiscal Year is selected from drop down box for filtering records.

Fiscal Year - 1

One year before the Fiscal Year is selected from drop down box for filtering records.

Budget Version (Fiscal Year)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 1

This is the Projection 1 Fiscal Year

Budget Version (Fiscal Year 1)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 2

This is the Projection 2 Fiscal Year

Budget Version (Fiscal Year 2)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 3

This is the Projection 3 Fiscal Year

Budget Version (Fiscal Year 3)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Comment

Comment on the report is entered in this field.

 

Product By Institution Report

Overview

Indicators associated with each Institution.

 

Navigation

Budget Formulation ► Budget Book Builder ► Nicaragua Reports ► Fascicle Mid Term Budget Report ► Product By Institution Report

 

Product By Institution Report Screen Fields 

Field

Description

Scenario

Scenario, from the list of Active Scenarios, for which the report will be generated.

Planning COA Group

COA Group, selected from the list of COA groups belonging to the Scenario selected previously.

Execution CoA Group

Signifies the Executing CoA group for the report to be generated.

Fiscal Year

Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year

Fiscal Year - 2

Two year before the Fiscal Year is selected from drop down box for filtering records.

Fiscal Year - 1

One year before the Fiscal Year is selected from drop down box for filtering records.

Budget Version (Fiscal Year)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 1

This is the Projection 1 Fiscal Year

Budget Version (Fiscal Year 1)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 2

This is the Projection 2 Fiscal Year

Budget Version (Fiscal Year 2)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 3

This is the Projection 3 Fiscal Year

Budget Version (Fiscal Year 3)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Comment

Comment on the report is entered in this field.

 
 

Fascicle Mid Term Budget Report

Overview

This Fascicle contains multiple data sources like Institution Narrative , Product by Institution, Program and Subprogram Narrative, Product by Program and Subprogram, Expenses projections per Program and Subprogram ,Projections per Program and Financing Type, Projections per Project and Financing Type . All the reports included here can be generated as one Report.

 

Navigation

Budget Formulation ► Budget Book Builder ► Nicaragua Reports ► Fascicle Mid Term Budget Report ► Fascicle Mid Term Budget Report

 

Fascicle Mid Term Budget Report Screen Fields 

Field

Description

Scenario

Scenario, from the list of Active Scenarios, for which the report will be generated.

Planning COA Group

COA Group, selected from the list of COA groups belonging to the Scenario selected previously.

Execution CoA Group

Signifies the Executing CoA group for the report to be generated.

Fiscal Year

Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year

Fiscal Year - 2

Two year before the Fiscal Year is selected from drop down box for filtering records.

Fiscal Year - 1

One year before the Fiscal Year is selected from drop down box for filtering records.

Budget Version (Fiscal Year)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 1

This is the Projection 1 Fiscal Year

Budget Version (Fiscal Year 1)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 2

This is the Projection 2 Fiscal Year

Budget Version (Fiscal Year 2)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 3

This is the Projection 3 Fiscal Year

Budget Version (Fiscal Year 3)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Comment

Comment on the report is entered in this field.

 
 

Global Central Administration Reports

Economic Classification Per Institution (Recurrent) Report

Overview

This feature generates a report on Economic Classification Per Institution (Recurrent).

Navigation

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Global Central Administration Reports ► Economic Classification Per Institution (Recurrent) Report

 

Economic Classification Per Institution (Recurrent) Report Field Description

FieldDescription
ScenarioBudget Planning Scenario selected from lookup button for filtering records.
Planning CoA GroupPlanning CoA Group selected from drop down box for filtering records.
Fiscal YearFiscal Year selected from drop down box for filtering records.
Budget Version (Fiscal Year)Budget Version for the relevant fiscal year is selected from lookup button for filtering records.
CommentCoding Block Filter Type is selected using drop down menu.

 

Budget Balance Of Revenue And Expenses Report

Overview

This feature generates a report on Budget Balance Of Revenue And Expenses Report.

 

Navigation

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Global Central Administration Reports ► Budget Balance Of Revenue And Expenses Report

 

Budget Balance Of Revenue And Expenses Report Field Description

 

Field

Description

Scenario

Budget Planning Scenario selected from lookup button for filtering records.

Revenue Planning CoA Group

Revenue Planning CoA Group selected from drop down box for filtering records.

Expense Planning COA Group

Expense Planning CoA Group selected from drop down box for filtering records.

Fiscal Year

Fiscal Year selected from drop down box for filtering records.

Expense Budget Version (Fiscal Year)

Expense Budget Version for the relevant fiscal year is selected from lookup button for filtering records.

Revenue Budget Version (Fiscal Year)Revenue Budget Version for the relevant fiscal year is selected from lookup button for filtering records.

Comment

Comment on the report is entered in this field.

 
 
 

Capital Expense Detail Projects And Others FY Report

Overview 

This feature generates a report on Capital Expense Detail Projects And Others FY Report. Show capital expenditure detail for projects and others according to institutional classification per expenditure type.

 

Navigation

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Global Central Administration Reports ► Capital Expense Detail Projects And Others FY Report

 

Capital Expense Detail Projects And Others FY Report Field Description

 

Field

Description

Scenario

Budget Planning Scenario selected from lookup button for filtering records.

Planning CoA Group

 Planning CoA Group selected from drop down box for filtering records.

Execution CoA Group

Signifies the Executing CoA group for the report to be generated.

Fiscal Year

Fiscal Year selected from drop down box for filtering records.

Budget Version (Fiscal Year)

Budget Version for the relevant fiscal year is selected from lookup button for filtering records.

 
 

Capital Expense Detail Projects And Others Report

Overview

This feature generates a report on Capital Expense Detail Projects And Others Report. Show accumulated amounts assigned per financing type for all projects belonging to entities that receive Assignment and Subventions.

 

Navigation

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Global Central Administration Reports ► Capital Expense Detail Projects And Others Report

 

Capital Expense Detail Projects And Others Report Field Description

 

Field

Description

Scenario

Budget Planning Scenario selected from lookup button for filtering records.

Planning CoA Group

 Planning CoA Group selected from drop down box for filtering records.

Fiscal Year

Fiscal Year selected from drop down box for filtering records.

Budget Version (Fiscal Year)

Budget Version for the relevant fiscal year is selected from lookup button for filtering records.

Comment

Comment on the report is entered in this field.

 

Classification Per Institution Report

Overview

This feature generates a report on Classification Per Institution. Show consolidated expenses per institution.  The report has two sections: first, a list of institutions with amount for current and capital expenses and the second section, amounts for amortization types.

 

Navigation

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Reportes Globales de la Administración Central ► Classification Per Institution Report

 

Classification Per Institution Report Field Description

 

Field

Description

Scenario

Budget Planning Scenario selected from lookup button for filtering records.

Planning CoA Group

Planning CoA Group selected from drop down box for filtering records.

Print AmountPrint Amount options can be selected from drop-down menu.
Execution CoA GroupExecution CoA Group selected from drop down box for filtering records.

Fiscal Year

Fiscal Year selected from drop down box for filtering records.

Budget Version (Fiscal Year)

Budget Version for the relevant fiscal year is selected from lookup button for filtering records.

Comment

Comment on the report is entered in this field.

 

Deficit Financing Detail Report

Overview

This feature generates a report on Deficit Financing Detail Report. Show the detail of expenditures related to donations and external loans, displayed by projects or activities plus Deficit Financing grouped by Organization and Financing Source Type.

 

Navigation

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Global Central Administration Reports ► Deficit Financing Detail Report

 

Deficit Financing Detail Report Field Description

Field

Description

Scenario

Budget Planning Scenario selected from lookup button for filtering records.

Planning CoA Group

 Planning CoA Group selected from drop down box for filtering records.

Execution CoA Group

Signifies the Executing CoA group for the report to be generated.

Fiscal Year

Fiscal Year selected from drop down box for filtering records.

Budget Version (Fiscal Year)

Budget Version for the relevant fiscal year is selected from lookup button for filtering records.

Comment

Comment on the report is entered in this field.

 

Economic Classification per Institution (Capital) Report

Overview

This feature generates a report on Economic Classification per Institution (Capital) Report. Show institutional economic classification of capital expenditure per each classification related to: remunerations, goods and services, transfers, Debt Services and expenditure total amounts per corresponding report (Capital expense, current expense and both).

 

Navigation

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Reportes Globales de la Administración Central ► Economic Classification per Institution (Capital) Report

 

Economic Classification per Institution (Capital) Report Field Description

Field

Description

Scenario

Budget Planning Scenario selected from lookup button for filtering records.

Planning CoA Group

 Planning CoA Group selected from drop down box for filtering records.

Print AmountPrint Amount options can be selected from drop-down menu.

Fiscal Year

Fiscal Year selected from drop down box for filtering records.

Budget Version (Fiscal Year)

Budget Version for the relevant fiscal year is selected from lookup button for filtering records.

 

Expenditure Detail Per Program And Source Type Report

Overview

This feature generates a report Expenditure Detail Per Program And Source Type Report. Show detail of programs per Financing Source Type, plus Amortization types and total, grouped by institution. This report has two sections: Section 1, programs listed per each institution and Section 2: Summary of amortization amounts with a general total for both, summary of programs and amortizations.

 

Navigation

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Global Central Administration Reports ► Expenditure Detail Per Program And Source Type Report

 

Expenditure Detail Per Program And Source Type Report Field Description

 

Field

Description

Scenario

Budget Planning Scenario selected from lookup button for filtering records.

Planning CoA Group

 Planning CoA Group selected from drop down box for filtering records.

Fiscal Year

Fiscal Year selected from drop down box for filtering records.

Budget Version (Fiscal Year)

Budget Version for the relevant fiscal year is selected from lookup button for filtering records.

Comment

Comment on the report is entered in this field.

 

Expense Detail Per Project And Others Per Source Type Report

Overview

This feature generates a report on Expense Detail Per Project And Others Per Source Type Report.

 

Navigation

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Reportes Globales de la Administración Central ► Expense Detail Per Project And Others Per Source Type Report

 

Expense Detail Per Project And Others Per Source Type Report Field Description

 

 

Field

Description

Scenario

Budget Planning Scenario selected from lookup button for filtering records.

Planning CoA Group

 Planning CoA Group selected from drop down box for filtering records.

Print AmountPrint Amount options can be selected from drop-down menu.

Fiscal Year

Fiscal Year selected from drop down box for filtering records.

Budget Version (Fiscal Year)

Budget Version for the relevant fiscal year is selected from lookup button for filtering records.

 

External Debt Relief Assignment Report

Overview

Show budget assignment for poverty expenses of central government related to projects for Heavily Indebted Poor Countries (HICP).

Navigation

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Global Central Administration Reports ► External Debt Relief Assignment Report

External Debt Relief Assignment Report Field Description

Field

Description

Scenario

Budget Planning Scenario selected from lookup button for filtering records.

 Planning CoA Group

 Planning CoA Group selected from drop down box for filtering records.

Execution CoA Group

Signifies the Executing CoA group for the report to be generated.

Fiscal Year

Fiscal Year selected from drop down box for filtering records.

Budget Version (Fiscal Year)

Budget Version for the relevant fiscal year is selected from lookup button for filtering records.

Comment

Comment on the report is entered in this field.

 

Functional Expense Structure Fiscal Year Report

Overview

This feature generates a report on Functional Expense Structure Fiscal Year Report. Show the functional expense structure assigned to each entity and for each functional concept, showing both internal and external amortization total amounts, a total of all amortizations, and a general total amount for expenses plus amortizations.

 

Navigation

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Global Central Administration Reports ► Functional Expense Structure Fiscal Year Report

 

Functional Expense Structure Fiscal Year Report Field Description

 

Field

Description

Scenario

Budget Planning Scenario selected from lookup button for filtering records.

Planning CoA Group

 Planning CoA Group selected from drop down box for filtering records.

Execution CoA Group

Signifies the Executing CoA group for the report to be generated.

Fiscal Year

Fiscal Year selected from drop down box for filtering records.

Budget Version (Fiscal Year)

Budget Version for the relevant fiscal year is selected from lookup button for filtering records.

Comment

Comment on the report is entered in this field.

 

Internal Public Debt Service Report

Overview

This feature generates a report on Internal Public Debt Service Report. Shows in detail, expenses related to Internal Public Debt Service, presented by debt instruments, grouped by instrument type and by sector which the instrument belongs to.

 

Navigation

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Global Central Administration Reports ► Internal Public Debt Service Report

 

Internal Public Debt Service Report Field Description

 

Field

Description

Scenario

Budget Planning Scenario selected from lookup button for filtering records.

Planning CoA Group

 Planning CoA Group selected from drop down box for filtering records.

Execution CoA Group

Signifies the Executing CoA group for the report to be generated.

Fiscal Year

Fiscal Year selected from drop down box for filtering records.

Budget Version (Fiscal Year)

Budget Version for the relevant fiscal year is selected from lookup button for filtering records.

Comment

Comment on the report is entered in this field.

 
 

Municipal Transfers Report

Overview

This feature generates a report on Municipal Transfers Report. Show amounts of transfers per geographic locations.

Navigation

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Global Central Administration Reports ► Municipal Transfers Report

Municipal Transfers Report Field Description

Field

Description

Scenario

Budget Planning Scenario selected from lookup button for filtering records.

Planning CoA Group

 Planning CoA Group selected from drop down box for filtering records.

Execution CoA Group

Signifies the Executing CoA group for the report to be generated.

Fiscal Year

Fiscal Year selected from drop down box for filtering records.

Budget Version (Fiscal Year)

Budget Version for the relevant fiscal year is selected from lookup button for filtering records.

 

Public Investment Programs Report

Overview

This feature generates a report on Public Investment Programs Report. Show accumulated amounts assigned per financing type for each institution.

 

Navigation

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Global Central Administration Reports ► Public Investment Programs Report

 

Public Investment Programs Report Field Description

Field

Description

Scenario

Budget Planning Scenario selected from lookup button for filtering records.

Planning CoA Group

Planning CoA Group selected from drop down box for filtering records.

Fiscal Year

Fiscal Year selected from drop down box for filtering records.

Budget Version (Fiscal Year)

Budget Version for the relevant fiscal year is selected from lookup button for filtering records.

Comment

Comment on the report is entered in this field.

 

 
 

Revenue Budget per Institution

Overview

Show accumulated amount assigned of revenues for rents with specific destination source type and a total amount column of the report.

 

Navigation

Budget Book Builder ► Nicaragua Reports  ► Revenue Budget per Institution

 

Revenue Budget per Institution Report screen Fields

 

Field

Description

Scenario

Budget Planning Scenario selected from lookup button for filtering records.

 Planning CoA Group

 Planning CoA Group selected from drop down box for filtering records.

Print Amount

Print the amount

Execution CoA Group

Signifies the Executing CoA group for the report to be generated.

Fiscal Year

Fiscal Year selected from drop down box for filtering records.

Budget Version (Fiscal Year)

Budget Version for the relevant fiscal year is selected from lookup button for filtering records.

Comment

Comment on the report is entered in this field.

 

Revenues Budget per Item and Collecting Unit Report

Overview

This feature generates a report on Revenues Budget per Item and Collecting Unit. Show accumulated amount of revenues per resource item, separately per collecting unit.

 

Navigation

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Global Central Administration Reports ► Revenues Budget per Item and Collecting Unit Report

 

Revenues Budget per Item and Collecting Unit Report Field Description

Field

Description

Scenario

Budget Planning Scenario selected from lookup button for filtering records.

Planning CoA Group

Planning CoA Group selected from drop down box for filtering records.

Execution CoA GroupSignifies the Executing CoA group for the report to be generated.

Fiscal Year

Fiscal Year selected from drop down box for filtering records.

Budget Version (Fiscal Year)

Budget Version for the relevant fiscal year is selected from lookup button for filtering records.

 

 

 

Global And Consolidated Operations Statistical Anex For Medim Term Reports

Budget By Gender Assignment Report

Overview

This feature generates a report on Budget By Gender Assignment Report. Present detail of expenditures related to Gender strategy, displayed institution and program and divided by Strategy Level.

 

Navigation

Budget Formulation ► Budget Book Builder ► Nicaragua Reports ► Global and Consolidated Operations Statistical Annex For Medium Term Reports ► Budget By Gender Assignment Report

 

Budget By Gender Assignment Report Screen Fields 

 

Field

Description

Scenario

Budget Planning Scenario selected from lookup button for filtering records.

Planning CoA Group

 Planning CoA Group selected from drop down box for filtering records.

Execution CoA Group

Signifies the Executing CoA group for the report to be generated.

Fiscal Year

Fiscal Year selected from drop down box for filtering records.

Budget Version (Fiscal Year)

Budget Version for the relevant fiscal year is selected from lookup button for filtering records.

Comment

Comment on the report is entered in this field.

 

Classification By Type Of Expenditure Institution Report

Overview

Show expenses amounts which are assigned to projections of different institutions. Such information will be display for closed fiscal year (FY – 2), fiscal year under execution (FY - 1) and Fiscal Year being planned (current FY). Also, the projections for the next three years after current fiscal year (FY+1, FY+2, FY+3). All of this for current expenses, capital expenses and amortizations.

 

Navigation

Budget Formulation ► Budget Book Builder ► Nicaragua Reports ► Global and Consolidated Operations Statistical Annex For Medium Term Reports ► Classification By Type Of Expenditure Institution Report

 

Classification By Type Of Expenditure Institution Report Screen Fields 

 

 

Field

Description

Scenario

Scenario, from the list of Active Scenarios, for which the report will be generated.

Planning COA Group

COA Group, selected from the list of COA groups belonging to the Scenario selected previously.

Print Amount

Print Amount here.

Execution CoA Group

Signifies the Executing CoA group for the report to be generated.

Fiscal Year

Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year

Fiscal Year - 2

Two year before the Fiscal Year is selected from drop down box for filtering records.

Fiscal Year - 1

One year before the Fiscal Year is selected from drop down box for filtering records.

Budget Version (Fiscal Year)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 1

This is the Projection 1 Fiscal Year

Budget Version (Fiscal Year 1)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 2

This is the Projection 2 Fiscal Year

Budget Version (Fiscal Year 2)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 3

This is the Projection 3 Fiscal Year

Budget Version (Fiscal Year 3)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Comment

Comment on the report is entered in this field.

 

Expense Functional Structure Report

Overview

Shows the functional structure within the institutional mid-term budget framework, grouping amounts by function concept and expense type for the two past fiscal years and the three next ones after current budget planning year.

This report has four sections.

  • First one shows mid-term expense budget in a consolidated way.
  • Second section shows mid-term budget of current expenses.
  • Third one, mid-term budget of capital expenses and
  • last section, shows mid-term budget is related to amortization.

Navigation

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Global And Consolidated Operations Statistical Anex For Medim Term Reports ► Expense Functional Structure Report

 

Expense Functional Structure Report Fields Description

FieldDescription
ScenarioUsing lookup button select the budget planning scenario.
Planning CoA GroupUse drop down menu to select the CoA group.
Print AmountPrint the amount
Execution CoA GroupUse drop down menu to select the CoA group.
Fiscal YearSelect the fiscal year as a filter option.
Fiscal Year - 2Select the fiscal year as a filter option.
Fiscal Year - 1Select the fiscal year as a filter option.
Budget Version (Fiscal Year)A budget version include a workflow because this is the header feature that includes a set of budget line groups which eventually could be sent for execution.
Fiscal Year 1Select the fiscal year as a filter option.
Budget Version (Fiscal Year 1)Fiscal year of the budget version. A budget version include a workflow because this is the header feature that includes a set of budget line groups which eventually could be sent for execution.
Fiscal Year 2Select the fiscal year as a filter option.
Budget Version (Fiscal Year 2)Fiscal year of the budget version. A budget version include a workflow because this is the header feature that includes a set of budget line groups which eventually could be sent for execution.
Fiscal Year 3Select the fiscal year as a filter option.
Budget Version (Fiscal Year 3)Fiscal year of the budget version. A budget version include a workflow because this is the header feature that includes a set of budget line groups which eventually could be sent for execution.
CommentShort description or comment on the report search.
 

 

Institutional Classification Per Expenditure Type And Source Report

Overview

Show expenses amounts which are assigned to projections of different institutions per Expenditure Type and Financing Source. Also, shows a consolidate section for Amortization and Amortization plus Expenditures. Such information will be display for closed fiscal year (FY – 2), fiscal year under execution (FY - 1) and Fiscal Year being planned (current FY). Also the projections for the next three years after current fiscal year (FY+1, FY+2, FY+3). 

 

Navigation

Budget Formulation ► Budget Book Builder ► Nicaragua Reports ► Global and Consolidated Operations Statistical Annex For Medium Term Reports ► Projections Per Project And Financing Type Report

 

Institutional Classification Per Expenditure Type And Source Report Screen Fields 

 

Field

Description

Scenario

Scenario, from the list of Active Scenarios, for which the report will be generated.

Planning COA Group

COA Group, selected from the list of COA groups belonging to the Scenario selected previously.

Print Amount

Print Amount here.

Execution CoA Group

Signifies the Executing CoA group for the report to be generated.

Fiscal Year

Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year

Fiscal Year - 2

Two year before the Fiscal Year is selected from drop down box for filtering records.

Fiscal Year - 1

One year before the Fiscal Year is selected from drop down box for filtering records.

Budget Version (Fiscal Year)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 1

This is the Projection 1 Fiscal Year

Budget Version (Fiscal Year 1)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 2

This is the Projection 2 Fiscal Year

Budget Version (Fiscal Year 2)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 3

This is the Projection 3 Fiscal Year

Budget Version (Fiscal Year 3)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Comment

Comment on the report is entered in this field.

 
 

Institutional Projects Per Financing Source Report

Overview

Shows mid-term projects per institution and financing source.

This report has two sections:

  • First one shows budget from projects per institution and financing source.
  • Second section shows budget of all projects consolidated by each financing source.

 

Navigation 

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Institutional Projects Per Financing Source Report

 

Institutional Projects Per Financing Source Report screen Fields

Field

Description

Scenario

Budget Planning Scenario selected from lookup button for filtering records.

Planning CoA Group

Planning CoA Group selected from drop down box for filtering records.

Fiscal Year

Fiscal Year selected from drop down box for filtering records.

Budget Version (Fiscal Year)

Budget Version is selected from lookup button for filtering records.

Fiscal Year + 1

One year after Fiscal Year selected from drop down box for filtering records.

Budget Version (Fiscal Year + 1)

Budget Version for the relevant fiscal year is selected from lookup button for filtering records.

Fiscal Year + 2

Two years after Fiscal Year selected from drop down box for filtering records.

Budget Version (Fiscal Year + 2)

Budget Version for the relevant fiscal year is selected from lookup button for filtering records.

Fiscal Year + 3

Three years after Fiscal Year selected from drop down box for filtering records.

Budget Version (Fiscal Year + 3)

Budget Version for the relevant fiscal year is selected from lookup button for filtering records.

Ceilings Coa Group

Ceiling Coa Group is selected from drop down box.

Coding Block Filter Type

Coding Block Filter Type is selected from drop down menu.
 

 

Public Debt Mid Term Projections Report

Overview

Show the assigned amounts and projections for the Public Debt Service, both internal and external. Such information will be displayed for the year already closed (FY-2), fiscal year under execution (FY-1) and the fiscal year being planned (FY). Furthermore, projections for the next three years (FY+1, FY+2, FY+3).

 

Navigation

Budget Formulation ► Budget Book Builder ► Nicaragua Reports ► Global and Consolidated Operations Statistical Annex For Medium Term Reports ► Public Debt Mid Term Projections Report

 

Public Debt Mid Term Projections Report Screen Fields 

 

Field

Description

Scenario

Scenario, from the list of Active Scenarios, for which the report will be generated.

Planning COA Group

COA Group, selected from the list of COA groups belonging to the Scenario selected previously.

Print Amount

Print Amount here.

Execution CoA Group

Signifies the Executing CoA group for the report to be generated.

Fiscal Year

Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year

Fiscal Year - 2

Two year before the Fiscal Year is selected from drop down box for filtering records.

Fiscal Year - 1

One year before the Fiscal Year is selected from drop down box for filtering records.

Budget Version (Fiscal Year)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 1

This is the Projection 1 Fiscal Year

Budget Version (Fiscal Year 1)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 2

This is the Projection 2 Fiscal Year

Budget Version (Fiscal Year 2)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 3

This is the Projection 3 Fiscal Year

Budget Version (Fiscal Year 3)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Comment

Comment on the report is entered in this field.

 

Other Reports

Budget Balance By Fund Report

Overview

Navigation

 

Budget Planning ► Budget Book Builder ► Nicaragua Report ► Other Report  ► Budget Balance By Fund Report

 

Budget Balance By Fund Report Screen Fields

 

Field

Description

Scenario

Budget Planning Scenario is selected from lookup button.

Revenue Planning CoA Group

Budget Planning CoA Group is selected from drop down box.

Expense Planning CoA Group

Budget Planning CoA Group is selected from drop down box.

Print amount 

Print the amount

Execution CoA Group

Group short description

Fiscal Year

Fiscal Year is selected from drop down box.

Fiscal Year - 2

Two year before the Fiscal Year is selected from drop down box for filtering records.

Fiscal Year - 1

One year before the Fiscal Year is selected from drop down box for filtering records.

Budget Version (Fiscal Year)

Relevant Budget Version is selected from the lookup button.

Revised Revenue Budget Version (Fiscal Year)

Revised Revenue Budget Version is selected from the lookup button.

Budgeted Revenue Budget Version (Fiscal Year)

Budgeted Revenue Budget Version is selected from the lookup button.

Revised Expense Budget Version (Fiscal Year)

Revised Expense Budget Version is selected from the lookup button.

Budgeted Expense Budget Version (Fiscal Year)

Budgeted Expense Budget Version is selected from the lookup button

Expense Budget Version (Fiscal Year)

Expense Budget Version is selected from the lookup button.

Revenue Budget Version (Fiscal Year)

Revenue Budget Version is selected from the lookup button.

Fiscal Year 1

First Budget Version in list.

Fiscal Year 2

Second Budget Version in list.

Fiscal Year 3

Third Budget Version in list.

Comment

Comment on the report is entered in this field.

 

Budget Ceilings Per Institution And Source Multi Year Report

Overview

Reports on Budget Ceiling per institution and Source Multi Year can be generated from this screen.

 

Navigation 

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Budget Ceilings Per Institution And Source Multi Year Report

 

Budget Ceilings Per Institution And Source Multi Year Report screen Fields

Field

Description

Scenario

Budget Planning Scenario selected from lookup button for filtering records.

Planning CoA Group

Planning CoA Group selected from drop down box for filtering records.

Fiscal Year

Fiscal Year selected from drop down box for filtering records.

Budget Version (Fiscal Year)

Budget Version is selected from lookup button for filtering records.

Fiscal Year + 1

One year after Fiscal Year selected from drop down box for filtering records.

Budget Version (Fiscal Year + 1)

Budget Version for the relevant fiscal year is selected from lookup button for filtering records.

Fiscal Year + 2

Two years after Fiscal Year selected from drop down box for filtering records.

Budget Version (Fiscal Year + 2)

Budget Version for the relevant fiscal year is selected from lookup button for filtering records.

Fiscal Year + 3

Three years after Fiscal Year selected from drop down box for filtering records.

Budget Version (Fiscal Year + 3)

Budget Version for the relevant fiscal year is selected from lookup button for filtering records.

Ceilings Coa Group

Ceiling Coa Group is selected from drop down box.

Coding Block Filter Type

Coding Block Filter Type is selected from drop down menu.

 

Budget Ceilings Per Institution And Source Report

Overview

This feature generates a report on Budget Ceilings Per Institution And Source Report. Show Budget ceilings per institution, expense type and its corresponding financing source type as well.

 

Navigation

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Budget Ceilings Per Institution And Source Report

 

Budget Ceilings Per Institution And Source Report Screen Fields 

 

Field

Description

Scenario

Budget Planning Scenario selected from lookup button for filtering records.

Planning CoA Group

 Planning CoA Group selected from drop down box for filtering records.

Fiscal Year

Fiscal Year selected from drop down box for filtering records.

Budget Version (Fiscal Year)

Budget Version for the relevant fiscal year is selected from lookup button for filtering records.

Ceilings Coa Group

Ceiling COA Group, selected from the list of COA groups belonging to the Scenario selected previously.

 
 

Central Gov Summary Expense Group Per Financial Source Report

Overview

Show the Central Government summary of assigned amount for the current fiscal year, history of execution in two years before current fiscal year (reference comparisons), and also, the next three years, including current fiscal year, with projected amounts for execution.

 

Navigation

Budget Formulation ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Central Gov Summary Expense Group Per Financial Source Report

 

Central Gov Summary Expense Group Per Financial Source Report Screen Field

 

Field

Description

Scenario

Scenario, from the list of Active Scenarios, for which the report will be generated.

Planning COA Group

COA Group, selected from the list of COA groups belonging to the Scenario selected previously.

Print Amount

Print Amount here.

Execution CoA Group

Signifies the Executing CoA group for the report to be generated.

Fiscal Year

Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year

Fiscal Year - 2

Two year before the Fiscal Year is selected from drop down box for filtering records.

Fiscal Year - 1

One year before the Fiscal Year is selected from drop down box for filtering records.

Budget Version (Fiscal Year)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 1

This is the Projection 1 Fiscal Year

Budget Version (Fiscal Year 1)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 2

This is the Projection 2 Fiscal Year

Budget Version (Fiscal Year 2)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 3

This is the Projection 3 Fiscal Year

Budget Version (Fiscal Year 3)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Comment

Comment on the report is entered in this field.

 

Detailed Analytical Budget Per Institution Report

Overview

This shows by Institution, Program, Subprogram, project, activity and financing source, amounts corresponding to originals, actual and the difference between both of them.

Navigation

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Detailed Analytical Budget Per Institution Report

 

Detailed Analytical Budget Per Institution Report Screen Fields

Field

Description

Scenario

Budget Planning Scenario is selected from lookup button.

Planning CoA Group

Budget Planning CoA Group is selected from drop down box.

Print amount

Print the amount 

Fiscal Year

Fiscal Year is selected from drop down box.

Budget Version (Fiscal Year)

Budget Version is selected from the lookup button.

Budget Version (Fiscal Year)

Budget Version is selected from the lookup button.

 
 
 

Economic Classification Central Gov Report

Overview

Shows the economic expense classification for central government. Also, former fiscal years and projections for three fiscal years after planning.

Navigation

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Economic Classification Central Gov Report

 

Economic Classification Central Gov Report Fields Description

FieldDescription
ScenarioUsing lookup button select the budget planning scenario.
Planning CoA GroupUse drop down menu to select the CoA group.
Execution CoA GroupUse drop down menu to select the CoA group.
Fiscal YearSelect the fiscal year as a filter option.
Fiscal Year - 2Select the fiscal year as a filter option.
Fiscal Year - 1Select the fiscal year as a filter option.
Budget Version (Fiscal Year)A budget version include a workflow because this is the header feature that includes a set of budget line groups which eventually could be sent for execution.
Fiscal Year + 1Select the fiscal year as a filter option.
Budget Version (Fiscal Year + 1)Fiscal year of the budget version. A budget version include a workflow because this is the header feature that includes a set of budget line groups which eventually could be sent for execution.
Fiscal Year + 2Select the fiscal year as a filter option.
Budget Version (Fiscal Year + 2)Fiscal year of the budget version. A budget version include a workflow because this is the header feature that includes a set of budget line groups which eventually could be sent for execution.
Fiscal Year + 3Select the fiscal year as a filter option.
Budget Version (Fiscal Year + 3)Fiscal year of the budget version. A budget version include a workflow because this is the header feature that includes a set of budget line groups which eventually could be sent for execution.
CommentShort description or comment on the report search.

 

Expense Detail for Poverty Reduction Program Report

Overview

Show expenses amounts which are assigned to projections of different institutions per Expenditure Type and consolidated per institution. Such information will be display for closed fiscal year (FY – 2), fiscal year under execution (FY - 1) and Fiscal Year being planned (current FY). Also the projections for the next three years after current fiscal year (FY+1, FY+2, FY+3).

  • first, current expenses amounts per institution;
  • second, capital expenses amounts per institution and
  • third, consolidated expenses per institution. 

Navigation

Budget Formulation ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Expense Detail for Poverty Reduction Program Report

 

Expense Detail for Poverty Reduction Program Report Screen Fields 

 

Field

Description

Scenario

Scenario, from the list of Active Scenarios, for which the report will be generated.

Planning COA Group

COA Group, selected from the list of COA groups belonging to the Scenario selected previously.

Print Amount

Print Amount here.

Execution CoA Group

Signifies the Executing CoA group for the report to be generated.

Fiscal Year

Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year

Fiscal Year - 2

Two year before the Fiscal Year is selected from drop down box for filtering records.

Fiscal Year - 1

One year before the Fiscal Year is selected from drop down box for filtering records.

Budget Version (Fiscal Year)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 1

This is the Projection 1 Fiscal Year

Budget Version (Fiscal Year 1)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 2

This is the Projection 2 Fiscal Year

Budget Version (Fiscal Year 2)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 3

This is the Projection 3 Fiscal Year

Budget Version (Fiscal Year 3)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Comment

Comment on the report is entered in this field.

 

Expense Projections Per Expenditure Group And Type Report

Overview

Shows expense amounts which are assigned to projections of different institutions per Expenditure Type and group and also consolidated per institution. Such information will be display for closed fiscal year (FY – 2), fiscal year under execution (FY - 1) and Fiscal Year being planned (current FY). Also, the projections for the next three years after current fiscal year (FY+1, FY+2, FY+3).

This report has three sections:

  • first, current expenses amounts per financing source;
  • second, capital expenses amounts per financing source and
  • third, consolidated expenses per financing source.

Navigation

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Expense Projections Per Expenditure Group And Type Report

 

Expense Projections Per Expenditure Group And Type Report Fields Description

FieldDescription
ScenarioUsing lookup button select the budget planning scenario.
Planning CoA GroupUse drop down menu to select the CoA group.
Execution CoA GroupUse drop down menu to select the CoA group.
Fiscal YearSelect the fiscal year as a filter option.
Fiscal Year - 2Select the fiscal year as a filter option.
Fiscal Year - 1Select the fiscal year as a filter option.
Budget Version (Fiscal Year)A budget version include a workflow because this is the header feature that includes a set of budget line groups which eventually could be sent for execution.
Fiscal Year + 1Select the fiscal year as a filter option.
Budget Version (Fiscal Year + 1)Fiscal year of the budget version. A budget version include a workflow because this is the header feature that includes a set of budget line groups which eventually could be sent for execution.
Fiscal Year + 2Select the fiscal year as a filter option.
Budget Version (Fiscal Year + 2)Fiscal year of the budget version. A budget version include a workflow because this is the header feature that includes a set of budget line groups which eventually could be sent for execution.
Fiscal Year + 3Select the fiscal year as a filter option.
Budget Version (Fiscal Year + 3)Fiscal year of the budget version. A budget version include a workflow because this is the header feature that includes a set of budget line groups which eventually could be sent for execution.
CommentShort description or comment on the report search.
 

 

Financing Of Budget Effort To Reduce Poverty Report

Overview

Show expenses amounts which are assigned to projections of different institutions per Expenditure Type and consolidated per institution. Such information will be display for closed fiscal year (FY – 2), fiscal year under execution (FY - 1) and Fiscal Year being planned (current FY). Also the projections for the next three years after current fiscal year (FY+1, FY+2, FY+3).

This report has three sections:

  • first, current expenses amounts per financing source;
  • second, capital expenses amounts per financing source and
  • third, consolidated expenses per financing source.
 

Navigation

Budget Formulation ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Financing Of Budget Effort To Reduce Poverty Report
 

 

Financing Of Budget Effort To Reduce Poverty Report Screen Fields 

 

Field

Description

Scenario

Scenario, from the list of Active Scenarios, for which the report will be generated.

Planning COA Group

COA Group, selected from the list of COA groups belonging to the Scenario selected previously.

Print Amount

Print Amount here.

Execution CoA Group

Signifies the Executing CoA group for the report to be generated.

Fiscal Year

Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year

Fiscal Year - 2

Two year before the Fiscal Year is selected from drop down box for filtering records.

Fiscal Year - 1

One year before the Fiscal Year is selected from drop down box for filtering records.

Budget Version (Fiscal Year)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 1

This is the Projection 1 Fiscal Year

Budget Version (Fiscal Year 1)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 2

This is the Projection 2 Fiscal Year

Budget Version (Fiscal Year 2)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 3

This is the Projection 3 Fiscal Year

Budget Version (Fiscal Year 3)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Comment

Comment on the report is entered in this field.

 

Institution And Program Report

Overview

Show per institution and program, amounts executed for current fiscal year and two former years, and amounts projected for the three consecutive next years, including current fiscal year.

 

Navigation

Budget Formulation ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Institution And Program Report
 

 

Institution and Program Report Screen Fields 

 

Field

Description

Scenario

Scenario, from the list of Active Scenarios, for which the report will be generated.

Planning COA Group

COA Group, selected from the list of COA groups belonging to the Scenario selected previously.

Print Amount

Print Amount here.

Execution CoA Group

Signifies the Executing CoA group for the report to be generated.

Fiscal Year

Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year

Fiscal Year - 2

Two year before the Fiscal Year is selected from drop down box for filtering records.

Fiscal Year - 1

One year before the Fiscal Year is selected from drop down box for filtering records.

Budget Version (Fiscal Year)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 1

This is the Projection 1 Fiscal Year

Budget Version (Fiscal Year 1)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 2

This is the Projection 2 Fiscal Year

Budget Version (Fiscal Year 2)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 3

This is the Projection 3 Fiscal Year

Budget Version (Fiscal Year 3)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Comment

Comment on the report is entered in this field.

 
 
 

Institution Program Objects Originals And Assigned Report

Overview

It shows the difference between original and assigned Budget per item, institution and program, expense group and financing source. 

 

Navigation

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Institution Program Objects Originals And Assigned Report

 

Institution Program Objects Originals And Assigned Report Screen Fields

Field

Description

Scenario

Budget Planning Scenario is selected from lookup button.

Planning CoA Group

Budget Planning CoA Group is selected from drop down box.

Print amount

Print the amount 

Fiscal Year

Fiscal Year is selected from drop down box.

Budget Version (Fiscal Year)

Budget Version is selected from the lookup button.

Budget Version (Fiscal Year)

Budget Version is selected from the lookup button.

 

 

 

 

 

 
 

 

Institution Resources By Item Originals And Assigned Report

Overview

This shows by Institution and Resource, amounts corresponding to originals, actual and the difference between them.

 

Navigation

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Institution Resources By Item Originals And Assigned Report

 

Institution Resources By Item Originals And Assigned Report Screen Fields

 

Field

Description

Scenario

Budget Planning Scenario is selected from lookup button.

Planning CoA Group

Budget Planning CoA Group is selected from drop down box.

Fiscal Year

Fiscal Year is selected from drop down box.

Budget Version (Fiscal Year)

Budget Version is selected from the lookup button.

Budget Version (Fiscal Year)

Budget Version is selected from the lookup button.

 

Institutional Projection By Object Group Report

Overview

Shows the assigned amounts and projections for the Public Investment per Institution and Financing Source. Such information is displayed for the fiscal year under execution (FY-1) and the next three fiscal years projections, just as it corresponds to the Mid Term Budget Framework.

This report has three sections:

  • Section one, shows amounts per expenditure group and source.
  • Section two, displays total per current expenses amounts.
  • Section three, shows total amounts for other expenditure groups not shown in section one.

 

Navigation 

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Institutional Projection By Object Group Report

 

Institutional Projection By Object Group Report screen Fields

Field

Description

Scenario

Budget Planning Scenario selected from lookup button for filtering records.

Planning CoA Group

Planning CoA Group selected from drop down box for filtering records.

Fiscal Year

Fiscal Year selected from drop down box for filtering records.

Budget Version (Fiscal Year)

Budget Version is selected from lookup button for filtering records.

Fiscal Year + 1

One year after Fiscal Year selected from drop down box for filtering records.

Budget Version (Fiscal Year + 1)

Budget Version for the relevant fiscal year is selected from lookup button for filtering records.

Fiscal Year + 2

Two years after Fiscal Year selected from drop down box for filtering records.

Budget Version (Fiscal Year + 2)

Budget Version for the relevant fiscal year is selected from lookup button for filtering records.

Fiscal Year + 3

Three years after Fiscal Year selected from drop down box for filtering records.

Budget Version (Fiscal Year + 3)

Budget Version for the relevant fiscal year is selected from lookup button for filtering records.

Ceilings Coa Group

Ceiling Coa Group is selected from drop down box.

Coding Block Filter Type

Coding Block Filter Type is selected from drop down menu.

 

Institutional Projections By Expense Type Report

Overview

Show the assigned amounts and projections for the Public Investment per Institution and Financing Source. Such information will be displayed for the fiscal year under execution (FY-1) and the next three fiscal years projections, just as it corresponds to the Mid Term Budget Framework.

This report has three sections:

  • Section one, shows amounts per expenditure group and source.
  • Section two, displays total per current expenses amounts.
  • Section three, shows total amounts for other expenditure groups not shown in section one.

 

Navigation

Budget Formulation ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Institutional Projections By Expense Type Report

 

Institutional Projections By Expense Type Report Screen Fields 

Field

Description

Scenario

Scenario, from the list of Active Scenarios, for which the report will be generated.

Planning COA Group

COA Group, selected from the list of COA groups belonging to the Scenario selected previously.

Print Amount

Print Amount here.

Execution CoA Group

Signifies the Executing CoA group for the report to be generated.

Fiscal Year

Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year

Fiscal Year - 2

Two year before the Fiscal Year is selected from drop down box for filtering records.

Fiscal Year - 1

One year before the Fiscal Year is selected from drop down box for filtering records.

Budget Version (Fiscal Year)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 1

This is the Projection 1 Fiscal Year

Budget Version (Fiscal Year 1)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 2

This is the Projection 2 Fiscal Year

Budget Version (Fiscal Year 2)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Fiscal Year 3

This is the Projection 3 Fiscal Year

Budget Version (Fiscal Year 3)

This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report.

Comment

Comment on the report is entered in this field.

 

 

 

 

 

 

National Consolidated Originals And Assigned Report

Overview

Show the consolidate difference between original and assigned Budget for all institutions. 

 

Navigation

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► National Consolidated Originals And Assigned Report

 

National Consolidated Originals And Assigned Report Screen Fields

 

Field

Description

Scenario

Budget Planning Scenario is selected from lookup button.

Planning CoA Group

Budget Planning CoA Group is selected from drop down box.

Print amount

Print the amount 

Fiscal Year

Fiscal Year is selected from drop down box.

Budget Version (Fiscal Year)

Budget Version is selected from the lookup button.

Budget Version (Fiscal Year)

Budget Version is selected from the lookup button.

 

Programmatic Structure Originals And Assigned Report

Overview

Show by Institution, Program, Subprogram, project, activity and financing source, amounts corresponding to originals, actual and the difference between both of them.

 

Navigation

Budget Formulation ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Programmatic Structure Originals And Assigned Report

 

Programmatic Structure Originals And Assigned Report Screen Fields 

 

Field

Description

Scenario

Budget Planning Scenario selected from lookup button for filtering records.

Planning CoA Group

 Planning CoA Group selected from drop down box for filtering records.

Fiscal Year

Fiscal Year selected from drop down box for filtering records.

Budget Version (Fiscal Year)

Budget Version for the relevant fiscal year is selected from lookup button for filtering records.

Budget Version (Fiscal Year)

Budget Version for the relevant fiscal year is selected from lookup button for filtering records.

 
 

Public Investment Programs For Medium Term Budget Report

Overview

Display information of Public Investment Projects grouped by Institution.

 

Navigation

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Public Investment Programs for Medium Term Budget Report

 

Cost Driver Hierarchy Screen Fields

 

Field

Description

Fiscal Year

Reference to the fiscal year to which this Public Investment Programs For Medium Term Budget apply

Fiscal Year 1

This field states the Projection 1 Fiscal Year

Fiscal Year 2

This field states the Projection 2 Fiscal Year

Fiscal Year 3

This field states the Projection 3 Fiscal Year

 

Resource Item Per Financing Type Report

Overview

Show in detail, amounts assigned per resource item and financing type for each 

 

Navigation

Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Resource Item Per Financing Type Report

 
Resource Item Per Financing Type Report Screen Fields
 
 

Field

Description

Scenario

Through this parameter user can choose the scenario for which user wants to generate the report

Planning CoA Group

The Default value is the CoA Group from Scenario CoA Group with attribute Lower level CoA Group equal to Null

Fiscal Year

The current Fiscal Year

Budget Version (Fiscal Year)

First Budget Version in list. Alphabetically ascending order.

Comment

Comment regarding the report