The Budget Planning module is a comprehensive budget preparation, review and approval and reporting program. It enables governments to collaboratively plan for a single year or over multiple years using an iterative budget versions, scenarios and approval approach. Each budget version can be approved individually, or by approving individual records within its budget plans. The final version of the approved budget is used to establish the budgetary control levels and transfer them to the Budgeting and Appropriations (or budget execution) module for control.
Overview
Budget Book Builder allows users to print of the Budget Estimates as per the chart of accounts aggregating at the national, ministry, department, project, program, etc. Main features it holds are:
Budget Book Builder is an application that requires a series of customized reports available within its features.
Overview
The Budget Configurator is used to define where the source of the data will be obtained for each report (Custom, Crystal Report or Jasper) and is related to each Document (or Estimate). It defines where to obtain the data form previous years, current year and Indicative years when outputting the results in the reports.
Navigation
Budget Planning ►Budget Book Builder ► Budget Configuration
Budget Configuration screen Fields and Tabs
Field | Description |
Document | User selects the Budget Configuration for each Document. Each document can only have one configuration. |
Current Fiscal Year | Fiscal Year for the Current Year for Budget Preparation purposes. |
Execution Fiscal Year | Fiscal Year for the Execution Year (i.e.: Y-1). |
Actual Fiscal Year | Fiscal Year for the Actual (i.e.: Y-2). |
Projection 1 Fiscal Year | Fiscal Year for the 1st Indicative Year (i.e.: Y+1). |
Projection 2 Fiscal Year | Fiscal Year for the 1st Indicative Year (i.e.: Y+2). |
Projection 3 Fiscal Year | Fiscal Year for the 1st Indicative Year (i.e.: Y+3). |
Projection 4 Fiscal Year | Fiscal Year for the 1st Indicative Year (i.e.: Y+4). |
Budget Configuration Fiscal Year Tab | Fiscal Year that identify the data to be used from this Budget Version. |
Overview
Fiscal Year that identify the data to be used from this Budget Version.
Budget Configuration Fiscal Year Tab screen Fields
Field | Description |
Fiscal Year | Fiscal Year that identify the data to be used from this Budget Version. |
Budget Version | Current Budget Version to be selected. |
Overview
The Document entity of the Budget Book Builder is where users define each Budget Book. It is the parent record for all Document sections.
Navigation
Budget Book Builder ► Budget Book Documents
Budget Book Documents Screen Fields and Tab
Field | Description |
Application ID | This is a unique identifier that is automatically assigned by the system or manually entered by user depending on parameter. |
Active | It is ‘True’ by default. If it is switched to ‘FALSE’, then this Document is no longer active and cannot be used in future transactions. |
Name | A short description of the Document. |
Description | A detailed description of the Document. |
Page Number Format | Page Number format throughout the Budget Book. |
Institution | Institution selected by the user who creates the Section. |
Creation Date | Creation date and time for this Document. Automatically assigned by the system with current date and time of record creation. |
Different Odd and Even Pages | If checked, indicates that the header and footer will be in odd and even order in the pages of the document. |
Display Header | If checked, indicates that the header will be printed with the document. |
Display Footer | If checked, indicates that the footer will be printed with the document. |
Replace Sections | If checked, indicates that all sections have to be replaced when Document is being generated. |
Generate Table Of Contents | When is Checked, system will generate the Table of Content |
Display Volume In Table Of Contents | Default unchecked, Indicates if volume is to be included in the Table of Contents. |
Date Completed | Shows the completion date of the Document when all sections in Document has been generated |
Is fully Generated | Automatically updated to TRUE by the system when all sections in Document has been generated, to indicate that Document is fully generated. |
Template | Default Template to be used. Only word document is allowed by the system. |
Blank Document | Default Blank Page Document to be used. Only word document is allowed by the system. |
Header Size (In Inches) | Header size in inches to be used during Merge, to determine the size of the page Header added during merge. |
Footer Size (In Inches) | Footer size in inches to be used during Merge, to determine the size of the page Footer added during merge. |
Attachments Tab | It contains files attached by the user to support or detail features of the Document. |
Overview
It contains files attached by the user to support or detail features of the Document.
Attachments Tab screen Fields
Field | Description |
Id | A unique number auto generated by the system. |
Title | Title of the document attached. |
Description | Contains the description of the Attachment. |
Attachment | Document attached, selected from the 'Browse' option. |
Date Time | This shows the date and time of the last operation that has been performed on the attachment document. |
User | User that have uploaded or updated the document. |
Overview
The Document Section entity of the Budget Book Builder is where users define each section of the Budget Book such as cover pages, Microsoft Word, Microsoft Excel, Custom Reports, Crystal Reports, Jasper Reports, Images or PDF. Each section has an order in which it will be generated from the Document parent record.
Navigation
Budget Book Builder ► Budget Book Document Section
Document Section screen Fields and Tab
Field | Description |
Code | This is a unique identifier that is automatically assigned by the system or manually entered by user depending on parameter. |
Document | Select the Document ID that has this section. |
Document Section Workflow Status | Defines the current status of the section whether it is Created, Approved or yet to be Approved. Auto assigned by the system. |
Workflow Process Transition | Next available status for approval of the section. |
Is Active | It is ‘True’ by default. If it is switched to ‘FALSE’, then this Document Section is no longer active cannot be used in future transaction |
Show Page Number | If TRUE then the page number will be displayed in the Section as per the template. If FALSE the page number will not be displayed in the Section. |
Is Cover Page | If checked Cover page is available |
Display in Table of Contents | Indicates if the document section description is to be included in the Table of Contents. |
Parent Document Section | Used to display the hierarchy under the Table of Contents. |
File Type | The type of the file to be selected for the section. |
Order | To define Section printing order. System validate that Order cannot be repeated in Document Sections for the same Document. |
Orientation | The orientation of the created section. It can be portrait or landscape. |
Start on New Page | When is TRUE, the Section will be printed starting at a beginning of new page. When is FALSE the Section will be printed following the previous Section. |
Name | A short description of the Document Section. |
Description | A detailed description of the Document Section. |
Display Title | If checked, indicates that the section title will be printed. |
Different Odd and Even Pages | If checked, indicates that the header and footer will be in odd and even order in the pages of the document section. |
Create Blank Page if Odd | When is TRUE, if Section complete on an odd page then system will add a blank page. When is FALSE the System will not print additional page at the end of the Section. |
Display Header | If checked, indicates that the Header will be printed with the document section. |
Display Footer | If checked, indicates that the footer will be printed with the document section. |
File | Holds the file attachment. |
Institution | Identified the Institution whom handles the section. |
Header Size (In Inches) | Header size in inches to be used during Merge, to determine the size of the page Header added during merge. |
Footer Size (In Inches) | Footer size in inches to be used during Merge, to determine the size of the page Footer added during merge. |
Overview
Budget Book Builder helps user to order the section of budget book and also view any screen.
Navigation
Budget Book Builder ► Budget Book Layout
Budget Book Layout screen Fields & Tab
Field | Desciption |
Document | From this field users can select the previously created Document to build the budget book layout. |
Section Order | It displays the arranged order of the section of a document. |
Section ID | The code of the section. |
Section Name | The name of the section. |
Section Type | The file type of the attached section. |
Preview | By clicking the Preview command button the document displays on the screen in their own file type. The display order of the document on the screen is as per the created order in the section. |
Select | To select the section by clicking on checkbox. |
First command button | With the cursor on a line and clicking the First Command Button the current line will move to the first line. |
Up command button | With the cursor on a line and clicking the Up Command Button the current line will move one line up. |
Down command button | With the cursor on a line and clicking the Down Command Button the current line will move one line down. |
Last command button | With the cursor on a line and clicking the Last Command Button the current line will move to the last line. |
Overview
Budget Book Report Filter Criteria defines the Parameters to be configured for the report control. The system automatically populates the Parameter values configured in this entity for the report control selected by the user in the section while adding the section.
Navigation
Budget Book Builder ► Budget Book Report Filter Criteria
Budget Book Report Filter Criteria screen Fields and Tab
Field | Description |
Code | This is a unique identifier. Automatically assigned by the system or manually entered by the user, depending on parameter. When ID is automatically generated system will use the Prefix if Parameter “Prefix of Generated Budget Book Filter Criteria Id” is not empty and will Padding the Auto generated if parameter “Padding for auto generated Budget Book Report Filter Criteria Id” is equal to TRUE. |
Name | Name of the Budget Book Report Filter Criteria |
Active | This is a Boolean vale and by default it is true. When a Budget Book Filter Criteria is not active. This is not going to be used to populate the parameters at Document Section. |
Description | The description of the Budget Book Report Filter Criteria. |
Overview
A screenshot of the Expenditure Classification Standard Object Codes Categories and Object Titles Report is available here. Image shown as reference material; position and names for labels, fields and buttons are subject to parameter configuration, rendering control configuration and installed revision.
Users access the report from within the menu through this navigation path: Budget Planning ► Budget Book Builder ► Sri Lanka Reports ► Expenditure Classification Standard Object Codes Categories And Object Titles Report
Filters
The following table lists and describes all filter for the Expenditure Classification Standard Object Codes Categories and Object Titles Report, in their default order. Note that some filters depend on system parameters and rendering control to be visible and/or editable to users. Filter names are subject to change through language label configuration.
Field | Description |
---|---|
Scenario | Lookup filter criterion for the budget planning scenario. |
Planning CoA Group | Drop down filter criterion for the budget planning CoA group. |
Print Amount | Drop down filter criterion for the amount unit in the output report.
|
Execution CoA Group | Drop down filter criterion for the budget execution CoA group. |
Fiscal Year | Drop down filter criterion for the current fiscal year. |
Fiscal Year - 2 | Drop down filter criterion for the budget execution fiscal year. |
Fiscal Year - 1 | Drop down filter criterion for the budget actuals fiscal year. |
Budget Version (Fiscal Year) | Drop down filter criterion for the scenario budget version fiscal year. |
Fiscal Year 1 | Drop down filter criterion for the projection 1 fiscal year. |
Budget Version (Fiscal Year 1) | Drop down filter criterion for the scenario budget version fiscal year. |
Fiscal Year 2 | Drop down filter criterion for the projection 2 fiscal year. |
Budget Version (Fiscal Year 2) | Drop down filter criterion for the scenario budget version fiscal year. |
Comment | Allows users to add a custom comment to the generated report. |
Visible Fields
A sample of the Expenditure Classification Standard Object Codes Categories and Object Titles Report output is available here. The following table lists and describes all visible fields for the Classification Standard Object Codes Categories and Object Titles Report, in their default order. Note that some fields depend on System Parameters and rendering control configuration to be visible and/or editable by users. Field names are subject to change through language label configuration.
Field | Description |
---|---|
Object Code | Indicates the object codes of the expenditure element. |
Object Category / Title | Indicates the object category/ title of the expenditure element. |
Buttons
The following table describes actions associated with the depicted button image. Note that some images are associated with several buttons, used for more than one purpose within the Classification Standard Object Codes Categories and Object Titles Report.
Button Image | Description |
---|---|
This button allows users to generate the report as PDF. | |
This button allows users to generate the report as MS Excel. | |
This button allows users to generate the report as MS Excel (XLSX format). | |
This button allows users to generate the report as RTF. | |
This button allows users to generate the report as MS Word. |
Overview
Information on Revenue Summary is generated through this screen.
Navigation
Budget Planning ► Budget Book Builder ► Sri Lanka Reports ► Revenue Summary
Revenue Summary screen Fields
Field | Description |
Scenario | Budget Planning Scenario is selected from lookup button. |
Planning CoA Group | Budget Planning CoA Group is selected from drop down box. |
Print amount | Print the amount |
Execution CoA Group | Execution CoA Group is selected from drop down box. |
Fiscal Year | Fiscal Year is selected from drop down box. |
Fiscal Year - 2 | Two years before the current Fiscal Year is selected from drop down box. |
Fiscal Year - 1 | One year before the current Fiscal Year is selected from drop down box. |
Budget Version (Fiscal Year) | Budget Version is selected from the lookup button. |
Fiscal Year 1 | One year after the current Fiscal Year is selected from drop down box. |
Budget Version (Fiscal Year) | Relevant Budget Version is selected from the lookup button. |
Fiscal Year 2 | Two years after the current Fiscal Year is selected from drop down box. |
Budget Version (Fiscal Year 2) | Relevant Budget Version is selected from the lookup button. |
Comment | Comment on the report is entered in this field. |
Overview
Information on Program Expenditure Summary is generated through this screen.
Navigation
Budget Planning ► Budget Book Builder ► Sri Lanka Reports ► Program Expenditure Summary
Program Expenditure Summary screen Fields
Field | Description |
Scenario | Budget Planning Scenario is selected from lookup button. |
Planning CoA Group | Budget Planning CoA Group is selected from drop down box. |
Print amount | Print the amount |
Fiscal Year | Fiscal Year is selected from drop down box. |
Budget Version (Fiscal Year) | Relevant Budget Version is selected from the lookup button. |
Comment | Comment on the report is entered in this field. |
Overview
Information on National level Financing Summary is generated through this screen.
Navigation
Budget Planning ► Budget Book Builder ► Sri Lanka Reports ► National level Financing Summary
National level Financing Summary screen Fields
Field | Description |
Scenario | Budget Planning Scenario is selected from lookup button. |
Planning CoA Group | Budget Planning CoA Group is selected from drop down box. |
Print Amount | Print the amount |
Execution CoA Group | Execution CoA Group is selected from drop down box. |
Fiscal Year | Fiscal Year is selected from drop down box. |
Fiscal Year - 2 | Two years before the current Fiscal Year is selected from drop down box. |
Fiscal Year - 1 | One year before the current Fiscal Year is selected from drop down box. |
Budget Version (Fiscal Year) | Budget Version is selected from the lookup button. |
Comment | Comment on the report is entered in this field. |
Overview
Information on Expenditure Summary By Institutions is generated through this screen.
Navigation
Budget Planning ► Budget Book Builder ► Sri Lanka Reports ► Expenditure Summary By Institutions
Expenditure Summary By Institutions screen Fields
Field | Description |
Scenario | Budget Planning Scenario is selected from lookup button. |
Planning CoA Group | Budget Planning CoA Group is selected from drop down box. |
Print Amount | Print the amount |
Execution CoA Group | Execution CoA Group is selected from drop down box. |
Fiscal Year | Fiscal Year is selected from drop down box. |
Fiscal Year - 2 | Two years before the current Fiscal Year is selected from drop down box. |
Fiscal Year - 1 | One year before the current Fiscal Year is selected from drop down box. |
Budget Version (Fiscal Year) | Budget Version is selected from the lookup button. |
Fiscal Year 1 | One year after the current Fiscal Year is selected from drop down box. |
Budget Version (Fiscal Year) | Relevant Budget Version is selected from the lookup button. |
Fiscal Year 2 | Two years after the current Fiscal Year is selected from drop down box. |
Budget Version (Fiscal Year 2) | Relevant Budget Version is selected from the lookup button. |
Comment | Comment on the report is entered in this field. |
Overview
Information on Expenditure Summary by Categories and Object Codes is generated through this screen.
Navigation
Budget Planning ► Budget Book Builder ► Sri Lanka Reports ► Expenditure Summary by Categories and Object Codes
Expenditure Summary by Categories and Object Codes screen Fields
Field | Description |
Scenario | Budget Planning Scenario is selected from lookup button. |
Planning CoA Group | Budget Planning CoA Group is selected from drop down box. |
Print Amount | Print the amount |
Execution CoA Group | Execution CoA Group is selected from drop down box. |
Fiscal Year | Fiscal Year is selected from drop down box. |
Fiscal Year - 2 | Two years before the current Fiscal Year is selected from drop down box. |
Fiscal Year - 1 | One year before the current Fiscal Year is selected from drop down box. |
Budget Version (Fiscal Year) | Budget Version is selected from the lookup button. |
Fiscal Year 1 | One year after the current Fiscal Year is selected from drop down box. |
Budget Version (Fiscal Year 1) | Relevant Budget Version is selected from the lookup button. |
Fiscal Year 2 | Two years after the current Fiscal Year is selected from drop down box. |
Budget Version (Fiscal Year 2) | Relevant Budget Version is selected from the lookup button. |
Comment | Comment on the report is entered in this field. |
Overview
Navigation
Budget Planning ►Budget Book Builder ► Sri Lanka Reports ► Summary of Foreign Grant Expenditure Vs Receipts Report
Summary of Foreign Grant Expenditure Vs Receipts Report Screen Fields
Field | Description |
Scenario | Scenario, from the list of Active Scenarios, for which the report will be generated. |
Planning COA Group | COA Group, selected from the list of COA groups belonging to the Scenario selected previously. |
Print Amount | Print Amount here. |
Fiscal Year | Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year |
Budget Version (Fiscal Year) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 1 | This is the Projection 1 Fiscal Year |
Budget Version (Fiscal Year 1) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 2 | This is the Projection 2 Fiscal Year |
Budget Version (Fiscal Year 2) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Revenue Scenario | This is a container that allows the client to have several budget versions, sharing same ceiling structure (data can be different) and also same budget parameters. Through this parameter user can choose the scenario for which he wants to generate the report. |
Revenue Budget Version | Each budget version within same scenario will share Budget Scenario parameters, Budget Plan Structure and Budget Ceiling Information; however each budget version can have its own Budget Line Groups and some configuration (included in this entity). Through this parameter user can choose the scenario budget version for which he wants to generate the report. |
Overview
Information on Expendture Summary by Categories and Object Codes By Sector is generated through this screen.
Navigation
Budget Planning ► Budget Book Builder ► Sri Lanka Reports ► Expenditure Summary by Ministry ► Expendture Summary by Categories and Object Codes By Sector
Expendture Summary by Categories and Object Codes By Sector screen Fields
Field | Description |
Scenario | Budget Planning Scenario is selected from lookup button. |
Planning CoA Group | Budget Planning CoA Group is selected from drop down box. |
Execution CoA Group | Execution CoA Group is selected from drop down box. |
Fiscal Year | Fiscal Year is selected from drop down box. |
Fiscal Year - 2 | Two years before the current Fiscal Year is selected from drop down box. |
Fiscal Year - 1 | One year before the current Fiscal Year is selected from drop down box. |
Budget Version (Fiscal Year) | Budget Version is selected from the lookup button. |
Fiscal Year + 1 | One year after the current Fiscal Year is selected from drop down box. |
Budget Version (Fiscal Year + 1) | Relevant Budget Version is selected from the lookup button. |
Fiscal Year + 2 | Two years after the current Fiscal Year is selected from drop down box. |
Budget Version (Fiscal Year + 2) | Relevant Budget Version is selected from the lookup button. |
Comment | Comment on the report is entered in this field. |
Overview
Information on Summary of Expenditure by Ministry is generated through this screen.
Navigation
Budget Planning ► Budget Book Builder ► Sri Lanka Reports ► Expenditure Summary by Ministry ► Summary of Expenditure by Ministry
Summary of Expenditure by Ministry screen Fields
Field | Description |
Scenario | Budget Planning Scenario is selected from lookup button. |
Planning CoA Group | Budget Planning CoA Group is selected from drop down box. |
Print Amount | Print the amount |
Execution CoA Group | Execution CoA Group is selected from drop down box. |
Fiscal Year | Fiscal Year is selected from drop down box. |
Fiscal Year - 2 | Two years before the current Fiscal Year is selected from drop down box. |
Fiscal Year - 1 | One year before the current Fiscal Year is selected from drop down box. |
Budget Version (Fiscal Year) | Budget Version is selected from the lookup button. |
Fiscal Year 1 | One year after the current Fiscal Year is selected from drop down box. |
Budget Version (Fiscal Year 1) | Relevant Budget Version is selected from the lookup button. |
Fiscal Year 2 | Two years after the current Fiscal Year is selected from drop down box. |
Budget Version (Fiscal Year 2) | Relevant Budget Version is selected from the lookup button. |
Comment | Comment on the report is entered in this field. |
Overview
Information on Summary of Expenditure by Spending Agency and Programme is generated through this screen.
Navigation
Budget Planning ► Budget Book Builder ► Sri Lanka Reports ► Expenditure Summary by Ministry ► Summary of Expenditure by Spending Agency and Programme
Summary of Expenditure by Spending Agency and Programme screen Fields
Field | Description |
Scenario | Budget Planning Scenario is selected from lookup button. |
Planning CoA Group | Budget Planning CoA Group is selected from drop down box. |
Print Amount | Print the amount |
Execution CoA Group | Execution CoA Group is selected from drop down box. |
Fiscal Year | Fiscal Year is selected from drop down box. |
Fiscal Year - 2 | Two years before the current Fiscal Year is selected from drop down box. |
Fiscal Year - 1 | One year before the current Fiscal Year is selected from drop down box. |
Budget Version (Fiscal Year) | Budget Version is selected from the lookup button. |
Fiscal Year 1 | One year after the current Fiscal Year is selected from drop down box. |
Budget Version (Fiscal Year 1) | Relevant Budget Version is selected from the lookup button. |
Fiscal Year 2 | Two years after the current Fiscal Year is selected from drop down box. |
Budget Version (Fiscal Year 2) | Relevant Budget Version is selected from the lookup button. |
Comment | Comment on the report is entered in this field. |
Overview
This is a statutory budget report that is sent out to GoSL for discussion and approval. The report shows aggregated program and major expenditure category amounts for particular MSU. The amounts are broken up by Spending Agencies of this particular MSU.
Navigation
Budget Planning ►Budget Book Builder ► Sri Lanka Reports ► Expenditure Summary by Ministry ► Expenditure Summary by Spending Agency and Program Report
Expenditure Summary By Spending Agency Report Screen Fields
Field | Description |
Scenario | Through this parameter user can choose the scenario for which he wants to generate the report |
Planning CoA Group | The Default value is the CoA Group from Scenario CoA Group with attribute Lower level CoA Group equal to Null |
Print Amount | States the print amount |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | The current Fiscal Year |
Fiscal Year – 2 | This is the Budget Execution Fiscal Year |
Fiscal Year – 1 | This field states the Actuals Fiscal Year |
Budget Version (Fiscal Year) | First Budget Version in list. Alphabetically ascending order. |
Fiscal Year 1: | This field states the Projection 1 Fiscal Year |
Budget Version (Fiscal Year 1) | Budget version for Fiscal Year 1 |
Fiscal Year 2 | This field states the Projection 2 Fiscal Year |
Budget Version (Fiscal Year 2) | Budget version for Fiscal Year 2 |
Comment | Comment regarding the report |
Overview
This is a statutory budget report that is sent out to GoSL for discussion and approval. The report shows detailed estimates for Ministry’s expenditures at Agency, Unit, project, subproject levels for each Program. The amounts are broken up by expenditure major categories and Financing particularities.
Navigation
Budget Planning ►Budget Book Builder ► Sri Lanka Reports ►Expenditure Summary by Ministry ► Detailed Estimate by Spending Unit and Program Report
Expenditure Summary by Spending Agency and Program Screen Fields
Field | Description |
Scenario | Through this parameter user can choose the scenario for which he wants to generate the report |
Planning CoA Group | The Default value is the CoA Group from Scenario CoA Group with attribute Lower level CoA Group equal to Null |
Print Amount | States the print amount |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | The current Fiscal Year |
Fiscal Year – 2 | This is the Budget Execution Fiscal Year |
Fiscal Year – 1 | This field states the Actuals Fiscal Year |
Budget Version (Fiscal Year) | First Budget Version in list. Alphabetically ascending order. |
Fiscal Year 1: | This field states the Projection 1 Fiscal Year |
Budget Version (Fiscal Year 1) | Budget version for Fiscal Year 1 |
Fiscal Year 2 | This field states the Projection 2 Fiscal Year |
Budget Version (Fiscal Year 2) | Budget version for Fiscal Year 2 |
Comment | Comment regarding the report |
Overview
This report shows detailed estimates for Ministry’s expenditures at Agency, Unit, project, subproject levels for each Program. The amounts are broken up by expenditure major categories and Financing particularities.
Navigation
Budget Planning ►Budget Book Builder ► Sri Lanka Reports ►Appropriation Bill ► Schedule 1 - Expenditures on Appropriation Law Report
Schedule 1 - Expenditures On Appropriation Law Report Screen Fields
Field | Description |
Scenario | Budget Planning Scenario selected from lookup button for filtering records. |
Planning CoA Group | Planning CoA Group selected from drop down box for filtering records. |
Fiscal Year | Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Comment | Comment on the report is entered in this field. |
Overview
This is a statutory budget report (Schedules to Appropriation Bill) that is sent out to GoSL for discussion and approval. The report shows Summary of the expenditure estimates at program activity (Operational and Development) and expenditure object level (Recurrent and Capital) for budget financial year.
Navigation
Budget Planning ► Budget Book Builder ► Sri Lanka Reports ► Appropriation Bill ► Schedule 2 – Expenditures On Special Law Report
Schedule 2 – Expenditures On Special Law Report Field Description
Field | Description |
Scenario | Budget Planning Scenario selected from lookup button for filtering records. |
Planning CoA Group | Planning CoA Group selected from drop down box for filtering records. |
Fiscal Year | Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Additional Field | Descriibe in details if anything additional to mention. |
Comment | Comment on the report is entered in this field. |
Overview
Reports on limits of advance account activities are generated through this screen.
Navigation
Budget Planning ► Budget Book Builder ► Sri Lanka Reports ► Appropriation Bill ► Schedule 3 – Advance Account Limits
Schedule 3 – Advance Account Limits Screen Fields
Field | Description |
Scenario | Budget Planning Scenario is selected from lookup button. |
Planning CoA Group | Planning CoA Group is selected from the drop down box. |
Fiscal Year | Fiscal Year is selected from the drop down box for filtering records. |
Fiscal Year - 1 | One year before the Fiscal Year is selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | Budget Version is selected from the lookup button. |
Comment | Comment on the report is entered in this field. |
Overview
This is report shows the institutional policies, depending on the parameter selected as institution.
Navigation
Budget Planning ►Budget Book Builder ► Nicaragua Reports ► Fascicle Central Administration Reports► Institutional Policy Report
Institutional Policy Report screen Fields
Field | Description |
Scenario | Budget Planning Scenario is selected from lookup button. |
Planning CoA Group | Budget Planning CoA Group is selected from drop down box. |
Print amount | Print the amount |
Execution CoA Group | Execution CoA Group is selected from drop down box. |
Fiscal Year | Fiscal Year is selected from drop down box. |
Budget Version (Fiscal Year) | Budget Version is selected from the lookup button. |
Comment | Comment on the report is entered in this field. |
Overview
Reports of Economic Classification by program can be required and are generated by the Central Administrator from this screen.
Navigation
Budget Formulation ► Budget Book Builder ► Nicaragua Reports ► Fascicle Central Administration Report ► Economic Classification per Program Report
Fields of the Report of Economic Classification by Programs
Field | Description |
Scenario | Through this parameter user can choose the scenario for which he wants to generate the report |
Planning CoA Group | The Default value is the CoA Group from Scenario CoA Group with attribute Lower level CoA Group equal to Null |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | The current Fiscal Year |
Budget Version (Fiscal Year) | First Budget Version in list. Alphabetically ascending order. |
Comment | Comment regarding the report. |
Overview
Reports on Budget Credits per Expense Group and Program are generated from this screen.
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Fascicle Central Administration Reports ► Budget Credits Per Expense Group and Program Report
Budget Credits Per Expense Group and Program Report Screen Fields
Field | Description |
Scenario | Budget Planning Scenario is selected from lookup button for filtering records. |
Planning CoA Group | Planning CoA Group is selected from drop down box for filtering records. |
Execution CoA Group | Execution CoA Group is selected from drop down box for filtering records. |
Fiscal Year | Fiscal Year is selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | Budget Version is selected from lookup button which relate to Budget Scenario. |
Comment | Comment on the report entered in this field. |
Overview
Reports on Budget Assignments Per Expense Object can be required and are generated by Central Administrator from this screen.
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Fascicle Central Administration Reports ► Budget Assignments Per Expense Object Report
Budget Assignments Per Expense Object Report screen Fields
Field | Description |
Scenario | Budget Planning Scenario selected from lookup button for filtering records. |
Planning CoA Group | Planning CoA Group selected from drop down box for filtering records. |
Fiscal Year | Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | Fiscal Year selected from lookup button. |
Comment | Comment on the report entered in this field. |
Overview
Displays the description of each of the programs and subprograms registered in the Medium Term Expenditure Framework and belonging to the institution.
Navigation
Program And Subprogram Narrative Report Screen Fields
Field | Description |
Scenario | Through this parameter user can choose the scenario for which user wants to generate the report. |
Planning CoA Group | The Default value is the CoA Group from Scenario CoA Group with attribute Lower level CoA Group equal to Null. |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | The current Fiscal Year. |
Budget Version (Fiscal Year) | First Budget Version in list. Alphabetically ascending order. |
Comment | Comment regarding the report. |
Overview
Reports on details regarding capital expenditure are generated from this screen.
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Fascicle Central Administration Reports ► Capital Expense Details Report
Capital Expense Details Report screen Fields
Field | Description |
Scenario | Budget Planning Scenario is selected from lookup button for filtering records. |
Planning CoA Group | Planning CoA Group is selected from drop down box for filtering records. |
Execution CoA Group | Execution CoA Group is selected from drop down box for filtering records. |
Fiscal Year | Fiscal Year is selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | Budget version is selected from lookup button which relate to Budget Scenario. |
Comment | Comment on the report entered in this field. |
Overview
Fascicle Central Administration Report Screen Fields
Field | Description |
Scenario | Budget Planning Scenario is selected from lookup button. |
Planning CoA Group | Budget Planning CoA Group is selected from drop down box. |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | Fiscal Year is selected from drop down box. The current Fiscal Year |
Budget Version (Fiscal Year) | Budget Version is selected from the lookup button. |
Comment | Comment on the report is entered in this field. |
Overview
Show assigned amounts of all Consolidates Operations separated by Revenues and Expenses. Then, within each group (Revenues or Expenses), amounts are divided and displayed into Current and Capital. Data is displayed for the closed fiscal year (FY-2), for the fiscal year being executed (FY-1) and the fiscal year being planned (FY).
Navigation
Field | Description |
Scenario | Scenario, from the list of Active Scenarios, for which the report will be generated. |
Planning COA Group | COA Group, selected from the list of COA groups belonging to the Scenario selected previously. |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year |
Fiscal Year - 2 | Two year before the Fiscal Year is selected from drop down box for filtering records. |
Fiscal Year - 1 | One year before the Fiscal Year is selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Overview
This Fascicle contains multiple data sources. All the reports included here can be generated as one Report. These are the reports : Institution Narrative, Capital Expense Details and Budget assignments per Expense object.
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Fascicle Non Central Administration Reports ► Fascicle Non Central Administration Reports
Fascicle Non Central Administration Report Screen Fields
Field | Description |
Scenario | Scenario, from the list of Active Scenarios, for which the report will be generated. |
Planning COA Group | COA Group, selected from the list of COA groups belonging to the Scenario selected previously. |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year |
Fiscal Year - 2 | Two year before the Fiscal Year is selected from drop down box for filtering records. |
Fiscal Year - 1 | One year before the Fiscal Year is selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Overview
Show amounts assigned to Projections of Expenditures for programs and subprograms of the institution. Such information must be displayed for the current fiscal year, for closed fiscal year (FY-2), for fiscal year being executed (FY-1) and the projections for the next three fiscal years to come (FY+1, FY+2, FY+3).
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ►Fascicle Mid Term Budgets Report ► Consolidated Operations Report
Expenses Projections Per Program And Subprogram Report Screen Fields
Field | Description |
Scenario | Scenario, from the list of Active Scenarios, for which the report will be generated. |
Planning COA Group | COA Group, selected from the list of COA groups belonging to the Scenario selected previously. |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year |
Fiscal Year - 2 | Two year before the Fiscal Year is selected from drop down box for filtering records. |
Fiscal Year - 1 | One year before the Fiscal Year is selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 1 | This is the Projection 1 Fiscal Year |
Budget Version (Fiscal Year 1) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 2 | This is the Projection 2 Fiscal Year |
Budget Version (Fiscal Year 2) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 3 | This is the Projection 3 Fiscal Year |
Budget Version (Fiscal Year 3) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Comment | Comment on the report is entered in this field. |
Overview
Projections of scenarios for each program, Financing Type and Expense Group are generated through this screen by applying relevant filtering required for report generation.
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Fascicle Mid Term Budget Reports ► Projections By Program, Type And Expense Group Report
Projections By Program, Type And Expense Group Report screen Fields
Field | Description |
Scenario | Scenario, from the list of Active Scenarios, for which the report will be generated. |
Planning COA Group | COA Group, selected from the list of COA groups belonging to the Scenario selected previously. |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year |
Fiscal Year - 2 | Two year before the Fiscal Year is selected from drop down box for filtering records. |
Fiscal Year - 1 | One year before the Fiscal Year is selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 1 | This is the Projection 1 Fiscal Year. |
Budget Version (Fiscal Year 1) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 2 | This is the Projection 2 Fiscal Year. |
Budget Version (Fiscal Year 2) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 3 | This is the Projection 3 Fiscal Year. |
Budget Version (Fiscal Year 3) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Comment | Comment on the report is entered in this field. |
Overview
Projections of scenarios for each program and Financing Type are generated through this screen by applying relevant filtering required for report generation.
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Fascicle Mid Term Budget Reports ► Projections Per Program And Financing Type Report
Projections Per Program And Financing Type Report screen Fields
Field | Description |
Scenario | Budget Planning Scenario selected from lookup button for filtering records. |
Planning CoA Group | Planning CoA Group is selected from drop down box for filtering records. |
Execution CoA Group | Execution CoA Group is selected from drop down box for filtering records. |
Fiscal Year - 2 | Two Years before the current fiscal year is selected from drop down box. |
Fiscal Year - 1 | One year before the current fiscal year is selected from drop down box. |
Fiscal Year | Current fiscal year is selected from drop down box. |
Budget Version (Fiscal Year) | Budget Version for the Fiscal Year is selected from lookup button. |
Fiscal Year + 1 | One year after current Fiscal Year is selected from drop down box. |
Budget Version (Fiscal Year + 1) | Budget Version for the Fiscal Year plus one year is selected from lookup button. |
Fiscal Year + 2 | Two years after current Fiscal Year is selected from drop down box. |
Budget Version (Fiscal Year + 2) | Budget Version for the Fiscal Year plus two years is selected from lookup button. |
Fiscal Year + 3 | Three years after current Fiscal Year is selected from drop down box. |
Budget Version (Fiscal Year + 3) | Budget Version for the Fiscal Year plus three years is selected from lookup button. |
Comment | Comment on the report is entered in this field. |
Overview
Show amounts assigned to Projections of Expenditures for different Investment Projects. Such information must be displayed grouped by financing source type for the current fiscal year, for closed fiscal year (FY-2), for fiscal year being executed (FY-1) and the projections for the next three fiscal years to come (FY+1, FY+2, FY+3).
Navigation
Budget Formulation ► Budget Book Builder ► Nicaragua Reports ► Fascicle Mid Term Budget Report ► Projections Per Project And Financing Type Report
Projection Per Project and Financing Type Report Screen Fields
Field | Description |
Scenario | Scenario, from the list of Active Scenarios, for which the report will be generated. |
Planning COA Group | COA Group, selected from the list of COA groups belonging to the Scenario selected previously. |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year |
Fiscal Year - 2 | Two year before the Fiscal Year is selected from drop down box for filtering records. |
Fiscal Year - 1 | One year before the Fiscal Year is selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 1 | This is the Projection 1 Fiscal Year |
Budget Version (Fiscal Year 1) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 2 | This is the Projection 2 Fiscal Year |
Budget Version (Fiscal Year 2) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 3 | This is the Projection 3 Fiscal Year |
Budget Version (Fiscal Year 3) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Comment | Comment on the report is entered in this field. |
Overview
Indicators associated with each Program and Sub Program.
Navigation
Budget Formulation ► Budget Book Builder ► Nicaragua Reports ► Fascicle Mid Term Budget Report ► Product By Program And Sub Program Report
Product By Program And Sub Program Report Screen Fields
Field | Description |
Scenario | Scenario, from the list of Active Scenarios, for which the report will be generated. |
Planning COA Group | COA Group, selected from the list of COA groups belonging to the Scenario selected previously. |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year |
Fiscal Year - 2 | Two year before the Fiscal Year is selected from drop down box for filtering records. |
Fiscal Year - 1 | One year before the Fiscal Year is selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 1 | This is the Projection 1 Fiscal Year |
Budget Version (Fiscal Year 1) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 2 | This is the Projection 2 Fiscal Year |
Budget Version (Fiscal Year 2) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 3 | This is the Projection 3 Fiscal Year |
Budget Version (Fiscal Year 3) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Comment | Comment on the report is entered in this field. |
Overview
Indicators associated with each Institution.
Navigation
Budget Formulation ► Budget Book Builder ► Nicaragua Reports ► Fascicle Mid Term Budget Report ► Product By Institution Report
Product By Institution Report Screen Fields
Field | Description |
Scenario | Scenario, from the list of Active Scenarios, for which the report will be generated. |
Planning COA Group | COA Group, selected from the list of COA groups belonging to the Scenario selected previously. |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year |
Fiscal Year - 2 | Two year before the Fiscal Year is selected from drop down box for filtering records. |
Fiscal Year - 1 | One year before the Fiscal Year is selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 1 | This is the Projection 1 Fiscal Year |
Budget Version (Fiscal Year 1) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 2 | This is the Projection 2 Fiscal Year |
Budget Version (Fiscal Year 2) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 3 | This is the Projection 3 Fiscal Year |
Budget Version (Fiscal Year 3) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Comment | Comment on the report is entered in this field. |
Overview
This Fascicle contains multiple data sources like Institution Narrative , Product by Institution, Program and Subprogram Narrative, Product by Program and Subprogram, Expenses projections per Program and Subprogram ,Projections per Program and Financing Type, Projections per Project and Financing Type . All the reports included here can be generated as one Report.
Navigation
Budget Formulation ► Budget Book Builder ► Nicaragua Reports ► Fascicle Mid Term Budget Report ► Fascicle Mid Term Budget Report
Fascicle Mid Term Budget Report Screen Fields
Field | Description |
Scenario | Scenario, from the list of Active Scenarios, for which the report will be generated. |
Planning COA Group | COA Group, selected from the list of COA groups belonging to the Scenario selected previously. |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year |
Fiscal Year - 2 | Two year before the Fiscal Year is selected from drop down box for filtering records. |
Fiscal Year - 1 | One year before the Fiscal Year is selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 1 | This is the Projection 1 Fiscal Year |
Budget Version (Fiscal Year 1) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 2 | This is the Projection 2 Fiscal Year |
Budget Version (Fiscal Year 2) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 3 | This is the Projection 3 Fiscal Year |
Budget Version (Fiscal Year 3) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Comment | Comment on the report is entered in this field. |
Overview
This feature generates a report on Economic Classification Per Institution (Recurrent).
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Global Central Administration Reports ► Economic Classification Per Institution (Recurrent) Report
Economic Classification Per Institution (Recurrent) Report Field Description
Field | Description |
Scenario | Budget Planning Scenario selected from lookup button for filtering records. |
Planning CoA Group | Planning CoA Group selected from drop down box for filtering records. |
Fiscal Year | Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Comment | Coding Block Filter Type is selected using drop down menu. |
Overview
This feature generates a report on Budget Balance Of Revenue And Expenses Report.
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Global Central Administration Reports ► Budget Balance Of Revenue And Expenses Report
Budget Balance Of Revenue And Expenses Report Field Description
Field | Description |
Scenario | Budget Planning Scenario selected from lookup button for filtering records. |
Revenue Planning CoA Group | Revenue Planning CoA Group selected from drop down box for filtering records. |
Expense Planning COA Group | Expense Planning CoA Group selected from drop down box for filtering records. |
Fiscal Year | Fiscal Year selected from drop down box for filtering records. |
Expense Budget Version (Fiscal Year) | Expense Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Revenue Budget Version (Fiscal Year) | Revenue Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Comment | Comment on the report is entered in this field. |
Overview
This feature generates a report on Capital Expense Detail Projects And Others FY Report. Show capital expenditure detail for projects and others according to institutional classification per expenditure type.
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Global Central Administration Reports ► Capital Expense Detail Projects And Others FY Report
Capital Expense Detail Projects And Others FY Report Field Description
Field | Description |
Scenario | Budget Planning Scenario selected from lookup button for filtering records. |
Planning CoA Group | Planning CoA Group selected from drop down box for filtering records. |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Overview
This feature generates a report on Capital Expense Detail Projects And Others Report. Show accumulated amounts assigned per financing type for all projects belonging to entities that receive Assignment and Subventions.
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Global Central Administration Reports ► Capital Expense Detail Projects And Others Report
Capital Expense Detail Projects And Others Report Field Description
Field | Description |
Scenario | Budget Planning Scenario selected from lookup button for filtering records. |
Planning CoA Group | Planning CoA Group selected from drop down box for filtering records. |
Fiscal Year | Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Comment | Comment on the report is entered in this field. |
Overview
This feature generates a report on Classification Per Institution. Show consolidated expenses per institution. The report has two sections: first, a list of institutions with amount for current and capital expenses and the second section, amounts for amortization types.
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Reportes Globales de la Administración Central ► Classification Per Institution Report
Classification Per Institution Report Field Description
Field | Description |
Scenario | Budget Planning Scenario selected from lookup button for filtering records. |
Planning CoA Group | Planning CoA Group selected from drop down box for filtering records. |
Print Amount | Print Amount options can be selected from drop-down menu. |
Execution CoA Group | Execution CoA Group selected from drop down box for filtering records. |
Fiscal Year | Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Comment | Comment on the report is entered in this field. |
Overview
This feature generates a report on Deficit Financing Detail Report. Show the detail of expenditures related to donations and external loans, displayed by projects or activities plus Deficit Financing grouped by Organization and Financing Source Type.
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Global Central Administration Reports ► Deficit Financing Detail Report
Deficit Financing Detail Report Field Description
Field | Description |
Scenario | Budget Planning Scenario selected from lookup button for filtering records. |
Planning CoA Group | Planning CoA Group selected from drop down box for filtering records. |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Comment | Comment on the report is entered in this field. |
Overview
This feature generates a report on Economic Classification per Institution (Capital) Report. Show institutional economic classification of capital expenditure per each classification related to: remunerations, goods and services, transfers, Debt Services and expenditure total amounts per corresponding report (Capital expense, current expense and both).
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Reportes Globales de la Administración Central ► Economic Classification per Institution (Capital) Report
Economic Classification per Institution (Capital) Report Field Description
Field | Description |
Scenario | Budget Planning Scenario selected from lookup button for filtering records. |
Planning CoA Group | Planning CoA Group selected from drop down box for filtering records. |
Print Amount | Print Amount options can be selected from drop-down menu. |
Fiscal Year | Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Overview
This feature generates a report Expenditure Detail Per Program And Source Type Report. Show detail of programs per Financing Source Type, plus Amortization types and total, grouped by institution. This report has two sections: Section 1, programs listed per each institution and Section 2: Summary of amortization amounts with a general total for both, summary of programs and amortizations.
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Global Central Administration Reports ► Expenditure Detail Per Program And Source Type Report
Expenditure Detail Per Program And Source Type Report Field Description
Field | Description |
Scenario | Budget Planning Scenario selected from lookup button for filtering records. |
Planning CoA Group | Planning CoA Group selected from drop down box for filtering records. |
Fiscal Year | Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Comment | Comment on the report is entered in this field. |
Overview
This feature generates a report on Expense Detail Per Project And Others Per Source Type Report.
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Reportes Globales de la Administración Central ► Expense Detail Per Project And Others Per Source Type Report
Expense Detail Per Project And Others Per Source Type Report Field Description
Field | Description |
Scenario | Budget Planning Scenario selected from lookup button for filtering records. |
Planning CoA Group | Planning CoA Group selected from drop down box for filtering records. |
Print Amount | Print Amount options can be selected from drop-down menu. |
Fiscal Year | Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Overview
Show budget assignment for poverty expenses of central government related to projects for Heavily Indebted Poor Countries (HICP).
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Global Central Administration Reports ► External Debt Relief Assignment Report
External Debt Relief Assignment Report Field Description
Field | Description |
Scenario | Budget Planning Scenario selected from lookup button for filtering records. |
Planning CoA Group | Planning CoA Group selected from drop down box for filtering records. |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Comment | Comment on the report is entered in this field. |
Overview
This feature generates a report on Functional Expense Structure Fiscal Year Report. Show the functional expense structure assigned to each entity and for each functional concept, showing both internal and external amortization total amounts, a total of all amortizations, and a general total amount for expenses plus amortizations.
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Global Central Administration Reports ► Functional Expense Structure Fiscal Year Report
Functional Expense Structure Fiscal Year Report Field Description
Field | Description |
Scenario | Budget Planning Scenario selected from lookup button for filtering records. |
Planning CoA Group | Planning CoA Group selected from drop down box for filtering records. |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Comment | Comment on the report is entered in this field. |
Overview
This feature generates a report on Internal Public Debt Service Report. Shows in detail, expenses related to Internal Public Debt Service, presented by debt instruments, grouped by instrument type and by sector which the instrument belongs to.
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Global Central Administration Reports ► Internal Public Debt Service Report
Internal Public Debt Service Report Field Description
Field | Description |
Scenario | Budget Planning Scenario selected from lookup button for filtering records. |
Planning CoA Group | Planning CoA Group selected from drop down box for filtering records. |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Comment | Comment on the report is entered in this field. |
Overview
This feature generates a report on Municipal Transfers Report. Show amounts of transfers per geographic locations.
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Global Central Administration Reports ► Municipal Transfers Report
Municipal Transfers Report Field Description
Field | Description |
Scenario | Budget Planning Scenario selected from lookup button for filtering records. |
Planning CoA Group | Planning CoA Group selected from drop down box for filtering records. |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Overview
This feature generates a report on Public Investment Programs Report. Show accumulated amounts assigned per financing type for each institution.
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Global Central Administration Reports ► Public Investment Programs Report
Public Investment Programs Report Field Description
Field | Description |
Scenario | Budget Planning Scenario selected from lookup button for filtering records. |
Planning CoA Group | Planning CoA Group selected from drop down box for filtering records. |
Fiscal Year | Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Comment | Comment on the report is entered in this field. |
Overview
Show accumulated amount assigned of revenues for rents with specific destination source type and a total amount column of the report.
Navigation
Budget Book Builder ► Nicaragua Reports ► Revenue Budget per Institution
Revenue Budget per Institution Report screen Fields
Field | Description |
Scenario | Budget Planning Scenario selected from lookup button for filtering records. |
Planning CoA Group | Planning CoA Group selected from drop down box for filtering records. |
Print Amount | Print the amount |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Comment | Comment on the report is entered in this field. |
Overview
This feature generates a report on Revenues Budget per Item and Collecting Unit. Show accumulated amount of revenues per resource item, separately per collecting unit.
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Global Central Administration Reports ► Revenues Budget per Item and Collecting Unit Report
Revenues Budget per Item and Collecting Unit Report Field Description
Field | Description |
Scenario | Budget Planning Scenario selected from lookup button for filtering records. |
Planning CoA Group | Planning CoA Group selected from drop down box for filtering records. |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Overview
This feature generates a report on Budget By Gender Assignment Report. Present detail of expenditures related to Gender strategy, displayed institution and program and divided by Strategy Level.
Navigation
Budget Formulation ► Budget Book Builder ► Nicaragua Reports ► Global and Consolidated Operations Statistical Annex For Medium Term Reports ► Budget By Gender Assignment Report
Budget By Gender Assignment Report Screen Fields
Field | Description |
Scenario | Budget Planning Scenario selected from lookup button for filtering records. |
Planning CoA Group | Planning CoA Group selected from drop down box for filtering records. |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Comment | Comment on the report is entered in this field. |
Overview
Show expenses amounts which are assigned to projections of different institutions. Such information will be display for closed fiscal year (FY – 2), fiscal year under execution (FY - 1) and Fiscal Year being planned (current FY). Also, the projections for the next three years after current fiscal year (FY+1, FY+2, FY+3). All of this for current expenses, capital expenses and amortizations.
Navigation
Budget Formulation ► Budget Book Builder ► Nicaragua Reports ► Global and Consolidated Operations Statistical Annex For Medium Term Reports ► Classification By Type Of Expenditure Institution Report
Classification By Type Of Expenditure Institution Report Screen Fields
Field | Description |
Scenario | Scenario, from the list of Active Scenarios, for which the report will be generated. |
Planning COA Group | COA Group, selected from the list of COA groups belonging to the Scenario selected previously. |
Print Amount | Print Amount here. |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year |
Fiscal Year - 2 | Two year before the Fiscal Year is selected from drop down box for filtering records. |
Fiscal Year - 1 | One year before the Fiscal Year is selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 1 | This is the Projection 1 Fiscal Year |
Budget Version (Fiscal Year 1) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 2 | This is the Projection 2 Fiscal Year |
Budget Version (Fiscal Year 2) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 3 | This is the Projection 3 Fiscal Year |
Budget Version (Fiscal Year 3) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Comment | Comment on the report is entered in this field. |
Overview
Shows the functional structure within the institutional mid-term budget framework, grouping amounts by function concept and expense type for the two past fiscal years and the three next ones after current budget planning year.
This report has four sections.
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Global And Consolidated Operations Statistical Anex For Medim Term Reports ► Expense Functional Structure Report
Expense Functional Structure Report Fields Description
Field | Description |
Scenario | Using lookup button select the budget planning scenario. |
Planning CoA Group | Use drop down menu to select the CoA group. |
Print Amount | Print the amount |
Execution CoA Group | Use drop down menu to select the CoA group. |
Fiscal Year | Select the fiscal year as a filter option. |
Fiscal Year - 2 | Select the fiscal year as a filter option. |
Fiscal Year - 1 | Select the fiscal year as a filter option. |
Budget Version (Fiscal Year) | A budget version include a workflow because this is the header feature that includes a set of budget line groups which eventually could be sent for execution. |
Fiscal Year 1 | Select the fiscal year as a filter option. |
Budget Version (Fiscal Year 1) | Fiscal year of the budget version. A budget version include a workflow because this is the header feature that includes a set of budget line groups which eventually could be sent for execution. |
Fiscal Year 2 | Select the fiscal year as a filter option. |
Budget Version (Fiscal Year 2) | Fiscal year of the budget version. A budget version include a workflow because this is the header feature that includes a set of budget line groups which eventually could be sent for execution. |
Fiscal Year 3 | Select the fiscal year as a filter option. |
Budget Version (Fiscal Year 3) | Fiscal year of the budget version. A budget version include a workflow because this is the header feature that includes a set of budget line groups which eventually could be sent for execution. |
Comment | Short description or comment on the report search. |
Overview
Show expenses amounts which are assigned to projections of different institutions per Expenditure Type and Financing Source. Also, shows a consolidate section for Amortization and Amortization plus Expenditures. Such information will be display for closed fiscal year (FY – 2), fiscal year under execution (FY - 1) and Fiscal Year being planned (current FY). Also the projections for the next three years after current fiscal year (FY+1, FY+2, FY+3).
Navigation
Budget Formulation ► Budget Book Builder ► Nicaragua Reports ► Global and Consolidated Operations Statistical Annex For Medium Term Reports ► Projections Per Project And Financing Type Report
Institutional Classification Per Expenditure Type And Source Report Screen Fields
Field | Description |
Scenario | Scenario, from the list of Active Scenarios, for which the report will be generated. |
Planning COA Group | COA Group, selected from the list of COA groups belonging to the Scenario selected previously. |
Print Amount | Print Amount here. |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year |
Fiscal Year - 2 | Two year before the Fiscal Year is selected from drop down box for filtering records. |
Fiscal Year - 1 | One year before the Fiscal Year is selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 1 | This is the Projection 1 Fiscal Year |
Budget Version (Fiscal Year 1) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 2 | This is the Projection 2 Fiscal Year |
Budget Version (Fiscal Year 2) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 3 | This is the Projection 3 Fiscal Year |
Budget Version (Fiscal Year 3) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Comment | Comment on the report is entered in this field. |
Overview
Shows mid-term projects per institution and financing source.
This report has two sections:
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Institutional Projects Per Financing Source Report
Institutional Projects Per Financing Source Report screen Fields
Field | Description |
Scenario | Budget Planning Scenario selected from lookup button for filtering records. |
Planning CoA Group | Planning CoA Group selected from drop down box for filtering records. |
Fiscal Year | Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | Budget Version is selected from lookup button for filtering records. |
Fiscal Year + 1 | One year after Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year + 1) | Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Fiscal Year + 2 | Two years after Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year + 2) | Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Fiscal Year + 3 | Three years after Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year + 3) | Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Ceilings Coa Group | Ceiling Coa Group is selected from drop down box. |
Coding Block Filter Type | Coding Block Filter Type is selected from drop down menu. |
Overview
Show the assigned amounts and projections for the Public Debt Service, both internal and external. Such information will be displayed for the year already closed (FY-2), fiscal year under execution (FY-1) and the fiscal year being planned (FY). Furthermore, projections for the next three years (FY+1, FY+2, FY+3).
Navigation
Budget Formulation ► Budget Book Builder ► Nicaragua Reports ► Global and Consolidated Operations Statistical Annex For Medium Term Reports ► Public Debt Mid Term Projections Report
Public Debt Mid Term Projections Report Screen Fields
Field | Description |
Scenario | Scenario, from the list of Active Scenarios, for which the report will be generated. |
Planning COA Group | COA Group, selected from the list of COA groups belonging to the Scenario selected previously. |
Print Amount | Print Amount here. |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year |
Fiscal Year - 2 | Two year before the Fiscal Year is selected from drop down box for filtering records. |
Fiscal Year - 1 | One year before the Fiscal Year is selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 1 | This is the Projection 1 Fiscal Year |
Budget Version (Fiscal Year 1) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 2 | This is the Projection 2 Fiscal Year |
Budget Version (Fiscal Year 2) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 3 | This is the Projection 3 Fiscal Year |
Budget Version (Fiscal Year 3) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Comment | Comment on the report is entered in this field. |
Overview
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Report ► Other Report ► Budget Balance By Fund Report
Budget Balance By Fund Report Screen Fields
Field | Description |
Scenario | Budget Planning Scenario is selected from lookup button. |
Revenue Planning CoA Group | Budget Planning CoA Group is selected from drop down box. |
Expense Planning CoA Group | Budget Planning CoA Group is selected from drop down box. |
Print amount | Print the amount |
Execution CoA Group | Group short description |
Fiscal Year | Fiscal Year is selected from drop down box. |
Fiscal Year - 2 | Two year before the Fiscal Year is selected from drop down box for filtering records. |
Fiscal Year - 1 | One year before the Fiscal Year is selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | Relevant Budget Version is selected from the lookup button. |
Revised Revenue Budget Version (Fiscal Year) | Revised Revenue Budget Version is selected from the lookup button. |
Budgeted Revenue Budget Version (Fiscal Year) | Budgeted Revenue Budget Version is selected from the lookup button. |
Revised Expense Budget Version (Fiscal Year) | Revised Expense Budget Version is selected from the lookup button. |
Budgeted Expense Budget Version (Fiscal Year) | Budgeted Expense Budget Version is selected from the lookup button |
Expense Budget Version (Fiscal Year) | Expense Budget Version is selected from the lookup button. |
Revenue Budget Version (Fiscal Year) | Revenue Budget Version is selected from the lookup button. |
Fiscal Year 1 | First Budget Version in list. |
Fiscal Year 2 | Second Budget Version in list. |
Fiscal Year 3 | Third Budget Version in list. |
Comment | Comment on the report is entered in this field. |
Overview
Reports on Budget Ceiling per institution and Source Multi Year can be generated from this screen.
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Budget Ceilings Per Institution And Source Multi Year Report
Budget Ceilings Per Institution And Source Multi Year Report screen Fields
Field | Description |
Scenario | Budget Planning Scenario selected from lookup button for filtering records. |
Planning CoA Group | Planning CoA Group selected from drop down box for filtering records. |
Fiscal Year | Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | Budget Version is selected from lookup button for filtering records. |
Fiscal Year + 1 | One year after Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year + 1) | Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Fiscal Year + 2 | Two years after Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year + 2) | Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Fiscal Year + 3 | Three years after Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year + 3) | Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Ceilings Coa Group | Ceiling Coa Group is selected from drop down box. |
Coding Block Filter Type | Coding Block Filter Type is selected from drop down menu. |
Overview
This feature generates a report on Budget Ceilings Per Institution And Source Report. Show Budget ceilings per institution, expense type and its corresponding financing source type as well.
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Budget Ceilings Per Institution And Source Report
Budget Ceilings Per Institution And Source Report Screen Fields
Field | Description |
Scenario | Budget Planning Scenario selected from lookup button for filtering records. |
Planning CoA Group | Planning CoA Group selected from drop down box for filtering records. |
Fiscal Year | Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Ceilings Coa Group | Ceiling COA Group, selected from the list of COA groups belonging to the Scenario selected previously. |
Overview
Show the Central Government summary of assigned amount for the current fiscal year, history of execution in two years before current fiscal year (reference comparisons), and also, the next three years, including current fiscal year, with projected amounts for execution.
Navigation
Budget Formulation ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Central Gov Summary Expense Group Per Financial Source Report
Central Gov Summary Expense Group Per Financial Source Report Screen Field
Field | Description |
Scenario | Scenario, from the list of Active Scenarios, for which the report will be generated. |
Planning COA Group | COA Group, selected from the list of COA groups belonging to the Scenario selected previously. |
Print Amount | Print Amount here. |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year |
Fiscal Year - 2 | Two year before the Fiscal Year is selected from drop down box for filtering records. |
Fiscal Year - 1 | One year before the Fiscal Year is selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 1 | This is the Projection 1 Fiscal Year |
Budget Version (Fiscal Year 1) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 2 | This is the Projection 2 Fiscal Year |
Budget Version (Fiscal Year 2) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 3 | This is the Projection 3 Fiscal Year |
Budget Version (Fiscal Year 3) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Comment | Comment on the report is entered in this field. |
Overview
This shows by Institution, Program, Subprogram, project, activity and financing source, amounts corresponding to originals, actual and the difference between both of them.
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Detailed Analytical Budget Per Institution Report
Detailed Analytical Budget Per Institution Report Screen Fields
Field | Description |
Scenario | Budget Planning Scenario is selected from lookup button. |
Planning CoA Group | Budget Planning CoA Group is selected from drop down box. |
Print amount | Print the amount |
Fiscal Year | Fiscal Year is selected from drop down box. |
Budget Version (Fiscal Year) | Budget Version is selected from the lookup button. |
Budget Version (Fiscal Year) | Budget Version is selected from the lookup button. |
Overview
Shows the economic expense classification for central government. Also, former fiscal years and projections for three fiscal years after planning.
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Economic Classification Central Gov Report
Economic Classification Central Gov Report Fields Description
Field | Description |
Scenario | Using lookup button select the budget planning scenario. |
Planning CoA Group | Use drop down menu to select the CoA group. |
Execution CoA Group | Use drop down menu to select the CoA group. |
Fiscal Year | Select the fiscal year as a filter option. |
Fiscal Year - 2 | Select the fiscal year as a filter option. |
Fiscal Year - 1 | Select the fiscal year as a filter option. |
Budget Version (Fiscal Year) | A budget version include a workflow because this is the header feature that includes a set of budget line groups which eventually could be sent for execution. |
Fiscal Year + 1 | Select the fiscal year as a filter option. |
Budget Version (Fiscal Year + 1) | Fiscal year of the budget version. A budget version include a workflow because this is the header feature that includes a set of budget line groups which eventually could be sent for execution. |
Fiscal Year + 2 | Select the fiscal year as a filter option. |
Budget Version (Fiscal Year + 2) | Fiscal year of the budget version. A budget version include a workflow because this is the header feature that includes a set of budget line groups which eventually could be sent for execution. |
Fiscal Year + 3 | Select the fiscal year as a filter option. |
Budget Version (Fiscal Year + 3) | Fiscal year of the budget version. A budget version include a workflow because this is the header feature that includes a set of budget line groups which eventually could be sent for execution. |
Comment | Short description or comment on the report search. |
Overview
Show expenses amounts which are assigned to projections of different institutions per Expenditure Type and consolidated per institution. Such information will be display for closed fiscal year (FY – 2), fiscal year under execution (FY - 1) and Fiscal Year being planned (current FY). Also the projections for the next three years after current fiscal year (FY+1, FY+2, FY+3).
Navigation
Budget Formulation ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Expense Detail for Poverty Reduction Program Report
Expense Detail for Poverty Reduction Program Report Screen Fields
Field | Description |
Scenario | Scenario, from the list of Active Scenarios, for which the report will be generated. |
Planning COA Group | COA Group, selected from the list of COA groups belonging to the Scenario selected previously. |
Print Amount | Print Amount here. |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year |
Fiscal Year - 2 | Two year before the Fiscal Year is selected from drop down box for filtering records. |
Fiscal Year - 1 | One year before the Fiscal Year is selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 1 | This is the Projection 1 Fiscal Year |
Budget Version (Fiscal Year 1) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 2 | This is the Projection 2 Fiscal Year |
Budget Version (Fiscal Year 2) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 3 | This is the Projection 3 Fiscal Year |
Budget Version (Fiscal Year 3) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Comment | Comment on the report is entered in this field. |
Overview
Shows expense amounts which are assigned to projections of different institutions per Expenditure Type and group and also consolidated per institution. Such information will be display for closed fiscal year (FY – 2), fiscal year under execution (FY - 1) and Fiscal Year being planned (current FY). Also, the projections for the next three years after current fiscal year (FY+1, FY+2, FY+3).
This report has three sections:
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Expense Projections Per Expenditure Group And Type Report
Expense Projections Per Expenditure Group And Type Report Fields Description
Field | Description |
Scenario | Using lookup button select the budget planning scenario. |
Planning CoA Group | Use drop down menu to select the CoA group. |
Execution CoA Group | Use drop down menu to select the CoA group. |
Fiscal Year | Select the fiscal year as a filter option. |
Fiscal Year - 2 | Select the fiscal year as a filter option. |
Fiscal Year - 1 | Select the fiscal year as a filter option. |
Budget Version (Fiscal Year) | A budget version include a workflow because this is the header feature that includes a set of budget line groups which eventually could be sent for execution. |
Fiscal Year + 1 | Select the fiscal year as a filter option. |
Budget Version (Fiscal Year + 1) | Fiscal year of the budget version. A budget version include a workflow because this is the header feature that includes a set of budget line groups which eventually could be sent for execution. |
Fiscal Year + 2 | Select the fiscal year as a filter option. |
Budget Version (Fiscal Year + 2) | Fiscal year of the budget version. A budget version include a workflow because this is the header feature that includes a set of budget line groups which eventually could be sent for execution. |
Fiscal Year + 3 | Select the fiscal year as a filter option. |
Budget Version (Fiscal Year + 3) | Fiscal year of the budget version. A budget version include a workflow because this is the header feature that includes a set of budget line groups which eventually could be sent for execution. |
Comment | Short description or comment on the report search. |
Overview
Show expenses amounts which are assigned to projections of different institutions per Expenditure Type and consolidated per institution. Such information will be display for closed fiscal year (FY – 2), fiscal year under execution (FY - 1) and Fiscal Year being planned (current FY). Also the projections for the next three years after current fiscal year (FY+1, FY+2, FY+3).
This report has three sections:
Navigation
Financing Of Budget Effort To Reduce Poverty Report Screen Fields
Field | Description |
Scenario | Scenario, from the list of Active Scenarios, for which the report will be generated. |
Planning COA Group | COA Group, selected from the list of COA groups belonging to the Scenario selected previously. |
Print Amount | Print Amount here. |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year |
Fiscal Year - 2 | Two year before the Fiscal Year is selected from drop down box for filtering records. |
Fiscal Year - 1 | One year before the Fiscal Year is selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 1 | This is the Projection 1 Fiscal Year |
Budget Version (Fiscal Year 1) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 2 | This is the Projection 2 Fiscal Year |
Budget Version (Fiscal Year 2) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 3 | This is the Projection 3 Fiscal Year |
Budget Version (Fiscal Year 3) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Comment | Comment on the report is entered in this field. |
Overview
Show per institution and program, amounts executed for current fiscal year and two former years, and amounts projected for the three consecutive next years, including current fiscal year.
Navigation
Institution and Program Report Screen Fields
Field | Description |
Scenario | Scenario, from the list of Active Scenarios, for which the report will be generated. |
Planning COA Group | COA Group, selected from the list of COA groups belonging to the Scenario selected previously. |
Print Amount | Print Amount here. |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year |
Fiscal Year - 2 | Two year before the Fiscal Year is selected from drop down box for filtering records. |
Fiscal Year - 1 | One year before the Fiscal Year is selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 1 | This is the Projection 1 Fiscal Year |
Budget Version (Fiscal Year 1) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 2 | This is the Projection 2 Fiscal Year |
Budget Version (Fiscal Year 2) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 3 | This is the Projection 3 Fiscal Year |
Budget Version (Fiscal Year 3) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Comment | Comment on the report is entered in this field. |
Overview
It shows the difference between original and assigned Budget per item, institution and program, expense group and financing source.
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Institution Program Objects Originals And Assigned Report
Institution Program Objects Originals And Assigned Report Screen Fields
Field | Description |
Scenario | Budget Planning Scenario is selected from lookup button. |
Planning CoA Group | Budget Planning CoA Group is selected from drop down box. |
Print amount | Print the amount |
Fiscal Year | Fiscal Year is selected from drop down box. |
Budget Version (Fiscal Year) | Budget Version is selected from the lookup button. |
Budget Version (Fiscal Year) | Budget Version is selected from the lookup button. |
Overview
This shows by Institution and Resource, amounts corresponding to originals, actual and the difference between them.
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Institution Resources By Item Originals And Assigned Report
Institution Resources By Item Originals And Assigned Report Screen Fields
Field | Description |
Scenario | Budget Planning Scenario is selected from lookup button. |
Planning CoA Group | Budget Planning CoA Group is selected from drop down box. |
Fiscal Year | Fiscal Year is selected from drop down box. |
Budget Version (Fiscal Year) | Budget Version is selected from the lookup button. |
Budget Version (Fiscal Year) | Budget Version is selected from the lookup button. |
Overview
Shows the assigned amounts and projections for the Public Investment per Institution and Financing Source. Such information is displayed for the fiscal year under execution (FY-1) and the next three fiscal years projections, just as it corresponds to the Mid Term Budget Framework.
This report has three sections:
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Institutional Projection By Object Group Report
Institutional Projection By Object Group Report screen Fields
Field | Description |
Scenario | Budget Planning Scenario selected from lookup button for filtering records. |
Planning CoA Group | Planning CoA Group selected from drop down box for filtering records. |
Fiscal Year | Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | Budget Version is selected from lookup button for filtering records. |
Fiscal Year + 1 | One year after Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year + 1) | Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Fiscal Year + 2 | Two years after Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year + 2) | Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Fiscal Year + 3 | Three years after Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year + 3) | Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Ceilings Coa Group | Ceiling Coa Group is selected from drop down box. |
Coding Block Filter Type | Coding Block Filter Type is selected from drop down menu. |
Overview
Show the assigned amounts and projections for the Public Investment per Institution and Financing Source. Such information will be displayed for the fiscal year under execution (FY-1) and the next three fiscal years projections, just as it corresponds to the Mid Term Budget Framework.
This report has three sections:
Navigation
Budget Formulation ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Institutional Projections By Expense Type Report
Institutional Projections By Expense Type Report Screen Fields
Field | Description |
Scenario | Scenario, from the list of Active Scenarios, for which the report will be generated. |
Planning COA Group | COA Group, selected from the list of COA groups belonging to the Scenario selected previously. |
Print Amount | Print Amount here. |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | Fiscal Year during which the report generates. Automatically assigned by the system with current fiscal year |
Fiscal Year - 2 | Two year before the Fiscal Year is selected from drop down box for filtering records. |
Fiscal Year - 1 | One year before the Fiscal Year is selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 1 | This is the Projection 1 Fiscal Year |
Budget Version (Fiscal Year 1) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 2 | This is the Projection 2 Fiscal Year |
Budget Version (Fiscal Year 2) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Fiscal Year 3 | This is the Projection 3 Fiscal Year |
Budget Version (Fiscal Year 3) | This shows only budget versions that belongs to the scenario selected where attribute Active is set to TRUE (Active budget versions).Through this parameter one chooses the scenario budget version to generate the particular report. |
Comment | Comment on the report is entered in this field. |
Overview
Show the consolidate difference between original and assigned Budget for all institutions.
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► National Consolidated Originals And Assigned Report
National Consolidated Originals And Assigned Report Screen Fields
Field | Description |
Scenario | Budget Planning Scenario is selected from lookup button. |
Planning CoA Group | Budget Planning CoA Group is selected from drop down box. |
Print amount | Print the amount |
Fiscal Year | Fiscal Year is selected from drop down box. |
Budget Version (Fiscal Year) | Budget Version is selected from the lookup button. |
Budget Version (Fiscal Year) | Budget Version is selected from the lookup button. |
Overview
Show by Institution, Program, Subprogram, project, activity and financing source, amounts corresponding to originals, actual and the difference between both of them.
Navigation
Budget Formulation ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Programmatic Structure Originals And Assigned Report
Programmatic Structure Originals And Assigned Report Screen Fields
Field | Description |
Scenario | Budget Planning Scenario selected from lookup button for filtering records. |
Planning CoA Group | Planning CoA Group selected from drop down box for filtering records. |
Fiscal Year | Fiscal Year selected from drop down box for filtering records. |
Budget Version (Fiscal Year) | Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Budget Version (Fiscal Year) | Budget Version for the relevant fiscal year is selected from lookup button for filtering records. |
Overview
Display information of Public Investment Projects grouped by Institution.
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Public Investment Programs for Medium Term Budget Report
Cost Driver Hierarchy Screen Fields
Field | Description |
Fiscal Year | Reference to the fiscal year to which this Public Investment Programs For Medium Term Budget apply |
Fiscal Year 1 | This field states the Projection 1 Fiscal Year |
Fiscal Year 2 | This field states the Projection 2 Fiscal Year |
Fiscal Year 3 | This field states the Projection 3 Fiscal Year |
Overview
Show in detail, amounts assigned per resource item and financing type for each
Navigation
Budget Planning ► Budget Book Builder ► Nicaragua Reports ► Other Reports ► Resource Item Per Financing Type Report
Field | Description |
Scenario | Through this parameter user can choose the scenario for which user wants to generate the report |
Planning CoA Group | The Default value is the CoA Group from Scenario CoA Group with attribute Lower level CoA Group equal to Null |
Fiscal Year | The current Fiscal Year |
Budget Version (Fiscal Year) | First Budget Version in list. Alphabetically ascending order. |
Comment | Comment regarding the report |
Overview
Reports on summary of expenditure estimates by Ministries and Departments are generated from this screen.
Navigation
Budget Planning ► Budget Book Builder ► Jamaica Reports ► Summary of Expenditure Estimates of Ministries and Departments
Summary of Expenditure Estimates of Ministries and Departments screen Fields
Field | Description |
Scenario | Scenario, from the list of Active Scenarios, for which the report will be generated. |
Planning COA Group | COA Group, selected from the list of COA groups belonging to the Scenario selected previously. |
Fiscal Year | Fiscal Year will be defaulted by the system in every transaction where Fiscal Year is needed. |
Budget Version (Fiscal Year) | It manages the status and general information of each budget version. Each budget version within same scenario will share Budget Scenario parameters, Budget Plan Structure and Budget Ceiling Information; however each budget version can have its own Budget Line Groups and some configuration (included in this entity). |
Comment | It is a description field. User can enter any comment regurding the report. |
Overview
This report display the estimates by Sub Program and Activity, per each Head, Budget, Function, Sub Function and Program
Navigation
Budget Planning ► Budget Book Builder ► Jamaica Reports ► Estimates By Sub Program And Activity Report
Estimates By Sub Program And Activity Report screen Fields
Field | Description |
Scenario | Scenario from which the information is extracted for this report, from the list of active scenarios. |
Planning COA Group | COA Group, selected from the list of COA groups belonging to the Scenario selected previously. |
Execution CoA Group | Execution CoA Group is selected from drop down box for filtering records. |
Fiscal Year | Fiscal Year will be defaulted by the system in every transaction where Fiscal Year is needed. |
Fiscal Year – 2 | Two years before the current fiscal year is selected from drop down box. |
Fiscal Year – 1 | One year before the current fiscal year is selected from drop down box. |
Budget Version (Fiscal Year) | It manages the status and general information of each budget version. Each budget version within same scenario will share Budget Scenario parameters, Budget Plan Structure and Budget Ceiling Information; however each budget version can have its own Budget Line Groups and some configuration (included in this entity). |
Fiscal Year 1 | One year after the current fiscal year is selected from drop down box. |
Budget Version (Fiscal Year 1 | Budget Version is selected from lookup box for filtering records. |
Fiscal Year 2 | Two years after the current fiscal year is selected from drop down box. |
Budget Version (Fiscal Year 2) | Budget Version is selected from lookup box for filtering records. |
Fiscal Year 3 | Three years after the current fiscal year is selected from drop down box. |
Budget Version (Fiscal Year 3) | Budget Version is selected from lookup box for filtering records. |
Goal Scenario | Goal Scenario is selected from lookup box for filtering records. |
Goal CoA Group | Goal CoA groups will be used to establish the different levels and order to enter and manage budget plans. |
Goal Budget Version (Fiscal Year) | Budget Version is selected from lookup box for filtering records. |
Overview
This is a statutory budget report that is sent out to Government Of Jamaica for discussion and approval. The report shows detailed estimates for Ministries and Departments expenditures, for Financial Patterns Recurrent (1), Capital A (2), or Capital B (3).
Navigation
Budget Planning ►Budget Book Builder ► Jamaica Reports ► Statutory Provisions and Provisions to be Voted
Statutory Provisions and Provisions to be Voted screen fields and Tab
Field | Description |
Scenario | Through this parameter user can choose the scenario for which he wants to generate the report |
Planning CoA Group | The Default value is the CoA Group from Scenario CoA Group with attribute Lower level CoA Group equal to Null |
Print Amount | States the print amount |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | The current Fiscal Year |
Fiscal Year – 2 | Two years before the current fiscal year is selected from drop down box. |
Fiscal Year – 1 | One year before the current fiscal year is selected from drop down box. |
Budget Version (Fiscal Year) | First Budget Version in list. Alphabetically ascending order. |
Fiscal Year 1: | This field states the Projection 1 Fiscal Year |
Budget Version (Fiscal Year 1) | Budget version for Fiscal Year 1 |
Fiscal Year 2 | This field states the Projection 2 Fiscal Year |
Budget Version (Fiscal Year 2) | Budget version for Fiscal Year 2 |
Fiscal Year 3 | This field states the Projection 3 Fiscal Year |
Budget Version (Fiscal Year 3) | Budget version for Fiscal Year 3 |
Comment | Comment regarding the report |
Overview
Reports on summary of expenditure estimates by Ministries and Departments are generated from this screen.
Navigation
Budget Planning ► Budget Book Builder ► Jamaica Reports ► Summary of Expenditure Estimates by Ministries and Departments
Summary of Expenditure Estimates by Ministries and Departments screen Fields
Field | Description |
Scenario | Scenario, from the list of Active Scenarios, for which the report will be generated. |
Planning COA Group | COA Group, selected from the list of COA groups belonging to the Scenario selected previously. |
Fiscal Year | Fiscal Year will be defaulted by the system in every transaction where Fiscal Year is needed. |
Budget Version (Fiscal Year) | It manages the status and general information of each budget version. Each budget version within same scenario will share Budget Scenario parameters, Budget Plan Structure and Budget Ceiling Information; however each budget version can have its own Budget Line Groups and some configuration (included in this entity). |
Overview
This is a statutory budget report that is sent out to GoJ for discussion and approval. The report shows detailed estimates for Ministries and Departments expenditures, net of Appropriations in Aid, for Financial Patterns Recurrent (1), Capital A (2), or Capital B (3).
Navigation
Budget Planning ►Budget Book Builder ► Jamaica Reports ► Estimates of Expenditures
Estimates of Expenditures Screen Fields and Tab
Field | Description |
Scenario | Through this parameter user can choose the scenario for which he wants to generate the report |
Planning CoA Group | The Default value is the CoA Group from Scenario CoA Group with attribute Lower level CoA Group equal to Null |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | The current Fiscal Year |
Fiscal Year – 2 | This is the Budget Execution Fiscal Year |
Fiscal Year – 1 | This field states the Actuals Fiscal Year |
Budget Version (Fiscal Year) | First Budget Version in list. Alphabetically ascending order. |
Fiscal Year 1: | This field states the Projection 1 Fiscal Year |
Budget Version (Fiscal Year 1) | Budget version for Fiscal Year 1 |
Fiscal Year 2 | This field states the Projection 2 Fiscal Year |
Budget Version (Fiscal Year 2) | Budget version for Fiscal Year 2 |
Fiscal Year 3 | This field states the Projection 3 Fiscal Year |
Budget Version (Fiscal Year 3) | Budget version for Fiscal Year 3 |
Comment | It is a desription to enter any Comment regarding the report. |
Overview
This report display the estimates by Function, Sub Function and Programe, per each Head and Budget.
Navigation
Budget Planning ►Budget Book Builder ► Jamaica Reports ► Estimates By Function And Programe
Estimates by Function and Programe Report Screen Fields
Field | Description |
Scenario | Through this parameter user can choose the scenario for which he wants to generate the report |
Planning CoA Group | The Default value is the CoA Group from Scenario CoA Group with attribute Lower level CoA Group equal to Null |
Print Amount | States the print amount |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | The current Fiscal Year |
Fiscal Year – 2 | This is the Budget Execution Fiscal Year |
Fiscal Year – 1 | This field states the Actuals Fiscal Year |
Budget Version (Fiscal Year) | First Budget Version in list. Alphabetically ascending order. |
Fiscal Year 1: | This field states the Projection 1 Fiscal Year |
Budget Version (Fiscal Year 1) | Budget version for Fiscal Year 1 |
Fiscal Year 2 | This field states the Projection 2 Fiscal Year |
Budget Version (Fiscal Year 2) | Budget version for Fiscal Year 2 |
Fiscal Year 3 | This field states the Projection 3 Fiscal Year |
Budget Version (Fiscal Year 3) | Budget version for Fiscal Year 3 |
Comment | Comment regarding the report |
Goal Scenario | Goal Scenario is selected from lookup box for filtering records. |
Goal CoA Group | Goal CoA groups will be used to establish the different levels and order to enter and manage budget plans. |
Goal Budget Version (Fiscal Year) | Budget Version is selected from lookup box for filtering records. |
Overview
This is a statutory budget report that is sent out to GoJ for discussion and approval. The report shows detailed estimates for Ministries and Departments expenditures, net of Appropriations in Aid, for Financial Patterns Recurrent (1), Capital A (2), or Capital B (3).
Navigation
Budget Planning ►Budget Book Builder ► Jamaica Reports ►Summary of Total Expenditure Classified by Object
Summary of Total Expenditure Classified by Object Report Screen Fields
Field | Description |
Scenario | Through this parameter user can choose the scenario for which he wants to generate the report. |
Planning CoA Group | The Default value is the CoA Group from Scenario CoA Group with attribute Lower level CoA Group equal to Null. |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | The current Fiscal Year. |
Fiscal Year – 2 | This is the Budget Execution Fiscal Year. |
Fiscal Year – 1 | This field states the Actuals Fiscal Year. |
Budget Version (Fiscal Year) | First Budget Version in list. Alphabetically ascending order. |
Fiscal Year 1 | This field states the Projection 1 Fiscal Year. |
Budget Version (Fiscal Year 1) | Budget version for Fiscal Year 1. |
Fiscal Year 2 | This field states the Projection 2 Fiscal Year. |
Budget Version (Fiscal Year 2) | Budget version for Fiscal Year 2. |
Fiscal Year 3 | This field states the Projection 3 Fiscal Year. |
Budget Version (Fiscal Year 3) | Budget version for Fiscal Year 3. |
Comment | Comment regarding the report. |
Overview
This is a Supplementary Estimates budget report of GoJ. The report shows detailed information of estimates for Ministries expenditures, for Financial Patterns Recurrent (1), Capital A (2), or Capital B (3).
Navigation
Budget Planning ►Budget Book Builder ► Jamaica Reports ► Supplementary Estimates Report
First Supplementary Estimates Report Screen Fields
Fields | Description |
Fiscal Year | Mandatory parameter. Through this parameter users can choose the scenario fiscal year, from the list of Fiscal Years of the selected Scenario, for the first Budget Version to compare. |
Estimates Coa Group | COA Group selected by the user. Limited to the CoA Structure from the Active Budget Control Type. |
Overview
This is a Supplementary Estimates budget report of GoJ. The report shows consolidated estimate for Ministries expenditures, for Financial Patterns Recurrent (1), Capital A (2), or Capital B (3).
Navigation
Budget Planning ►Budget Book Builder ► Jamaica Reports ► Supplementary Estimates Summary
First Supplementary Estimates Summary Report screen fields and Tab
Fields | Description |
Fiscal Year | Mandatory parameter. Through this parameter users can choose the scenario fiscal year, from the list of Fiscal Years of the selected Scenario, for the first Budget Version to compare. |
Estimates Coa Group | COA Group selected by the user. Limited to the CoA Structure from the Active Budget Control Type. |
Overview:
This report will display the Total Recurrent Expenditures for all of Government by Ministry and Department. This report will also show last year’s Original and Revised budget amounts. It will also include a column for the actual budget from the current year.
Navigation:
Budget Planning ►Budget Book Builder ►Antigua Reports ► Recurrent Expenditure By Ministry And Departments Report
Recurrent Expenditure By Ministry And Departments Report screen fields:
Fields | Description |
Scenario | Filter criteria for Scenario. |
Planning CoA Group | Filter criteria for Planning CoA Group. |
Execution CoA Group | Filter criteria for Execution CoA Group. CoA Group with attribute “Budget Execution Level” equal to TRUE. |
Fiscal Year | Filter criteria for Fiscal Year |
Fiscal Year - 2 | Filter criteria for Fiscal Year 2 |
Fiscal Year - 1 | Filter criteria for Fiscal Year 1 |
Budget Version (Fiscal Year) | Through this parameter user can choose the scenario budget version for which he/she wants to generate the report. |
Comment | Comment on the report is entered in this field. |
Overview:
This report will display the Total Recurrent Expenditures for all of Government by Category, Summary Item and Standard Object. This report will also show last year’s Original and Revised budget amounts.
Navigation:
Budget Planning ►Budget Book Builder ►Antigua Reports ► Recurrent Expenditure By Category Item And Standard Object Report
Recurrent Expenditure By Category Item And Standard Object Report screen fields:
Fields | Description |
Scenario | Filter criteria for Scenario. |
Planning CoA Group | Filter criteria for Planning CoA Group. |
Execution CoA Group | Filter criteria for Execution CoA Group. CoA Group with attribute “Budget Execution Level” equal to TRUE. |
Fiscal Year | Filter criteria for Fiscal Year |
Fiscal Year - 2 | Filter criteria for Fiscal Year 2 |
Fiscal Year - 1 | Filter criteria for Fiscal Year 1 |
Budget Version (Fiscal Year) | Through this parameter user can choose the scenario budget version for which he/she wants to generate the report. |
Comment | Comment on the report is entered in this field. |
Overview:
This report will display the Summary for each Ministry, by Department. This report will break down the organization data by Revenue, Recurrent Expenditure and Capital Expenditure.
Navigation:
Budget Planning ►Budget Book Builder ►Antigua Reports ► Summary By Ministry And Department
Summary By Ministry And Department Report screen fields:
Fields | Description |
Scenario | Filter criteria for Scenario. |
Planning CoA Group | Filter criteria for Planning CoA Group. |
Fiscal Year | Filter criteria for Fiscal Year |
Budget Version (Fiscal Year) | Through this parameter user can choose the scenario budget version for which he/she wants to generate the report. |
Comment | Comment on the report is entered in this field. |
Overview:
This report will display the Summary for each Ministry, by Sub-Programme. This report will break down the organization data by Sub-Category (Salary & Wages, Goods & Services, Transfers, Public Debt, Minor Capital and Major Capital).
Navigation:
Budget Planning ►Budget Book Builder ►Antigua Reports ► Recurrent Expenditure By Ministry Dept SubProg And Catry
Recurrent Expenditure By Ministry Dept SubProg And Catry Report screen fields:
Fields | Description |
Scenario | Filter criteria for Scenario. |
Planning CoA Group | Filter criteria for Planning CoA Group. |
Fiscal Year | Filter criteria for Fiscal Year |
Budget Version (Fiscal Year) | Through this parameter user can choose the scenario budget version for which he/she wants to generate the report. |
Comment | Comment on the report is entered in this field. |
Overview:
This report will display the Recurrent Expenditures for all of Government by Ministry, Department, Sub-Programme, Activity and Detail Line Item. This report will also show last year’s Original and Revised budget amounts.
Navigation:
Budget Planning ►Budget Book Builder ►Antigua Reports ► RECURRENT EXPENDITURE BY MINISTRY / PROGRAMME / DETAIL ITEM
RECURRENT EXPENDITURE BY MINISTRY / PROGRAMME / DETAIL ITEM Report screen fields:
Fields | Description |
Scenario | Filter criteria for Scenario. |
Planning CoA Group | Filter criteria for Planning CoA Group. |
Execution CoA Group | Filter criteria for Execution CoA Group. CoA Group with attribute “Budget Execution Level” equal to TRUE. |
Fiscal Year | Filter criteria for Fiscal Year |
Fiscal Year - 2 | Filter criteria for Fiscal Year 2 |
Fiscal Year - 1 | Filter criteria for Fiscal Year 1 |
Budget Version (Fiscal Year) | Through this parameter user can choose the scenario budget version for which he/she wants to generate the report. |
Comment | Comment on the report is entered in this field. |
Overview:
This report will display the Total Recurrent Revenue for all of Government by Ministry and Department.
Navigation:
Budget Planning ►Budget Book Builder ►Antigua Reports ► Recurrent Revenue by Ministry and Department Report
Recurrent Revenue by Ministry and Department Report screen fields:
Fields | Description |
Scenario | Filter criteria for Scenario. |
Planning CoA Group | Filter criteria for Planning CoA Group. |
Execution CoA Group | Filter criteria for Execution CoA Group. CoA Group with attribute “Budget Execution Level” equal to TRUE. |
Fiscal Year | Filter criteria for Fiscal Year |
Fiscal Year - 2 | Filter criteria for Fiscal Year 2 |
Fiscal Year - 1 | Filter criteria for Fiscal Year 1 |
Budget Version (Fiscal Year) | Through this parameter user can choose the scenario budget version for which he/she wants to generate the report. |
Comment | Comment on the report is entered in this field. |
Overview:
This report will display the Total Recurrent Revenues for all of Government by Category, Summary Item and Standard Object. This report will also show last year’s Original and Revised budget amounts.
Navigation:
Budget Planning ►Budget Book Builder ►Antigua Reports ► Recurrent Revenue By Category And Summary Item And Standard Object
Recurrent Revenue By Category And Summary Item And Standard Object Report screen fields:
Fields | Description |
Scenario | Filter criteria for Scenario. |
Planning CoA Group | Filter criteria for Planning CoA Group. |
Execution CoA Group | Filter criteria for Execution CoA Group. CoA Group with attribute “Budget Execution Level” equal to TRUE. |
Fiscal Year | Filter criteria for Fiscal Year |
Fiscal Year - 2 | Filter criteria for Fiscal Year 2 |
Fiscal Year - 1 | Filter criteria for Fiscal Year 1 |
Budget Version (Fiscal Year) | Through this parameter user can choose the scenario budget version for which he/she wants to generate the report. |
Comment | Comment on the report is entered in this field. |
Overview:
This report will display the Recurrent Revenues for all of Government by Ministry, Department, Sub-Programme, Activity and Detail Line Item. This report will also show last year’s Original and Revised budget amounts.
Navigation:
Budget Planning ►Budget Book Builder ►Antigua Reports ► Recurrent Revenue By Ministry Programme Detail Report
Recurrent Revenue By Ministry / Programme / Detail Report screen fields:
Fields | Description |
Scenario | Filter criteria for Scenario. |
Planning CoA Group | Filter criteria for Planning CoA Group. |
Execution CoA Group | Filter criteria for Execution CoA Group. CoA Group with attribute “Budget Execution Level” equal to TRUE. |
Fiscal Year | Filter criteria for Fiscal Year |
Fiscal Year - 2 | Filter criteria for Fiscal Year 2 |
Fiscal Year - 1 | Filter criteria for Fiscal Year 1 |
Budget Version (Fiscal Year) | Through this parameter user can choose the scenario budget version for which he/she wants to generate the report. |
Comment | Comment on the report is entered in this field. |
Overview
This report shows the total capital expenditures budget by ministry and department.
A screenshot of the Capital Expenditure By Ministry And Department Report feature is available here. Image shown as reference material; position and names for labels, fields and buttons are subject to parameter, rendering control configuration and installed revision.
Users access the report from within the menu through this navigation path: Budget Planning ►Budget Book Builder ►Antigua Reports ► Capital Expenditure By Ministry And Department
Filters
The following table lists and describes all filter for the Capital Expenditure By Ministry And Department Report, in their default order. Note that some filters depend on system parameters and rendering control to be visible and/or editable to users. Filter names are subject to change through language label configuration.
Fields | Description |
---|---|
Scenario | Lookup filter criterion for the budget planning scenario. |
Planning CoA Group | Drop down filter criterion for the budget planning CoA group. |
Print Amount | Drop down filter criterion for the amount unit in the output report.
|
Execution CoA Group | Drop down filter criterion for the budget execution CoA group. |
Fiscal Year | Drop down filter criterion for the current fiscal year. |
Fiscal Year - 2 | Drop down filter criterion for the budget execution fiscal year. |
Fiscal Year - 1 | Drop down filter criterion for the budget actuals fiscal year. |
Budget Version (Fiscal Year) | Drop down filter criterion for the scenario budget version fiscal year. |
Comment | Allows users to add a custom comment to the generated report. |
Visible Fields
The following table lists and describes all visible fields for the Capital Expenditure By Ministry And Department Report, in their default order. Note that some fields depend on System Parameters and rendering control configuration to be visible and/or editable by users. Field names are subject to change through language label configuration. A sample of the Capital Expenditure By Ministry And Department Report outputis available here.
Field | Description |
---|---|
CODE | Indicates the object codes of the ministry and department. |
DESCRIPTION | Indicates the object category/ title of the expenditure element. |
BUDGET | Shows budget plan amount of the current fiscal year. |
ORIGINAL | Shows the original budget control amount of the prior year |
REVISED | Shows the revised budget control amount of the prior year |
ACTUAL | Shows the budget control YTD actual amount of two years prior. |
Buttons
The following table describes actions associated with the depicted button image. Note that some images are associated with several buttons, used for more than one purpose within the Capital Expenditure By Ministry And Department Report.
Button Image | Description |
---|---|
This button allows users to generate the report as PDF. | |
This button allows users to generate the report as MS Excel. | |
This button allows users to generate the report as MS Word. | |
This button allows users to generate the report as RTF. | |
This button allows users to generate the report as ODT. | |
This button allows users to generate the report as ODS. |
Overview
This report shows the total capital expenditures for all of government by programme and activity.
A screenshot of the Capital Expenditure By Programme And Activity Report feature is available here. Image shown as reference material; position and names for labels, fields and buttons are subject to parameter, rendering control configuration and installed revision.
Users access the report from within the menu through this navigation path: Budget Planning ►Budget Book Builder ►Antigua Reports ► Capital Expenditure By Programme And Activity
Filters
The following table lists and describes all filter for the Capital Expenditure By Programme And Activity Report, in their default order. Note that some filters depend on system parameters and rendering control to be visible and/or editable to users. Filter names are subject to change through language label configuration.
Fields | Description |
---|---|
Scenario | Lookup filter criterion for the budget planning scenario. |
Planning CoA Group | Drop down filter criterion for the budget planning CoA group. |
Print Amount | Drop down filter criterion for the amount unit in the output report.
|
Execution CoA Group | Drop down filter criterion for the budget execution CoA group. |
Fiscal Year | Drop down filter criterion for the current fiscal year. |
Fiscal Year - 2 | Drop down filter criterion for the budget execution fiscal year. |
Fiscal Year - 1 | Drop down filter criterion for the budget actuals fiscal year. |
Budget Version (Fiscal Year) | Drop down filter criterion for the scenario budget version fiscal year. |
Comment | Allows users to add a custom comment to the generated report. |
Visible Fields
The following table lists and describes all visible fields for the Capital Expenditure By Programme And Activity Report, in their default order. Note that some fields depend on System Parameters and rendering control configuration to be visible and/or editable by users. Field names are subject to change through language label configuration. A sample of the Capital Expenditure By Programme And Activity Report output is available here.
Field | Description |
---|---|
CODE | Indicates the object codes of the programme and activity. |
DESCRIPTION | Indicates the object category/ title of the expenditure element. |
BUDGET | Shows budget plan amount of the current fiscal year. |
ORIGINAL | Shows the original budget control amount of the prior year |
REVISED | Shows the revised budget control amount of the prior year |
ACTUAL | Shows the budget control YTD actual amount of two years prior. |
Buttons
The following table describes actions associated with the depicted button image. Note that some images are associated with several buttons, used for more than one purpose within the Capital Expenditure By Programme And Activity Report.
Button Image | Description |
---|---|
This button allows users to generate the report as PDF. | |
This button allows users to generate the report as MS Excel. | |
This button allows users to generate the report as MS Word. | |
This button allows users to generate the report as RTF. | |
This button allows users to generate the report as ODT. | |
This button allows users to generate the report as ODS. |
Overview
This report shows the total capital expenditures for all of government by ministry, department, sub-programme, activity and detail item.
A screenshot of the Capital Expenditures By Ministry Programme Detail Item Report feature is available here. Image shown as reference material; position and names for labels, fields and buttons are subject to parameter, rendering control configuration and installed revision.
Users access the report from within the menu through this navigation path: Budget Planning ►Budget Book Builder ►Antigua Reports ► Capital Expenditures By Ministry Programme Detail Item Report
Filters
The following table lists and describes all filter for the Capital Expenditures By Ministry Programme Detail Item Report, in their default order. Note that some filters depend on system parameters and rendering control to be visible and/or editable to users. Filter names are subject to change through language label configuration.
Fields | Description |
---|---|
Scenario | Lookup filter criterion for the budget planning scenario. |
Planning CoA Group | Drop down filter criterion for the budget planning CoA group. |
Print Amount | Drop down filter criterion for the amount unit in the output report.
|
Execution CoA Group | Drop down filter criterion for the budget execution CoA group. |
Fiscal Year | Drop down filter criterion for the current fiscal year. |
Fiscal Year - 2 | Drop down filter criterion for the budget execution fiscal year. |
Fiscal Year - 1 | Drop down filter criterion for the budget actuals fiscal year. |
Budget Version (Fiscal Year) | Drop down filter criterion for the scenario budget version fiscal year. |
Comment | Allows users to add a custom comment to the generated report. |
Visible Fields
The following table lists and describes all visible fields for the Capital Expenditures By Ministry Programme Detail Item Report, in their default order. Note that some fields depend on System Parameters and rendering control configuration to be visible and/or editable by users. Field names are subject to change through language label configuration. A sample of the Capital Expenditures By Ministry Programme Detail Item Report output is available here.
Field | Description |
---|---|
CODE | Indicates the object codes of the ministry, department, sub-programme, activity and detail item. |
DESCRIPTION | Indicates the object category/ title of the expenditure element. |
BUDGET | Shows budget plan amount of the current fiscal year. |
ORIGINAL | Shows the original budget control amount of the prior year |
REVISED | Shows the revised budget control amount of the prior year |
ACTUAL | Shows the budget control YTD actual amount of two years prior. |
Buttons
The following table describes actions associated with the depicted button image. Note that some images are associated with several buttons, used for more than one purpose within the Capital Expenditures By Ministry Programme Detail Item Report.
Button Image | Description |
---|---|
This button allows users to generate the report as PDF. | |
This button allows users to generate the report as MS Excel. | |
This button allows users to generate the report as MS Word. | |
This button allows users to generate the report as RTF. | |
This button allows users to generate the report as ODT. | |
This button allows users to generate the report as ODS. |
Overview:
This report will display the Total Capital Revenue for all of Government by Ministry and Department.
Navigation:
Budget Planning ►Budget Book Builder ►Antigua Reports ► Capital Revenue by Ministry and Department Report
Capital Revenue by Ministry and Department Report screen fields:
Fields | Description |
Scenario | Filter criteria for Scenario. |
Planning CoA Group | Filter criteria for Planning CoA Group. |
Execution CoA Group | Filter criteria for Execution CoA Group. CoA Group with attribute “Budget Execution Level” equal to TRUE. |
Fiscal Year | Filter criteria for Fiscal Year |
Fiscal Year - 2 | Filter criteria for Fiscal Year 2 |
Fiscal Year - 1 | Filter criteria for Fiscal Year 1 |
Budget Version (Fiscal Year) | Through this parameter user can choose the scenario budget version for which he/she wants to generate the report. |
Comment | Comment on the report is entered in this field. |
Overview:
This report will display the Capital Revenues for all of Government by Ministry, Department, Sub-Programme, Activity and Detail Line Item. This report will also show last year’s Original and Revised budget amounts.
Navigation:
Budget Planning ►Budget Book Builder ►Antigua Reports ► Capital Revenue By Ministry Programme Detail Item Report
Capital Revenue By Ministry Programme Detail Item Report screen fields:
Fields | Description |
Scenario | Filter criteria for Scenario. |
Planning CoA Group | Filter criteria for Planning CoA Group. |
Execution CoA Group | Filter criteria for Execution CoA Group. CoA Group with attribute “Budget Execution Level” equal to TRUE. |
Fiscal Year | Filter criteria for Fiscal Year |
Fiscal Year - 2 | Filter criteria for Fiscal Year 2 |
Fiscal Year - 1 | Filter criteria for Fiscal Year 1 |
Budget Version (Fiscal Year) | Through this parameter user can choose the scenario budget version for which he/she wants to generate the report. |
Comment | Comment on the report is entered in this field. |
Overview
This is a container that allows to have several budget versions, sharing same ceiling structure (data can be different) and also same budget parameters.
A Budget Planning Scenario can be used for budget planning and also for forecasting purposes. A Budget Planning Scenario contains information about Budget Planning Scenario Fiscal Year that has the collection (one to many) of fiscal years allowed to each Scenario which can be used for scenario forecasting and also to accommodate concepts such as MTBF (Medium Term Budget Framework). It also contains a Budget Planning Scenario CoA Group that has the collection (one to many) of CoA groups allowed in each Scenario which will be used to establish the different levels of budget plans within the COA hierarchy.
Navigation
Budget Planning ► Support Entities ► Scenarios ► Budget Planning Scenario
Budget Planning Scenario Screen Fields and Tabs
Field | Description |
Code | This is a unique identifier that is automatically assigned by the system, if the system parameter Generate Scenario ID is set to True, or manually entered by the user if the system parameter Generate Scenario ID is set to false. |
Active | This field is true by default. If user switches this to FALSE then this scenario cannot be used in future transactions. |
CoA | The User must select the CoA which is going to be used for this scenario. |
Administrator | This is the user who acts as an administrator for this scenario who will have the permissions to manage administration functions related to the scenario. |
Consolidated Amounts Distribution Type | This attribute will define type of propagation of changes of consolidated amounts. Possible values are ‘Manual’ or ‘Automatic’. If this parameter is set to “Manual”, each budget plan responsible user will need to update the budget plan amounts, after a consolidated amount is modified. If the parameter is set to “Automatic”, the system will automatically propagate the changes of consolidated amounts to lower levels budget plans. |
Fiscal Period Distribution Needed | The default value is FALSE. If this value is switched to true then the system will allow entering information at the fiscal period level. This distribution can be done in any moment of the budget planning process. |
Rounding Value | Rounding value applied to Budget LIne Domestic Amount, Budget Line Foreign Amount and Budget Line Distribution Amount. |
Method of Rounding | Method of rounding. |
Language | Country specific language that is used to describe the Budget Planning Scenario. |
Name | The name of the Budget Planning Scenario. |
Description | This contains the full description of the scenario. |
Budget Planning Scenario Fiscal Year Tab | This contains the collection (one to many) of fiscal years allowed to each Scenario that can be used for scenario forecasting and also to accommodate concepts, such as MTBF (Medium Term Budget Framework). |
Budget Planning Scenario CoA Group Tab | This contains the collection (one to many) of CoA groups allowed to each Scenario that will be used to establish the different levels of budget plans, with the COA hierarchy. |
Fiscal Period Distribution Tab | This contains the collection of coding block expressions used for distribution if Fiscal Period Distribution Method is “Automatic Uniform” of “Automatic Weighted”, as well as the percentages used by the “Automatic Weighted” method. |
Attachments Tab | This attribute is used to attach one or more files to detail features of the Scenario. |
Overview
This contains the collection (one to many) of fiscal years allowed to each Scenario that can be used for scenario forecasting and also to accommodate concepts, such as MTBF (Medium Term Budget Framework).
Budget Planning Scenario Fiscal Year Tab screen Fields
Field | Description |
Fiscal Year | This attribute will contain the Fiscal Year that is to be allowed in the Scenario. |
Apply for Budget Planning | This is False by default. If it is switched to true then the fiscal year will be used for budget planning and also for forecasting purpose. |
Budget Plans Read Only | If checkbox is not selected, Budget Line Detail Data Entry can be done for this Scenario Fiscal Year, otherwise the Budget Line Detail information is read-only. |
Apply Ceilings | This is False by default. If set to true, the system will verify that each budget line entered manually or automatically is associated to a Budget Ceiling and Budget Line Coding Block should be validated when inserting a new Budget Line. |
Overview
This contains the collection (one to many) of CoA groups allowed to each Scenario that will be used to establish the different levels of budget plans, with the COA hierarchy.
Budget Planning Scenario CoA Group Tab screen Fields
Field | Description |
CoA Group | This is the reference to the CoA Group that is to be allowed in the Scenario. |
Apply For Ceilings | The default value of this attribute is true. If this checkbox is not ticked, this CoA Group level won't be used for ceilings definition and validation, it will only be used for budget planning data entry. |
Is Mandatory to Apply to All Budget Lines | It is to determine whether it will apply to all Budget Lines or not. Default value TRUE when "Apply for Ceilings?" is TRUE, otherwise FALSE. User can change to TRUE only when "Apply for Ceilings?" is TRUE. |
Is Display Ceiling Amount In Validation Message | Default is True meaning that the Ceiling Amount is included in the Ceilings Validation message. If set to False, the Ceiling Amount will not displayed in the Ceilings Validation message. |
Lower Level CoA Group | This attribute is a circular reference to a different Scenario CoA Group which will be in the lower level. |
Scale For Data Entry And Display Budget Ceilings | Close domain with possible values: "UNIT" - "1" "TEN" - "10" "HUNDRED" - "100" "THOUSANDS" - "1000" "TEN_THOUSANDS" - "10000" "MILLION" - "1000000" "BILLIONS" - "1000000000" "TRILLIONS" - "1000000000000" During data entry of Budget Ceiling, system will show scale to be used for data entry and display of Budget Ceiling amounts. If set to "THOUSAND - 1000", the Budget Ceiling Amounts will be in 1000. This is only for display, system should save in database amounts in units, and only use this parameter for data entry and display. |
Overview
This attribute is used to attach one or more files to detail features of the Scenario.
Attachments Tab screen Fields
Field | Description |
Id | An unique number auto generated by the system. |
Attachment Classification | Types of attachment. Document Type like- PDF, Word, excel etc |
Language | It represents the language of the document. |
Title | Title of the document attached. |
Description | This is defined by users and contains the description of the Attachment. |
Attachment | The document to be attached is to be selected from the 'Browse' option. |
Date Time | This shows the date and time of the last operation that has been performed on the attachment document. |
Date | Manually enter by the user for the Attachment date. |
User | This is the last user who have uploaded or updated the document. |
Language | This is the language used in the attachment file. |
Overview
This contains the collection of coding block expressions used for distribution if Fiscal Period Distribution Method is “Automatic Uniform” of “Automatic Weighted”, as well as the percentages used by the “Automatic Weighted” method.
Field | Description |
Fiscal Year | Collection of 1 to many Scenario Fiscal Year(s). |
CoA Group | This will contain a collection (one to many) of CoA groups allowed to each Scenario. |
Coding Block Type Definition | Users need to enter either a coding block or an expression. Level of the mentioned coding block will be the lowest level defined in Scenario COA Group entity. A coding block expression will allow defining a group of coding blocks. |
Overview
Distribution detail per each fiscal period.
Field | Description |
Distribution Concept | Refers to the Distribution Concept. |
Remaining | Indicates if the detail will distribute remaining amount. |
Percentage | Value bewteen 1.00 to 100.00 with 2 decimals. The sum of this field for all concepts in this entity, and same scenario or Version can't exceed 100.00 |
Overview
Restricted Transfer during Scenario Calculation.
Navigation
Budget Planning ► Support Entities ► Scenario ► Scenario Calculation Restricted Transfer
Scenario Calculation Restricted Transfer Screen Fields
Field | Description |
Code | This represents the unique ID of a Scenario Transfer Restricted Transfer entity, which is generated automatically by the system or entered by the user. |
CoA | Indicates whether this record is active or inactive. |
Segment | Name of the Product. |
Concept | A concept within the COA represents a collection of elements. Each segment must have 1 or more concepts. |
Left Expression | It will allow the user to enter an expression. |
Right Expression | It will allow the user to enter an expression. |
Language | Language used to describe Cost Driver Hierarchy to be selected from dropdown box. |
Name | Name of the Cost Driver Hierarchy. |
Description | Description of the Cost Driver Hierarchy. |
Overview
Budget Planning Scenario Parameter allows users to define scenarios with several parameters, such as Salaries, Exchange Rate, etc.
The Budget Planning Scenario Parameters is used by the scenario calculation process only. The "Application Oder" defines the order of calculation, during the scenario calculation. The parameters with Application Order set to 1 will be calculated first, then the parameters with Application Order set to 2, etc. The parameter per Fiscal Year includes the operator, and value that will be used by the calculation, for each scenario fiscal year. The Scenario Parameter per Fiscal Year includes the list of coding blocks associated to the result of the scenario calculation.
Navigation
Budget Planning ► Support Entities ► Scenarios ► Budget Planning Scenarios Parameter
Budget Planning Scenario Parameter screen Fields
Field | Description |
Code | This is a unique identifier that is automatically assigned by the system. |
Active | This is 'True' by default. If switched to 'False' then this parameter cannot be used in future transactions. |
Language | The language used to describe the Budget Planning Scenario Parameter. |
Name | The name of the Budget Planning Scenario Parameter. |
Description | This consists of the full description of Budget Planning Scenario Parameter. |
Budget Planning Scenario | Users must select the scenario to which the parameter is related with. |
Institution | Institution to which the parameter applies. |
CoA Group | COA Group of the Target Coding Block or Coding Block Expression. |
Target Coding Block Expression | Target Coding Block Expression for which Scenario Calculation will be performed. Either Target Coding Block Expression or Budget Planning Scenario Parameter Coding Block can be specified, not both. |
Application Order | This attribute indicates the order of application for this parameter during the scenario calculation. |
Created By | Automatically assigned by the system with the user logged in. |
Created Date | Automatically assigned by the system in which the user is logged in. |
Updated by | Automatically assigned by the system with the user logged in. |
Updated Date | Date when parameter is updated. |
Budget Planning Scenario Parameter Per Fiscal Year Tab | The system automatically will populate one row per fiscal year of the selected scenario so then users will only enter the operator and value used for the calculation. |
Comments Per Fiscal Year Parameter Tab | This contains the list of comments required during scenario calculation, if Comments required during execution is set to True. |
Budget Planning Scenario Parameter Coding Block Tab | This contains the list of Source and Target coding blocks used for the scenario calculation. Either Target Coding Block Expression or Budget Planning Scenario Parameter Coding Block can be specified, not both. |
Overview
The system automatically will populate one row per fiscal year of the selected scenario so then users will only enter the operator and value used for the calculation.
Budget Planning Scenario Parameter Per Fiscal Year Tab screen Fields
Field | Description |
Operator | Operator to be used during the calculation. Possible values: + (addition), - (subtraction), * (multiplication), / (division). |
Value | Value associated to the Operator. |
Fiscal Year | Fiscal Year to which this parameter information will be used for. |
Comment Required on Execution | Default value is false, if it is true then comment required on execution. |
Language | Users can select the language to describe the entity. |
Comment | Comment field to add information such as adjustment type, law, etc. |
Overview
This includes the list of comments required during scenario calculation, when scenario parameters are applied.
Comments Per Fiscal Year Parameter screen Fields
Field | Description |
Serial Number | Application Number automatically assigned by the system. |
Fiscal Year | Users should select a Fiscal Year to which this parameter information will be used for. |
Overview
This contains the list of Source and Target coding blocks used for the scenario calculation. Either Target Coding Block Expression or Budget Planning Scenario Parameter Coding Block can be specified, not both.
Budget Planning Scenario Parameter Coding Block Tab screen Fields
Field | Description |
Serial Number | A unique number auto generated by the system. |
CoA Group | This contains COA group of the Source and Target Coding Block. |
Source Coding Block | Coding Block to be considered as source in the scenario calculation. |
Target Coding Block | Coding Block where the scenario calculation result will be saved. |
Target Parent of Partial Coding Block | Full parent coding block of pertial target coding block. |
Overview
Once a Budget Version is approved, it cannot be modified but can be copied to another active budget version with status as 'In preparation', using the “Planning to Planning” screen. Calculation is performed during the Budget Version Copy Process based on the parameters entered under the “Planning to Planning Screen”. If the Budget Version Status is “In Preparation” or “In Budget Planning”, a scenario calculation can be performed, by using the “Calculate Scenario” screen.
Navigation
Budget Planning ► Support Entities ► Scenarios ► Calculate Scenario
Calculate Scenario screen Fields
Field | Description |
Budget Version | Users should select the Budget Version from the List of Budget Version allowed by the user security and with Status as “In Preparation” or “In Budget Planning”. |
Scenario Coa Group | Users should select one Scenario COA group from the list of Scenario Groups of the Scenario of the selected Budget Version, for which calculation is done. |
Create A New Budget Plan | If this is checked then a new Budget Plan will be created to save the calculated budget lines at the bottom level of the Budget Plan Structure, and the Institution Field will need to be populated by the User, from the list of Institution(s) the User has accessed to. |
Show Results Before Apply | By default this is true. |
Budget Plan Types | Users can select one or many Budget Plan Type(s). The Budget Plan Type is set to the selected Budget Plan Type from the calculation screen. |
Scenario Parameters | Users should select one or more Scenario Parameters from a list of Scenario Parameters that user has access to and CoA Group of the Target Coding Block should be the same as the CoA Group selected. |
Budget Plans | Users should select one or more Budget Plans, if Create A New Budget Plan is set to False. The Budget Plan should be selected from the list of Budget Plans belonging to the selected Budget Version. |
Overview
Budget Plan Type allows users to classify or group budget plans for data entering, searching and reporting purposes. Examples of Budget Plan Types can be Revenues, Expenditures, Debts, Consolidated (in case a Government doesn't separate the budget plan in distinct types), etc. This function works as a catalogue which can be applicable to many scenarios and budget versions.
Navigation
Budget Planning ► Support Entities ► Budget Plan ► Budget Plan Type
Budget Plan Type screen Fields
Field | Description |
Code | Automatically assigned by the system, if the System Parameter Generate Budget Plan Type ID is set to True, or manually entered by the User if the System Parameter Generate Budget Plan Type ID is set to False. This is a unique identifier. |
Active | If this is switched off, then this entity cannot be used in future transactions. |
Budget Plan Type Group | Used as a discriminator for Workflow of Budget Plan entity, identifies the Budget Plan Types that share same workflow configuration. |
Goal Use | If check enables user of Goal related entities. |
Is Required Validation Order | This entity should be checked true if validation order is required |
COA Group | Users can select CoA group which is going to be used for this entity. |
Concept | If Organization hierarchy has the concepts: Area is side concept of Institution, Institution is Core parent Concept of Unit, and Unit is Core Parent Concept of Division. And Current CoA Group Selected by the User has in organization segment the concept Unit. Then system should allow to select Unit, Institution or Area. It depends on “Is Required Validation Order”. If “Is Required Validation Order” is True then it will be mandatory field else not. |
Coding Block Type Definition | Coding Block Type Definition (Coding Block Expression) for Budget Plans associated to this Budget Plan Type. The Budget Line Coding Blocks entered under the Budget Plan associated to this Budget Plan Type will be validated against this Coding Block Information. |
Language | Country specific language used by users. |
Name | Brief description of the entity. |
Description | Full description of the entity. |
Budget Plan Type Required Tab | Related required Buduget Plan Type. |
Budget Plan Type Fiscal Years Tab | Related Budget Plan Type fiscal years to be defined here. |
Overview
This contains a collection of 0 to many Numeric fields to be added under Budget Plans.
Budget Plan Additional Required Field Tab screen Fields
Field | Description |
Is Mandatory | Ticked checkbox means that the text or numeric field is mandatory, otherwise numeric field is not mandatory. |
Language | Country specific language used by users to enter field name |
FieldName | Brief description of the entity. |
Is Numeric | To indicate when new Field is Numeric. |
Number of Decimals | Number of decimals that are allowed for data entry, if Is Numeric is set to True. |
Is Element Detail | To indicate that the Additional Field is related to the Budget Line Coding Block. |
Segment | Segment for which the element description will be required if Is CoA Segment Description is set to True, that the user will select from the list of segments from the Scenario COA Group. |
Concept | Collection of 1 to N Concept(s) from Segment defined under COA elements. The concepts listed will be the concept at the level of the COA group and parent levels, within the selected segment. |
Overview
Indicates the Budget Version to use.
Budget Plan Type Fiscal Year Tab screen fields
Fields | Description |
Fiscal Year | Identifies Fiscal Year used. |
Budget Version | Identifies Budget Version used from Fiscal Year. |
Overview
Records of Budget Plan Type Group are entered, updated and viewed through this screen.
Navigation
Budget Planning ► Support Entities ► Budget Plans ► Budget Plan Type Group
Budget Plan Type Group screen Fields
Field | Description |
Code | Unique identification code of Budget Plan Type Group record. |
Active | This field indicates whether the record is active or not. Marking the check box indicates that the record is active and avilable for use. If unchecked, it indicates the record is avilable for reference purpose only. |
Language | Country specific language used to record the Budget Plan Type Group. |
Name | Name of the Budget plan Type Group record. |
Description | Description of the Budget plan Type Group record. |
Overview
Budget Plan Structure allows the scenario administrators to define the hierarchical structure of a budget plan. The whole budget plan structure will include one or more interrelated records in this entity.
Each scenario can only have one whole budget plan structure. The information defined here will be referenced from budget plan which contains a group of budget lines including its responsible user, status, deadline and more.
Navigation
Budget Planning ► Support Entities ► Budget Plan ► Budget Plan Structure
Budget Plan Structure screen Fields
Field | Description |
Code | This is a unique identifier that is automatically assigned by the system. |
Active | By default this is 'True'. If this is switched to 'False', then this Budget Plan Structure cannot be used in future transactions. |
Allows Foreign Currency | By default this is 'False'. If this is 'True', budget plans associated to this structure allows data entry for budget amounts in foreign currency. |
Allow Changes In Lowest Level | If this is not ticked, the responsible users for the highest levels (typically supervisors), will not be able to modify Budget Plan data in the lowest level. |
Allow Modify Consolidated Amounts | If checkbox is ticked, the system will allow the responsible user of the budget plan to modify consolidated amounts and therefore propagate the change to lower levels. |
Validation For Budget Line Data Entry | Default is true which means that data entry of Budget Line Amounts and Currency, under the Budget Line Tab cannot be performed manually, if the associated Budget Line Coding Block is used by Cost Driver(s) or is included as part of a Cost Driver expression. |
Budget Planning Scenario | This contains the Scenario to which this budget plan structure applies to. |
Institution | This refers to the institution associated to this budget plan structure. |
Budget Planning Scenario CoA Group | This is the reference to the CoA Group to which this level is associated. |
Coding Block Type Definition | Coding Block Type Definition (Coding Block Expression) for Budget Plans associated to this Budget Plan Type. The Budget Line Coding Blocks entered under the Budget Plan associated to this Budget Plan Structure will be validated against this Coding Block Information. |
Language | The language used to describe the Budget Plan Structure. |
Name | The name of the Budget Plan Structure. |
Description | The description of the Budget Plan Structure. |
Budget Plan Additional Required Field Tab | Collection of 0 to many fields to be added under Budget Plans. |
Overview
This contains a collection of 0 to many Numeric fields to be added under Budget Plans.
Budget Plan Additional Required Field Tab screen Fields
Field | Description |
Is CoA Segment Description? | If this checkbox is ticked the system should ask for the description of additional fields for all elements that are included in the concepts of the defined segments and rolling-up from the budget line coding block, in the same segment. |
Is Mandatory | Ticked checkbox means that the text or numeric field is mandatory, otherwise numeric field is not mandatory. |
Is Numeric | To indicate when new Field is Numeric. |
Number of Decimals | Number of decimals that are allowed for data entry, if Is Numeric is set to True. |
Is Element Detail | To indicate that the Additional Field is related to the Budget Line Coding Block. |
Segment | Segment for which the element description will be required if Is CoA Segment Description is set to True, that the user will select from the list of segments from the Scenario COA Group of the Budget Plan Structure. |
Language | Users can select the language to describe entity. |
FieldName | Name of the entity. |
Concept | Collection of 1 to N Concept(s) from Segment defined under COA elements. The concepts listed will be the concept at the level of the COA group and parent levels, within the selected segment. |
Overview
Cost Driver Type allows users to classify or group cost drivers and packages, so then it can be used when searching for a particular one. This function works as a catalogue which can be applicable to many scenarios and budget versions.
Navigation
Budget Planning ► Support Entities ► Budget Plan ► Cost Driver Type
Cost Driver Type screen Fields
Field | Description |
Code | This is a unique identifier that is automatically assigned by the system, if the System Parameter Generate Cost Driver Type ID is set to True, or manually entered by the User if the System Parameter Generate Cost Driver Type ID is set to False. |
Active | Default is true. If this is False, then this Cost Driver Type cannot be used in future transactions. |
Catalogue Item Required | Indicates if Catalogue Item reference is mandatory or not. |
Grantee Required | Indicates if Receiver Grants reference is required. |
Entry Cost At Budget Plan | If flag is set the cost per Fiscal Year will be always 1, system then allows the entry of Cost (2 decimals) during the Cost Driver registration in the Budget Plan. |
Unit Of Measure Required | Indicates if unit of measure is required. |
Language | Country specific language used to describe the Cost Driver Type. |
Name | This contains the name of the Cost Driver Type. |
Description | This contains the description of the Cost Driver Type. |
Overview
This contains a collection of 0 to many Numeric fields to be added under Budget Plans.
Budget Plan Additional Required Field Tab screen fields
Fields | Description |
Is Mandatory | Ticked checkbox means that the text or numeric field is mandatory, otherwise numeric field is not mandatory. |
Language | Country specific language used by users. |
Field Name | Brief description of the entity |
Is Numeric | To indicate when new Field is Numeric. |
Is Cost Driver Detail | Default FALSE. Indicate that Additional Field is related to a Cost Driver of the Budget Line. |
Is Use Field On Calculation | When it is TRUE, the additional fields are going to be used to determine the amount calculation |
Overview
Cost Driver allows users to assign standardized prices or amounts to planning budget coding blocks.
It can have more than one record associated to the same coding block, for instance, for budget visa fee (specific coding block), there can be more than one cost driver, each one associated to different visa type with its related amount. This works as a catalogue which can be applicable to many scenarios and budget versions.
Navigation
Budget Planning ► Support Entities ► Budget Plan ► Cost Driver
Cost Driver screen Fields
Field | Description |
Code | This is a unique identifier that is automatically assigned by the system, if the System Parameter Generate Cost Driver ID is set to True, or manually entered by the User if the System Parameter Generate Cost Driver ID is set to False. |
Active | The default value is true. If this value is False then this Cost Driver cannot be used in future transactions. |
Is Mandatory | The default value is true meaning the only way to enter the associated coding block in a budget line is through the Cost Driver Tab of the Budget Plan. If this value is False then users will be able to enter the associated coding block directly as budget line or using the Cost Driver Tab of the Budget Plan. |
Type | The corresponding Cost Driver Type needs to be selected as it will be used for search purposes when using it in budget planning entity. |
CoA | Users must select the CoA which is going to be used for this Cost Driver. |
CoA Group | This is the CoA Group that will be used for the Type Definition. |
Type Definition | This contains a type definition which can be a valid coding block or a coding block expression. |
Institution | Cost Driver Institution, according to the Institution users have access to that is Budget Office. |
Catalogue Item | Catalogue item reference for this cost driver. |
Grantee | Reference to Receiver Grants, system validates that no other Cost Driver has the same value. |
Unit Of Measure | Reference to Unit of Measure used in Cost Driver. |
Cost Driver Hierarchy | User can select the corresponding Hierarchy, it will be used for report purposes. |
Currency | This contains the currency for the Cost Driver amount, which can be either in domestic or foreign currency. |
Exchange Rate | Exchange rate related to currency, applicable when using multi currency. |
Language | The language used to describe the Cost Driver. |
Name | This contains the name of the Cost Driver. |
Description | This contains the description of the Cost Driver. |
Cost Driver Per Fiscal Year Tab | This contains the Cost Driver amount per Fiscal Year, in Domestic or Foreign Currency, according to the Currency specified. |
Overview
This contains the Cost Driver amount per Fiscal Year, in Domestic or Foreign Currency, according to the Currency specified.
Cost Driver Per Fiscal Year Tab screen Fields
Field | Description |
Fiscal Year | This is the Fiscal Year to which this cost driver amount applies. |
Amount (Domestic) | This contains the amount in domestic currency. |
Amount (Foreign) | This contains the amount in foreign currency. |
Overview
Cost Driver Package allows users to relate more than one Cost Driver, including quantities. For example, IT equipment for clerks will have: 1 computer, 1 monitor, 1 printer, etc.
This entity works as a catalogue which can be applicable to many scenarios and budget versions.
Navigation
Budgeting System ► Cost Driver ► Cost Driver Package
Cost Driver Package screen Fields
Field | Description |
Code | This is a unique identifier that is automatically assigned by the system, if the System Parameter Generate Cost Driver Package ID is set to True, or manually entered by the User if the System Parameter Generate Cost Driver Package ID is set to False. |
Active | The default value is true. If this value is False, then this Cost Driver Package cannot be used in future transactions. |
All Cost Drivers Mandatory | This attributes indicates if users need to enter values for all cost drivers which compose the package. If this is TRUE, all cost drivers are mandatory during budget planning data entry. |
Institution | This attribute indicates the institution of the cost driver. |
Cost Driver Type | Users must select the corresponding type which will be used for search purposes when using it in budget planning entity. |
Language | The language used to describe the Cost Driver Package. |
Name | The name of the Cost driver Package. |
Description | This contains the Description of the Cost Driver Package. |
Cost Driver Tab | This contains the list of one to many cost drivers which belong to this package. |
This contains the list of one to many cost drivers which belong to this package.
For details regarding Cost Driver, refer to the link below:
Overview
Records of Catalogue Item and Inventory Items are retrieved through this screen.
Navigation
Budget Planning ► Support Entities ► Budget Plans ► Load Cost Driver From Catalogue Item
Load Cost Driver From Catalogue Item screen Fields
Field | Description |
Source | Source is selected from drop down box. Possible values are: Catalogue Items and Inventory Items. When value for this field is selected 'Catalogue Item', the following fields appear on screen. |
Catalogue Items to Load | Catalogue Items to load is selected from drop down box. Possible values are: Already in Cost Driver and Not Yet in Cost Driver. |
Product Price Header | Product Price Header is selected in this field. |
Unit Cost Policy | Unit cost policy is selected from drop down box. Possible values are: Average, Maximum and Minimum. |
Cost Driver Type | Cost Driver Type is selected from drop down box. |
CoA | CoA is selected from drop down box. |
CoA Group | CoA Group is selected from drop down box. |
Destination Fiscal Year | Destination Fiscal Year is selected from the drop down box. |
Source | Source is selected from drop down box. Possible values are: Catalogue Items and Inventory Items. When value for this field is selected 'Inventory Item', the following fields appear on screen. |
Catalogue Items to Load | Catalogue Items to load is selected from drop down box. Possible values are: Already in Cost Driver and Not Yet in Cost Driver. |
Institution | Institution is selected from lookup button. |
Unit Cost Policy | Unit Cost Policy is selected from drop down box. |
Source Fiscal Year | Source Fiscal Year is selected from drop down box. |
Cost Driver Type | Cost Driver Type is selected from drop down box. |
CoA | CoA is selected from drop down box. |
CoA Group | CoA Group is selected from drop down box. |
Destination Fiscal Year | Destination Fiscal Year is selected from the drop down box. |
Overview
This entity will allow users to set a Hierarchy to Cost drivers, so then it can be used for hierarchical reports.
Navigation
Budget Planning ► Support Entities ► Budget Plan ► Cost Driver Hierarchy
Cost Driver Hierarchy Screen Fields
Field | Description |
Id | This represents the unique ID of Cost Driver Hierarchy entity, which is generated automatically by the system or entered by the user. |
Active | Indicates whether this record is active or inactive. |
Language | Language used to describe Cost Driver Hierarchy to be selected from dropdown box. |
Name | Name of the Cost Driver Hierarchy |
Description | A brief description of the Cost Driver Hierarchy |
Cost Driver Hierarchy Parent ID | Only can be set a Cost Driver Hierarchy without any Cost Driver |
Level | Integer to identify the level. Assigned automatically by the system, starting from 1. |
Overview
This entity contain the Concepts for which the Budget Line Amount can be distributed.
Navigation
Budget Planning ► Support Entities ► Distribution Concept
Budget Planning Scenario Screen Fields and Tabs
Field | Description |
Concept Id | This is a unique identifier that is automatically assigned by the system, if the system parameter Generate Scenario ID is set to True, or manually entered by the user if the system parameter Generate Scenario ID is set to false. |
Release Type | Indicates the budget release type. Possible values are FCR (For Comprehensive Release) and FLR(For Later Release). |
Sequence | Order to display and to send to execution. |
Name | Name of the Concept. |
Description | Full description of the Concept. |
Overview
The Scenario Copy Interface allows for movements of Budget Versions and related Budget Plans across different Scenario’s. This interface can be used at the start of each Fiscal Period to begin the budgeting process for a new budget cycle as it enables the Budget Manager to copy previous year’s information such as business parameters, Budget Ceilings, Budget Structures and Budget Versions to the new Scenario.
Navigation
Budget Planning ► Interfaces ► Scenario Copy Screen
Scenario Copy Screen Fields
Field | Description |
Source Scenario | Scenario ID, selected by users, from the list of Scenarios allowed by the user security. |
Source Scenario Name | Brief description of the source scenario selected by the user. |
Destination Scenario Type | Type of Scenario Copy. Default is “Copy to New Scenario”. Possible values are “Copy to new Scenario”, and “Copy to existing Scenarios”. |
Destination Scenario ID | Destination Scenario ID manually entered by the user if the System Parameter Generate Scenario ID is set to false and Destination Scenario Type is set to “Copy to new scenario”. |
Destination Scenario Name | Brief description of the destination scenario, entered by users. This field is only required if Destination Scenario Type is set to “Copy to new scenario”. |
Destination Scenario | Scenario selected by the user, if Destination Scenario Type is set to “Copy to existing scenario”. |
Copy Parameters | If checked, the Copy Scenario Process will copy all active records of the Scenario Parameter that correspond to the Source Scenario. |
Copy Ceilings | Possible values are: “No”, “From Budget Ceilings”, “From Budget Lines”. If set to “No”, the Budget Ceilings are not copied from the Source Scenario. If set to “From Budget Ceilings”, the Copy Scenario Process will copy all active records of Budget Ceilings from the Source Scenario. If set to “From Budget Lines”, the Copy Scenario Process will create Budget Ceilings from the Budget Lines of the selected Source Budget Plans. |
Ceilings Source COA Group | COA Group with “Apply for Ceilings” set to True, from the Source Scenario. This field is only visible if Copy Ceiling is set to “From Budget Lines”. |
Ceilings Source Budget Version | Budget Version selected from the Source Scenario, if Copy Ceiling is set to “From Budget Lines”. |
Ceilings Destination COA Group | For each Source COA Group, a Destination COA Group should be specified, from the list of COA Groups of the Destination Scenario, if Destination Scenario Type is set to “Copy to existing Scenario”, or from the list of COA Groups of the Source Scenario, if Destination Scenario Type is set to “Copy to new Scenario”. |
Copy Budget Plan Structure | If checked, the Copy Scenario Process will copy all records of Budget Plan Structure, associated to the selected Source Scenario. This field is only visible if Destination Scenario Type is set to “Copy to a new Scenario”. |
Copy Budget Versions | If checked, the Copy Scenario Process will copy the selected Budget Versions, and Budget Plans that belong to the selected Budget Version(s). |
Copy Budget Plan | If checked, the Copy Scenario Process will copy the selected Budget Plans from the Source Fiscal Year to the Destination Fiscal Year. This field is only visible if Destination Scenario Type is set to “Copy to Existing Scenario”. |
Allow Copy Between Different Budget Plan Structures | If checked, the user will need to specify the Source COA Group and the Destination COA Group for the Budget Plan Structure. This field is only visible if Destination Scenario Type is set to “Copy to existing Scenario”, and Copy Budget Plan Structure is set to False. |
Source Budget Versions Tab | Users could select one or more Budget Version, associated with the Source Scenario. This information is required if Copy Budget Versions is set to True, or Copy Budget Plans is set to “True”. |
Copy All Fiscal Years | If checked, the Copy Scenario Process will copy all Fiscal Years of the Source Budget Version, for a specified Destination Budget Version. This field is only visible if Copy Budget Versions is set to TRUE, or Copy Budget Plans is set to True. |
Copy all Source Fiscal Years for all Budget Versions | If checked, the Copy Scenario Process will copy all Fiscal Years, from all Source Budget Versions. This field is only visible if Copy Budget Versions is set to TRUE, or Copy Budget Plans is set to True. |
Ceilings Source Budget Plans Tab | From the Budget Version listed under Ceilings Source Budget Version", the system allows the selection of one(1) or more Budget Plans associated with the "Ceilings Source COA Group" selected. |
Source and Destination Coa Groups Tab | This allows users to select a Source COA group from a list showing all COA groups attached to the Source Scenario and a Destination COA Group from a list showing all COA groups attached to the Destination Scenario. This information is required if Allow Copy Between Different Budget Plan Structures is set to True. |
Source and Destination Fiscal Year Tab | This allows the user to select one Destination Fiscal Year for each Source Fiscal Year. This tab is only visible if Copy All Fiscal Years is set to False. |
Overview
Users could select one or more Budget Version, associated with the Source Scenario. This information is required if Copy Budget Versions is set to True, or Copy Budget Plans is set to “True”.
Source Budget Versions Tab screen Fields
Field | Description |
Source Budget Version | Unique identification code representing the source budget version. |
Source Budget Version Name | Unique identification code representing the source budget version name. |
Language | Country specific language to be used. |
Destination Budget Version | For each Source Budget Version, Users should select a Destination Budget Version of the Destination Scenario. |
Destination Budget Version name | Destination Budget Version Name of the selected Destination Budget Version. |
Source Budget Plans Tab | For each Source Budget Version, users should select Budget Plans. The user can select only Budget Plans that that user has access to, within the selected Budget Version. |
Overview
This allows the user to select one Destination Fiscal Year for each Source Fiscal Year. This tab is only visible if Copy All Fiscal Years is set to False.
Source and Destination Fiscal Year Tab screen Fields
Field | Description |
Source Fiscal Year | Users can select one (1) or more Fiscal Years for each selected Budget Version, from the list of Fiscal Years of the Source Budget Version |
Destination Fiscal Year | For each Source Fiscal Year, Users should select the corresponding Destination Fiscal Year, from the list of Fiscal Years of the selected Destination Budget Version. |
Overview
The Planning to Planning Interface is used to copy Budget information from one version to another. This interface is used throughout the lifecycle of the budget preparation process to copy information from one version to another to maintain full traceability of the evolution of the budget. For Instance, when a Budget Version has been completed (or Frozen), the Budget Manager or Officer could copy its content to a new Version using the Planning to Planning Interface to prepare for the next phase of the budget cycle.
Naviagation
Budget Planning ► Interfaces ► Planning to Planning
Planning To Planning screen Fields
Field | Description |
Budget Version | The Budget Version from which users wants to copy the budget records. |
Destination Budget Version ID | Identifier code for each Destination Budget Version. |
Destination Budget Version Name | Destination Budget Version Name to be entered by users within same Scenario as the Source Budget Version. The name is to be entered manually if the Budget Version is new, only. |
Destination Budget Version | The Budget Version of the Destination Budget Version, if existing, should be selected from the list of Budget Version within the same scenario as the Source Budget Version. |
Copy Budget Version only | If this box is checked it creates a new Budget Version record under the Budget Version Entity, without copying the Budget Plan(s). |
Copy/Modify Budget Plan(s) | Possible values are 'None', 'All', 'Specific Budget Plan(s)' for the Source Budget Version and the Source Fiscal Year, as defined by the Configuration Matrix. |
Copy to same COA groups as source COA groups | Indicates if same CoA Group will be copied as source CoA Groups. |
Copy Comments | If this box is checked, the comments in Budget Line related to each budget line, will be copied to the destination lines. |
Overview
The Import Budget Execution to Planning enables Budget Managers to copy Budget Execution details to a Budget Version. This can avoid significant data entry by automatically creating Budget Plans based on Budget Execution data. Execution data can be used to either create new records or modify existing ones by either using Actual Expenditures (AE), AE with Commitments or AE with Obligations, Current Amount or Original.
Navigation
Budget Planning ► Interfaces ► Import Budget Execution to Planning
Import Budget Execution To Planning screen Fields
Field | Description |
Budget Control Type | A drop down menu displaying the list of Budget Control Type from Budget Distribution Control. |
Fiscal Year | A drop down menu displaying the list of Fiscal Years. |
Type Definition | Users could modify the default selection (all coding blocks) to select one or more Coding Block Expression. |
Budget Plan Modification or Creation Option | Possible values are “Modification of an Existing Budget Plan(s)”, “Creation of a new Budget Plan within an existing Budget Version”, and “Creation of a new Budget Version”. Default is “Modification of Existing Budget Plan(s)”. |
Budget Execution Data to Import | Possible Values are “YTD Actuals”, “YTD Actuals + Obligations” or “YTD Actuals + Commitments”, or "Current Amount", or "Original Amount". |
Override Budget Lines Amount | Default is checked meaning that the Budget Line Amount of the Budget Lines with the same coding block as the source Budget Control will be overwritten. This parameter should only be visible if Budget Plan Modification or Creation Option is set to “Modification of an Existing Budget Plan”. |
Budget Planning Scenario | The Scenario to which the Budget Execution information is imported. |
Destination Scenario COA Group | Users should select one Destination COA Group, from the list of Scenario COA groups. |
Budget Version ID | The Budget Version ID to which the Budget Execution information will be copied, selected from a dropdown menu displaying the Budget Version(s) with Status “In Budget Planning” of the Destination Scenario, if Budget Plan Modification or Creation Option is set to “Modification of existing Budget Plan” or “Creation of a new Budget Plan within an Existing Budget Version”. The Budget Version ID is entered manually if Budget Plan Modification or Creation Option is set to “Creation of a new Budget Version”, if system parameter “Generate Budget Version ID is set to “False”. |
Budget Version Name | The Budget Version Name associated to the selected Destination Budget Version ID or entered manually, if Budget Plan Modification or Creation Option is set to “Creation of a new Budget Version”. |
Institution Tab | Users should select one or more Institutions from the list of Institutions from the Budget Plan Structure(s) of the Destination Scenario. |
Budget Plan Tab | The Budget Plan to which the Budget Execution information will be copied, selected from a dropdown menu displaying the Budget Plan(s) with Status “Open”, and with the same COA group as the Destination Scenario COA Group, of the Destination Budget Version. This Tab is only required if Budget Plan Modification or Creation Option is set to “Modify an Existing Budget Plan”. |
Overview
The Budget Plan to which the Budget Execution information will be copied, selected from a dropdown menu displaying the Budget Plan(s) with Status.
Budget Plan Tab screen Fields
Field | Description |
Code | Unique identification code representing the Budget Plan. |
Status | Possible values are Open (by default), Completed, Under Analysis, Closed, Partially Sent for Execution, Fully Sent for Execution. |
Overview
Users should select one or more Institutions from the list of Institutions from the Budget Plan Structure of the Destination Scenario. This Tab is only required if Budget Plan Modification or Creation Option is set to “Creation of a New Budget Version” or “Creation of a new Budget Plan within an Existing Budget Version”.
Institution Tab screen Fields
Field | Description |
Code | Unique identification code representing the Institution. |
Description | Description of the Institution. |
Overview
Import/Copy Process Log includes the Import and Copy Processes along with their execution status and list of rejected and successful transactions. It enables Budget Managers or Budget Officers to analyze import logs to identify the outcome of the transactions (Success, Rejected or Aborted).
Navigation
Budget Planning ► Interfaces ► Import/Copy Process Log
Import/Copy Process Log screen Fields
Field | Description |
Serial Number | Unique identification code automatically assigned by the system. |
Import/Copy Process | Possible values are: Budget Execution to Planning, Planning to Planning and Scenario Calculation. |
Execution Status | The type of result. Possible Values are: "Successful Execution", "Execution with Rejected Transactions", "Aborted Execution". |
Execution Date and Time | This represents the execution date and time. |
User | Application User who performed the import/copy process. |
Transaction Details Tab | Collection of 1 to N transactions, from the last Execution with rejected transactions or successful execution. |
Comments Per Fiscal Year Parameter Tab | This includes the list of comments required during scenario calculation, when scenario parameters are applied. |
Overview
This includes the list of comments required during scenario calculation, when scenario parameters are applied.
Comments Per Fiscal Year Parameter Tab screen Fields
Field | Description |
Serial Number | Application Number automatically assigned by the system. |
Fiscal Year | User should select a Fiscal Year to which this parameter information will be used for. |
Budget Planning Scenario Parameter | Displays the Scenario Parameter ID. |
Budget Planning Scenario | Displays the Scenario ID. |
Overview
Collection of 1 to N transactions, from the last Execution with rejected transactions or successful execution.
Transaction Details Tab screen Fields
Field | Description |
Serial Number | Application Number automatically assigned by the system. |
Budget Version | Destination Budget Version ID. |
Budget Version Name | Destination Budget Version Name. |
Budget Plan | Destination Budget Plan ID. |
Budget Plan Description | Destination Budget Plan Description. |
Budget Line | Destination Budget Line ID. |
Budget Line Description | Destination Budget Line Description. |
Coding Block | Destination Budget Line Coding Block. |
Other Message | Message assigned by the system to indicate successful completion. |
Error Message | Error message assigned by the system. |
Overview
Budget Ceiling contains information about each budget ceiling. Ceiling information is defined by Scenario which means it applies for all the budget versions included in the scenario.
Navigation
Budget Planning ► Budget Ceiling ► Budget Ceiling (Single)
Budget Ceiling (Single) screen Fields
Field | Description |
Application ID | Automatically assigned by the system. This is a unique identifier. |
Status | Possible values are: Created, Sent for Approval, Approved, Rejected, Terminated. |
Work Process Transition | Possible values are Create, Approval Request, Approve, Verify, Cancel, and Return. |
Description | Full description of the unique ceiling record. |
Budget Planning Scenario | Users must select the scenario to which this budget ceiling applies to. There is usually only one scenario per fiscal year, unless what-if scenarios also exist. |
Budget Planning Scenario Fiscal Year | Reference to the Budget Planning Scenario fiscal year to which this ceiling applies. |
Budget Planning Scenario COA Group | Reference to the Scenario CoA Group which determines the level in the CoA of this ceiling. |
Coding Block | Coding Block for Budget Ceilings associated to relevant COA Group. |
Previous Year Data | A drop down will appear asking the user to select a scenario from the list of Scenario. |
Institution | Institution populated by the system, from the Organization segment of the Budget Ceiling Coding Block. |
Allow to Exceed | Possible values are: No, Yes, Yes with warning. |
Ceiling Amount | Users can enter ceiling amounts. No negative values are allowed. It is entered in domestic amount. |
Distributed | This attribute will get a value from the roll ups of values from lower ceilings. |
To be distributed | Value of this attribute is: Ceiling Amount, Distributed Amount. |
Amount of Tolerance | Users may enter permissible variation for ceiling amount. |
Percentage of Tolerance | Users may enter permissible variation for ceiling amount, in percentage. |
Created By | Indicates who created the budget ceilling. It is automatically populated by the system after saving. |
Overview
Budget Ceiling (Bulk) is used while creating more than one Budget Ceiling. This will contain information about each budget ceiling. Ceiling information is defined by Scenario which means it applies for all the budget versions included in the scenario.
Navigation
Budget Planning ► Budget Ceilings ► Budget Ceiling (Bulk)
Budget Ceiling (Bulk) screen Fields
Field | Description |
Budget Planning Scenario | User must select the Scenario to which this budget ceiling applies to. |
Budget Planning Scenario Fiscal Year | Reference to the Budget Planning Scenario fiscal year to which this ceiling applies. |
Budget Planning Scenario COA Group | Reference to the Scenario CoA Group which determines the level in the CoA of this ceiling. |
Parent Scenario COA Group | To indicate the parent levels for selected COA group within the selected Scenario. |
Parent Scenario Budget Ceiling | To indicate the parent level’s amount for selected budget ceiling within COA Group hierarchy. |
Institution | Institution populated by the system, from the Organization segment of the Budget Ceiling Coding Block. |
Overview
This entity represents the classification for the product.
Navigation
Budget Planning ► Budget Output/ Outcome ► Support Entities ► Product Type
Product Type Group Screen Fields
Field | Description |
Code | This represents the unique ID of a product Type entity, which is generated automatically by the system or entered by the user according to the parameter “Generate Product Type ID”. |
Active | Checkbox whose default value is true. Possible values are TRUE/FALSE. |
Name | This attribute states the name of the classification |
Description | This attribute states the classification description. |
Overview
Used to identify the list of valid Goal or Financial CoA Groups that can be set at Product Entity.
Navigation
Budget Planning ► Budget Output/ Outcome ► Support Entities ► Product Coa Groups
Product CoA Group Screen Fields
Field | Description |
Code | This represents the unique ID of a Product CoA Groups entity, which is generated automatically by the system or entered by the user. |
Active | Indicates whether this record is active or inactive. |
Goal | Indicates whether this entity represents a Goal, which is usually a meaning to measure different stages of a product development. |
CoA | Lists all the currently active COA presents in the system. |
Financial | Indicates whether this is financial type. |
CoA Group | Reference to the CoA Group from CoA. |
Overview
Used to identify the list of valid Goal or Financial CoA Groups that can be set at Product Entity.
Navigation
Budget Planning ► Budget Output/ Outcome ► Product
Product Screen Fields and Tabs
Field | Description |
Code | This represents the unique ID of a product entity, can be generated automatically by the system or enter by the user according to parameter “Generate Product ID”. |
Active | Indicates if the Product is ative. True by default, user can only switch this to False if this product is not present in any Product correlation entity, or if it’s present but marked as false in attribute active. When this attribute it’s false this Product cannot be selected as part of any Product correlation. |
Name | Name of the Product. |
Description | A brif Description of the Product. |
Status | Possible values are “Created, Request for Verification, Request for Approval, Cancelled, Approved, and Rejected”. |
Workflow Process Transition | Indicates workflow process transition. |
Institution | Indicates the institution for the product. |
Product Type | Classification given to the Product. |
Is Final | Default is FALSE. Only intermediate products (is Final equal FALSE) can be added in entity Product Correlation to other Products. When this is Final, Contribution can only be set as Direct. |
Is Direct Contribution | Should be TRUE when Is final is TRUE. |
Is Controllable | Defines if the product is referred as a product the institution has Control (Example, a Road) or doesn’t (Example, Crime Reduction). |
Product Frequency | Possible values are “Periodical, Non Periodical”. |
Maximum No Of Decimals Allowed | Number of Decimals to be validated on data entry of the Product. Can’t be greater than the number of decimals allowed in the Big Decimal Type. |
COA | Indicates chart of accounts of the Product. |
Goal CoG Group | Defines the Goal CoG Group at witch, in the CoG, product entities are represented. |
Financial CoA Group | CoA Group structure that this products adheres to, so any CoA Coding Block added to attribute Product Budget for this Product has to be of this CoA Group |
Goal Coding Block Type Definition | Coding Block Expression representing this product in CoA, this Coding Block Expression has to be of Group defined in attribute Goal CoA Group. |
Product Budget Coding Block Type Definition | This is a CoA Coding Blocks Expression representing the Budget who financially support this product. This Coding Block Expression has to be of Group defined in attribute Financial CoA Group. |
Is Calculated | Default FALSE. When is TRUE Calc. Type should be enabled and required otherwise Calc. Type should be set to “Result” |
Calc. Type | Possible values are “Result, Weighted, Rate, Financial”. Default value is “Result”. |
Coefficient | Represents the coefficient of an product, it’s used to calculate when Calc. Type is Rate. |
Unit Of Measure | This refers as the Unit of Measure that defines how the product is measured. |
Created Date | Time of creation. |
Created By | User who creates the record. |
Approved Date | Approval time. Automatically update by the system when workflow reaches its stage Approved. |
Approved By | User who Approves. Automatically update by the system when workflow reaches its stage Approved. |
Fiscal Year Control Tab | Defines for a given fiscal year, if this Product will be active for budget execution, budget planning or both. |
Concepts Tab | Concept for which Product is Related. |
Product Correlations Tab | Product correlation can be added by this tab. |
Elements Tab | Element for which Product is related. |
Overview
This entity represents the collection of fiscal years to which the Product/Indicator is relevant for the institution.
Fiscal Year Control Tab screen fields
Fields | Description |
Fiscal Year | Reference to the fiscal Year to allow in the Product. |
Active for Execution | Flag to define if this Product can be used when executing Budget as to store progress based on that execution. |
Active for Planning | Flag to define if this Product can be used in Budget Planning as to define how the planned budget will be linked to institution objectives when executing that budget. |
Progress | This attribute is read only, will be calculated by the system. This represents the progress reached in a given fiscal year. |
Overview
This entity stores the relationship between products when one product is set as Calc. Type = Rate, Weighted or Result.
Product Correlation Tab screen fields
Fields | Description |
Product | This represents the divisor of the Rate division operation when Result Product Calc. Type is Rate. Or the proportion Product when Result Product Calc. Type is Weighted. Or the Related Product when Result Product Calc. Type is Result. |
Active | True by default, when False this instance has to be ignored from all processes that make use of this entity. |
Overview
This screen consist of searching feature related to the Goal of the Budget Output / Outcome.
Navigation
Budget Planning ► Budget Output / Outcome ► Goal
Goal screen Fields and Tabs
Field | Description |
Product | Select the Product using search button. |
Fiscal Year | Select Fiscal Year using drop down menu. |
Coding Block | Select the Coding Block. |
Institution | It fetches the reference Id od the Institution. |
Status | Present status of the Goal. Eg. Approved, Rejected, etc. |
Select the coding block for this atribute. |
Overview
This screen consist of searching feature related to the Goal of the Budget Output / Outcome.
Navigation
Budget Planning ► Budget Output / Outcome ► Strategic Plan
Strategic Plan screen Fields and Tabs
Field | Description |
Code | ID for the plan, automatically generated by system. |
Active | True when the strategic plan is active, false otherwise. Default value is True. |
Workflow Status | Indicates current wrokflow status of the plan. |
Workflow Process Transition | Indicate workflow process transition. |
Strategic Plan Status | “Calculated/Updated Read Only Field” updated by the system. Depending on the Workflow Configuration Setting for this Entity the basic Stages are: ‘Created’, ‘Approval Requested’, ‘Approved’, ‘Rejected’, |
Description | Detailed description of the Strategic Plan. |
Institution | Referse to the related Institution. |
Period Begin | Begin Plan date. |
Period End | End date for the Plan. |
Mission | Mission Information. |
Vision | Vision information. |
Tendencies | Tendencies information. |
Problems | Problems information. |
Challenge | Challenges information. |
Policy | Policies information. |
Product Progresses | Indicators belonging to the plan. |
Product Action | Collection of 0 to N. Strategic Actions. |
Overview
This entity hold the Product that belong to a plan and store its progress.
Product Progress screen Fields and Tabs
Field | Description |
Product | Product belonging to the plan. |
Calculated Progress | Calculated Progress for the indicator relative to this plan. |
Progress | Progress for the Product relative to this plan. |
Overview
This entity will hold the descriptions of the actions that contribute to acomplish the Strategic Plan.
Strategic Plan Action screen Fields and Tabs
Field | Description |
Correlative Id | Sequence Number, starting from 1. |
Concept | Indicated the related Concept. |
Element | Related Element from the selected Concept. |
Description | Brif description of the strategic plan action. |
Policy | Policy information. |
Elements Tab | Collection of related elements. |
Overview
This screen consist of searching feature related to the Product Progress Calculation of the Budget Output / Outcome.
Navigation
Budget Planning ► Budget Output / Outcome ► Product Progress Calculation
Product Progress Calculation screen Fields and Tabs
Field | Description |
Fiscal Year | Select Fiscal Year using drop down menu. |
Calc. Type | Select the Calc. Type using drop down menu. |
Institution | It fetches the reference Id od the Institution. |
Select the Product using search button. |
Overview
Budget Version manages the status and general information of each budget version. Each budget version within same scenario will share Budget Scenario parameters, Budget Plan Structure and Budget Ceiling Information. However each budget version can have its own Budget Line Groups and some specific configuration.
Navigation
Budget Planning ► Budget Versions
Budget Version screen Fields
Field | Description |
Code | This is a unique identifier that is automatically assigned by the system, if Generate Budget Version Id is set to True, or manually entered by the User if Generate Budget Version Id is set to False. |
Workflow Status | The default value is 'In Preparation'. This is workflow related and can have these possible values: ‘In Budget Planning’, “Frozen”, ‘Sent for Approval', 'Approved', 'Partially Sent for Execution', 'Fully Sent for Execution' and 'Cancelled'. |
Active | It is ‘True’ by default. If it is switched to ‘FALSE’, then this budget version cannot be used in future transactions. |
Apply Ceilings | It is False by default. If it is true then the system will apply the entered ceilings during the budget planning data entry (budget lines) as MAXIMUM values, which means entered budget values cannot be greater than ceiling value. |
Apply Ceilings As Minimum | It is False by default. If it is true then the system will apply the entered ceilings during the budget planning data entry (budget lines) as MINIMUM values, which means entered values cannot be lower than ceiling value. |
Apply Budget Version Deadline | If checkbox is ticked, the system will apply date in Deadline to validate of Budget Version submission. Once the deadline is passed, the version will automatically be moved to status ‘Frozen’. |
Is Internal | Default is False which means that the Budget Version is External. |
Budget Planning Scenario | This is a reference to the Scenario to which this Budget Version belongs. |
Proposal Request By | Possible values are Agencies, MoF, Pairlament and Other. |
Calculation Date | This value will be automatically updated each time this Budget Version is calculated from a Scenario. |
Created Date | Creation date and time for this budget version which is automatically assigned by the system. |
Deadline | Deadline for the Budget Version. |
Last Date of Fiscal Period Automatic Distribution | This is automatically generated by the system and is only applicable when fiscal period distribution is associated to an automatic method. |
Fiscal Period Distribution Needed | If this is true then system will allowentry of fiscal period distribution in Budget Plan of this Budget Version, if the “Manual” Fiscal Period Distribution Method is selected under Budget Scenario. |
Allow Changes to Automatic Fiscal Period Distribution | Default is false. If this is true then system will allow user to change the Fiscal Period Distribution after this has been automatically generated. |
Amount Scale | Identifies scale of amounts. |
Allow Change to Default Scale | Indicates if scale can be changed. |
Is Cost Driver Mandatory Required | Identifies if Cost Drivers are mandatory during Budget Lines data entry. |
Language | The language used to describe the Budget Version. |
Name | The name of the Budget Version. |
Description | The description of the Budget Version. |
Budget Version Fiscal Year Tab | This will contain the collection (one to many) of fiscal years allowed to each Budget Version. These fiscal years can be used for scenario forecasting and also for manual data entry in the budget planning process. |
Attachments Tab | It contains files attached by the user to support or detail features of the Budget Version. |
Overview
It contains files attached by the user to support or detail features of the Budget Version.
Attachments Tab screen Fields
Field | Description |
Id | A unique number auto generated by the system. |
Attachment Classification | This could be useful to classify the attachment being added by the user based on a pre-defined listed configured by the users. |
Language | It represents the language of the document. |
Title | Title of the document attached. |
Description | This is defined by users and contains the description of the Attachment. |
Attachment | The document to be attached is to be selected from the 'Browse' option. |
Date Time | This shows the date and time of the last operation that has been performed on the attachment document. |
Date | The user will use this attribute to classify the attribute in terms of date. |
User | This is the last user who have uploaded or updated the document. |
Overview
This will contain the collection (one to many) of fiscal years allowed to each Budget Version. These fiscal years can be used for scenario forecasting and also for manual data entry in the budget planning process.
Budget Version Fiscal Year Tab screen Fields
Field | Description |
Fiscal Year | List of Fiscal Years applicable to be selected as part of the Budget Version definition. At least one must be selected. This list is based on the Budget Planning Scenario definition. |
Apply for Budget Planning | Defines if the selected Fiscal Year is to be used for Planning Purposes. At least one Fiscal Year must have this attribute. If this is not selected, the Budget amounts are used for forecasting purposes only. |
Budget Plans Read Only | This will make amounts in the Fiscal Year where this attribute is selected Read-Only on the Budget Plan form and will not allow users to make changes to it. |
Apply Ceilings | If checked, the system will apply the entered ceilings during the budget planning data entry (budget lines) as MAXIMUM values, which means entered budget values cannot be greater than ceiling value. |
Overview
The Budget Plan form allows the user to prepare the budget data, or budget plan records, for a given fiscal year and budget version. Each budget plan record can be distributed by COA Coding Block. Authorized users may also approve entered budget plan records within this form, providing they have been granted access to that function and form in their security profile. The budget planning process can be based on individual budget plan records with manually entered amounts or be linked to previously created cost drivers.
Budget plan is prepared throughout the year as part of the established budget cycle. Generally, the cycle is comprised of various phases, with each consecutive phase allowing managers to refine their plans based on operational results and requirements. Planning may occur as a bulk yearly amount or annual amounts broken down into budget planning periods. Each Budget Plans within same scenario will share Budget Scenario parameters, Budget Plan Structure and Budget Ceiling Information. However each Budget Plans can have its own Budget Line Groups and some configuration.
Navigation
Budget Planning ► Budget Plan
Budget Plan screen Fields
Field | Description |
Code | This is a unique identifier that is automatically assigned by the system, if the System Parameter Generate Budget Planning ID is set to True, or manually entered by the User if the System Parameter Generate Budget Planning ID is set to False. |
Budget Plan Code | Automatically assigned by the system starting with 1 by each Budget Version |
Description | Description of the Budget Plan. |
Validate only assigned User can update | When this value is TRUE, system will validate that only user assigned according to workflow can update the Budget Plan. |
Budget Version | Reference to Budget Version to which this budget plan applies to. |
Institution | Budget Plan Institution to be entered by Users, according to the institution the User has accessed to. |
Budget Plan Structure | Budget Plan Structure with the same Institution as the specified Budget Plan Institution. If more than one (1) Budget Plan Structures have the same Institution, the user will select from the list of Budget Plan Structures. |
Budget Plan Type | This attribute is read-only and is automatically filled by the system with the Budget Plan Type with COA Group that corresponds to the COA Group of the specified Budget Plan Structure. If there are more than one Budget Plan Type that meet the condition, then User should select from the list of Budget Plan Types meeting the condition. |
Work Flow Status | The Work Flow Status which is controlled by the Budget Plan Workflow. Possible values are - Open when the responsible user is able to enter the budget plan data, Completed when the responsible user completed the budget plan data entry (for his/her set of budget lines), Under Analysis when the supervisor (responsible user in an upper level) is reviewing it, Revised, when a revision is done, Closed when the supervisor already consolidated it, Uncompleted when the deadline is passed, Partially Sent for Execution when budget manager sends a budget version for execution, but includes only some fiscal periods of this budget plan. Only the system can update this value, Fully Sent for Execution when budget manager sends a budget version for execution and include all the fiscal periods or all the fiscal years of this budget plan were sent for execution. Only the system can update this value. |
Workflow Process Transition | Possible values are Create, Approval Request, Approve, Verify, Cancel, and Return. |
Budget Plan Status | Possible values are Open, Completed, Under Analysis, Closed, Partially sent for execution, fully sent for execution. |
Responsible User | This refers to users who is responsible of this budget plan. This user should have proper permissions through DAS (data access security) to manage his/her budget lines. This attribute will be populated by the system based on the Employee with the same Institution If more than one (1) Employee is associated to the selected Institution, the administrative user will select from the list of Employees associated to the same Institution. |
Deadline Date | This is the maximum date to complete data entry for this budget plan. This deadline cannot be greater than the Budget Version deadline. |
Upper Level Under Analysis | Identifies the Upper Level within the Institution hierarchy, which is under analysis. |
Amount Scale | Scale used for data entry and display. |
Overview
This screen consist of searching feature related to the bulk management of the Budget Line.
Navigation
Budget Planning ► Budget Line Bulk Management
Budget Line Bulk Management screen Fields and Tabs
Field | Description |
Budget Planning Scenario | Scenario from which the Budget Plan information is selected using look up button. |
Coa Group | Display all available Budget Planning Scenario CoA Group as a drop down list. Select from the drop down list. Mandatory Parameter. |
Budget Version | Field from which the Budget Version information is selected using look up button. |
Budget Plan Type | Display all available Types of Budget Plan. Select from the drop down list. |
Budget Line Status | Display all available Budget Line Status. Select from the drop down list. |
Institution | Select institution using look up button for the filtering purpose. |
Budget Planning Scenario Fiscal Year | Fiscal Year from which the information is selected using look up button. |
Budget Plans | Budget Plan information is selected using look up button. |
Descripción
El propósito de esta característica es administrar el grupo de techos de Codificación Financiera utilizando Presupuesto actual y Grupo de Plan de Cuentas de Ambiente de Formulación.
Navegación
Formulación Presupuestaria ► Administración de Límites de Asignaciones
Campos que aparecen en la pantalla de Codificación Financiera a la que se aplican Techos
Campos | Decripción |
Ambiente de Formulación | Con este parámetro los usuarios pueden seleccionar el escenario para el que desean crear el informe. Parámetro Obligatorio. |
Grupo de Plan de Cuentas de Ambiente de Formulación | Los usuarios pueden seleccionar el grupo de Plan de Cuentas de la lista desplegable. |
Overview
Classification Type is a general catalogue for the Budget Planning module which allows classifying coding blocks with different types such as revenue, expenses, salary, non-salary, debt, etc. for validation and reporting purposes. The mentioned coding blocks are included in the budget lines as part of a budget plan. This entity works as a catalogue which can be applicable to many scenarios and budget versions.
Classification Type is an independent process of posting data into a Budget Planning, therefore defining a Classification Type can be done before or during the entering of data into a Budget Plan, but in order to have a proper Budget Line’s coding block classification the process of defining and creating the Classification Types should be prior to the final posting of information into a Budget Plan.
Navigation
Budget Planning ► Classification and Flow Type ► Classification Type
Classification Type screen Fields
Field | Description |
Code | This is a unique identifier that is automatically assigned by the system. |
Classification Type Class | This attribute will be used as discriminator for validation and reporting purposes. The possible values are Revenue, Expenditure and Other. |
Language | The language used to describe the Classification Type. |
Name | The name of the Classification Type. |
Definition Tab | This is the collection of classification type definitions. Each definition will contain a coding block or a coding block expression. |
Overview
This is the collection of classification type definitions. Each definition will contain a coding block or a coding block expression.
Definition screen Tab screen Fields
Field | Description |
CoA | The CoA to which the Classification Type Definition belongs to. |
CoA Group | The CoA Group that will be used to group and classify the coding blocks. |
Active | It can be checked or unchecked, defines if the record is active. |
Language | The language used to describe the Classification Type Definition. |
Name | The name of the Classification Type Definition. |
Coding Block Type Definition Tab | This contains a type definition (Coding Block Expression) to identify the classification type, during data entry of budget lines. |
Fiscal Year Tab | The Fiscal Year to which the Classification Type definition applies. |
Overview
Flow Type is a general catalogue for the Budget Planning module which allows classifying coding blocks with different flow types such as Inflow and Outflow for validation and reporting purposes. The mentioned coding blocks are included in the budget lines as part of a budget plan.
This entity works as a catalogue which can be applicable to many scenarios and budget versions.
Naigation
Budget Planning ► Classification and Flow Type ► Flow Type
Flow Type screen Fields
Field | Description |
Code | This is a unique identifier that is automatically assigned by the system. |
Flow Type Class | This attribute is used as discriminator for validation and and reporting purposes. The possible values are Inflow and Outflow. |
Language | The language used to describe the Flow Type. |
Name | The name of the Flow Type. |
Definition Tab | This is the collection of Flow Type definitions. Each definition will contain a coding block or a coding block expression. |
Overview
This is the collection of Flow Type definitions. Each definition will contain a coding block or a coding block expression.
Definition Tab screen Fields
Field | Description |
CoA | The CoA to which the Flow Type Definition belongs to. |
CoA Group | The CoA Group to which the Flow Type Definition belongs to. |
Active | It can be checked or unchecked. |
Language | Country specific language used to describe the Flow Type Definition. |
Name | The name of the Flow Type Definition. |
Definition | This contains a type definition of coding block which can be a valid coding block or a coding block expression. |
Fiscal Year | The Fiscal Year to which the Flow Type definition belongs to. |
Overview
This process is used when it is necessary to automatically attempt to classify Budget Line entries for a specific Budget Version for a specific Budget Plan.
The system provides a User Interface where users can filter the Budget Plan and Budget Version from Budget Plan Entity providing the necessary look ups and standard Platform functionalities, after the selection of the specific version the system informs users that there are X quantity of rows pending to be classified.
Finally users start the process to classify rows by using the process of finding a Classification Type for all necessary budget line entries in the selected Budget plan and version.
Navigation
Budget Planning ► Classification and Flow Type ► ReClassifying Budget Line Entries
Reclassification Budget Line Entries screen Fields
Field | Description |
Budget Version | Appropriate Budget Version is to be selected. |
Overview
This holds the Equity Rule definition. The equity rule allows to configure budget validation rules that will be validated in a transition during budget plan workflow.
Navigation
Budget Planning ► Classification and Flow Type ► Equity Rule
Equity Rule screen Fields
Field | Description |
Code | Automatically assigned by the system. This is a unique identifier representing the Equity Rule. |
Active | Indicates if Equity Rule is Active. |
Equity Concept | Identifies which Concept of the given Coding Block Structure (left and right side COA Groups), this restriction applies. |
Left Side | Classification type to be selected from lookup button. |
Right Side | Classification type to be selected from lookup button. |
Equity Group Expression | Equity Group Expression, using the same approach as a Valid Code Combination, but for a single Concept. |
Level in Hierarchy | Level in Hierarchy Where validation should be executed. |
Language | Language used to describe Equity Type to be selected from dropdown box. |
Description | Description of the Equity Rule |
Overview
The project pipeline is a function that is used to record all the details of new project submissions, prior to them being included in the budget proposal. These projects are subject to a workflow to manage the planning lifecycle until the project is either approved or cancelled. This function facilitates the creation of new projects and provides details about them and how they will be financed.
Navigation
Budget Planning ► Budget Pipeline ► Project Pipeline
Project Pipeline screen Fields
Fields | Description |
Code | Automatically generated ID representing the Project Pipeline, if the System Parameter Generate Project Pipeline ID is set to True, or entered manually, if the System Parameter Generate Project Pipeline ID is set to False. |
Language | Language used to describe Project Pipeline to be selected from dropdown box. |
Name | Short Description of the Project. |
Active | If checked then Project Pipeline will remain for reference purpose only and not for update actions |
Status | Workflow Status (Created, Request for Approval, Approved, Rejected, Cancelled). |
Project Pipeline Type | Identifies the type of Project Pipeline, closed domain for Project Type (New, Ongoing). |
Sector | Sector Element selected from the list of elements restricted to the Concept specified under System Parameter Sector Concept Code. |
Project Pipeline Priority | Priority Support Entity reference presenting rank positions. |
Start Date | Expected Start date of the project. |
End Date | End date of the project. |
Domestic Total Investment | Calculated field based on total of all Activities with type: “Investment”. |
Domestic Total Operation Maintenance | Calculated field based on total of all Activities with type: “Operation and Maintenance" and "Operation”. |
Project Title | Project title defined by users. |
Summary | Term of Reference or Scope of Work defined by users. |
Objective | Objective of the Project defined by users. |
Recommendation | Recommendation for the project defined by users. |
Project Owner | Requesting Agency, selected from the list of Institutions with “Budget Office” set to True |
Contacts Tab | Collection of Contact information of Project owner. |
Location Tab | Collection of Locations related to the Project. |
Product Outputs Tab | Sub-Entity outlining each Product/Output of the project. Can have 1 to N entities. |
Fiscal Years Tab | Collection of Fiscal years defined for the Project. Can have 1 to N entities. |
Financing Sources Tab | Collection of Financing Sources. The sum of the 'Budget Amount' in this collection should be equal to the Total Investment amount. |
Activities Tab | Collection of Project activity distribution per Fiscal Year. The sum of the “Budget Amounts” for Activities with Type “Investment” should be equal to the Total Investment amount. |
Project Elements | Collection of associated Project Elements. |
Attachments | Collection of attachments related to Project Pipeline. |
Overview
This is to hold the activity in which project pipeline is breakdown.
Activities Tab screen Fields
Field | Description |
Sequence | This is unique and starts from 1 for each project. |
Component Activity Type | Activity Type. Possible values are “Investment”, “Operation”, “Maintenance” or “Operation and Maintenance”. |
Currency | Users will have the option to enter the Amount in domestic or foreign currency. |
Domestic Budget Amount | Budget Amount for the Activity. |
Foreign Budget Amount | Amount when Currency is not domestic. |
Language | Country specific language used by users. |
Name | The name of the activity. |
Justification | Justification of the Activity. |
Distributions | Collection of 0 to many Reference to Budget Distribution. |
Overview
This contains a collection of Contact information of Project owner.
Contact Tab screen Fields
Field | Description |
Is Main ? | If checked, then this is the main contact. |
Contact Type | The type of contact. Possible values are: “Electronic Mail”, “Fax”, “Mobile Phone”, “Pager”, “Phone”, and “Web site”. |
Contact Location Type | This states whether the contact is permanent or temporary or emergency etc. Possible values are: “Emergency”, “Home”, “Mailing”, “Permanent”, “Temporary”, “Unknown”, and “Work”. |
Contact Value | The value of the contact depending upon the contact type. |
Language | The language used for contacting. |
Description | The description of the contact. |
Overview
This is to hold the financing Source in which project pipeline is resolved.
Financing Sources Tab screen Fields
Field | Description |
Financing Source | System will select the financing source from the list of elements that belong to the Concept specified under System Parameter Financing Source Concept Code. |
Donor Element | It will show a List of Elements restricted to definition in entity Concept Map where Concept Id is equal to value of Donor. |
Currency | Users will have the option to enter the Amount in domestic or foreign currency. |
Domestic Budget Amount | Budget amount for selected Financing Source. |
Foreign Budget Amount | Amount when Currency is not domestic. |
Overview
This is the collection of product. The product that project will produce.
Product Outputs Tab screen Fields
Field | Description |
Sequence | This is unique and starts from 1 for each project. |
Language | Country specific language used by users. |
Description | Description of the product output. |
Overview
Project Pipeline Priority holds the predefined Priorities in which project pipeline is ranked.
Navigation
Budget Planning ► Budget Pipeline ► Project Pipeline Priority
Project Pipeline Priority screen Fields
Field | Description |
Code | This is a unique identifier representing Project Pipeline Priority, generated by the system if the System Parameter Generate Project Pipeline Priority ID is set to True, or entered manually if the System Parameter Generate Project Pipeline Priority ID is set to False. |
Active | If checked then it can be used for any selection. |
Rank Number | Number to identify the rank of the Priority. |
Language | Country specific language used by users to fill in the field. |
Description | Description of the Project Pipeline Priority. |
Overview
Project pipeline Report can be of two types: Detail and Summary.
The Detailed report lists the details of each project based on a criteria (Project ID, Project Type, Institution, Sector and Priority).
The Summary Report required will list all projects within a criteria (Project Type, Institution, Sector and Priority).
Navigation
Budget Planning ► Budget Pipeline ► Project Pipeline Report ► Project Pipeline Report
Project Pipeline Report screen Fields
Field | Description |
Report Type | Report Type can be Detail/Summary for this report. |
Fiscal Year | Fiscal Year for which the report has to be generated. |
Institution | This contains the institution ID. |
Financing Source | This contains the element ID. |
Location | This contains the region ID. |
Status | Possible values are: "Approval Requested", "Approved", "Cancelled", "Created" and "Rejected". |
Overview
This report displays the Actual Expenditure for Current Year, Budget for Next Year, and quarterly break-up of the annual budget. The report can be filtered by Scenario, Budget Version, Budget Plan Type, Budget Control Type, and Institution.
Navigation
Budget Planning ► Reports ► Budget Planned Allocation Report
Budget Planned Allocation Report screen Fields
Field | Description |
Fiscal Year | Mandatory parameter. Fiscal Year for which the Expenditure will be displayed, as selected by the User. The Budget Information will be displayed for “Fiscal Year +1”. The default will be the current Fiscal Year. |
Scenario | Mandatory parameter. Users should select any Scenario from a drop-down menu displaying the Scenarios which are Active and with Scenario Fiscal Year including the selected Fiscal Year. |
Budget Version # | Mandatory parameter. Users should select any Budget Version from a drop-down menu displaying the Budget Versions within the selected Scenario, with status set to “Fully Sent for Execution” or “Partially Sent for Execution” or “Approved”. |
Item Code | Level of Summarization for the Item Code, displayed under the Report Body. The User can select any Concept within the Segment at the same level as Lower Level CoA Group, or higher level, within the Object Code Segment, for which the Actuals and Budget will be displayed. If the Item Code Concept selected is lower than the lowest level, an error message is generated. |
Institution/Organization Concept | Optional Parameter. Users can select a concept within the segment which is configured as "organization segment ", for which Actuals and Budget will be displayed under the Report. The Institution/Organization Level should be at least at the lowest level of the CoA Group. If the Institution/Organization Concept is not at the lower than the lowest level, an error message is generated. |
Functional Classification Segment | Optional Parameter. Users can select a segment for “Functional Classification” (for which the Actuals and Budget information will be displayed). |
Functional Classification Level Concept | Optional Parameter. Users can select a Concept for Functional Classification summarization, at the same level as Lower Level CoA Group, or higher level, within the Functional Classification Segment (for which the Actuals and Budget will be displayed). |
Budget Control Type Tab | Optional Parameter. Users can select one (1) or more Budget Control Types. |
Budget Plan Type Tab | Optional Parameter. Users can select one (1) or more Budget Plan Type. |
Element Tab | Optional parameter. Users can select one (1) or more elements within the selected Institution/Organization Concept. |
Overview
This report shows a list of the defined Budget Ceiling Figures and relevant planned amounts. It also shows the variance between Ceiling Figures Amounts and Planned Budget Amounts. This report will be helpful for budgeting authorities as it will help them identify any deviations from already allocated Ceiling Figures
Navigation
Budget Planning ► Rerports ► Budget Ceilings Report
Budget Ceilings Report screen fields and Tab
Fields | Description |
Budget Planning Scenario | Users should select any Scenario from a dropdown menu displaying the active Scenarios. |
Budget Version | Users should select any Budget Version from a dropdown menu displaying the Budget Versions within the selected Scenario |
Fiscal Year | Users should select Fiscal Year from a dropdown menu displaying the Fiscal Year. |
Status | Signifies the current status of the report in the workflow |
Ceiling COA Group | Users may select the COA group from the list of Scenario groups with Apply for Ceilings set to True. |
Plan COA Group | Users can select CoA group which is going to be used for this entity. |
Include Without Ceilings | If it is unchecked the ceiling is not included. |
Comment | Users comment |
Overview
This report shows a budget comparison report (surplus or deficit variance) between the previous fiscal year and the current fiscal year, based on the selected budget planning group, and the specified Financial Coding Block grouping information.
Navigation
Budget Planning ► Reports ► Budget Plan Report
Budget Plan Report screen Fields
Field | Description |
Fiscal Year | Display all available fiscal years. Mandatory Parameter. |
Display Periods | This parameter will be used to group and display the report by Fiscal period. |
Fiscal Period | By default all available Fiscal Periods that belong to the selected fiscal year must be used to generate the reports unless the user select a specific Fiscal Period. |
Budget Version | Mandatory parameter. The user should select any version that belongs to any Scenario that matches the selected fiscal year. |
Budget Plan | The budget plan is the main entity as from it all coding blocks used to generate the report will be extracted and matched vs the Budget Controls to get execution data. The Budget Plan must match the selected Fiscal Year and must belong to the selected Budget Version |
Budget Plan Status | Budget Plan Status that can be selected from the following possible values: “All”, “Open”, “Completed”, “Under Analysis”, “Closed”, “Partially Sent for Execution”, “Fully Sent for Execution”, “Revised”, “Uncompleted”. |
Institution | Institution to be selected by the User from the list of CoA elements from the segment with Organization Segment set to True. |
COA Group | COA Group used extract information for this report. The COA group must be entered by the user, if no Budget Plan is selected. |
Group By Budget Plan | Allow user to group information by Budget Plan. |
Comment | Comment entered by Users. |
Overview
This report shows a previous year actual data and current amounts, as well as planned amounts for current Fiscal Year used for Planning and indicative years, in case of medium term budgets.
Navigation
Budget Planning ► Reports ► Budget Estimates Report
Budget Estimates Report screen Fields
Field | Description |
Fiscal Year | Users should select Fiscal Year from a dropdown menu displaying the Fiscal Years. |
Budget Version | Users can select any version that belongs to any Scenario that matches the selected fiscal year. |
Budget Plan Tab | Users can select one (1) or more Budget Plans(s) that matches the selected Fiscal Year and that belongs to the selected Budget Version. |
Budget Plan Status | Users can select the Budget Plan status from the following list: "All", "Open", "Completed", "Under Analysis", "Closed", "Partially sent for Execution" and "Fully Sent for Execution", “Revised”, and “Uncompleted”. |
Institution | Allows Users to select any institution element within the COA segment with Organization Segment set to True. |
COA Group | COA group selected from the list of Scenario groups that is at the Lowest Level and with Apply for Ceilings set to False. The COA Group should be entered manually if no Budget Plan is selected. |
Group by: Budget Plan | This checkbox is used to group report by Budget Plans. |
Is current amount | This checkbox is used to define if Budget Control Original or Current Amount will be displayed under the Budget Estimates Report. |
Comment | Comment entered by the User. |
Budget Plan Type | This is an Optional Filter.The user could select a BP Type with COA Group |
Budget Plan | The budget plan is the main entity, as from it all coding blocks used to generate the report will be extracted and matched vs the Budget Controls to get execution data |
Overview
This report shows comparison between two budget versions. It displays complete budget line (Coding Block), Description of selected description concept Ex: Economic Classification, Budgeted Amounts for 1st Budget Version and budgeted amount for 2nd budget version. Users have the option to select any two budget versions that users want to compare.
Navigation
Budget Planning ► Reports ► Budget Version Comparison Report
Budget Version Comparison Report screen Fields
Field | Description |
Scenario | Through this parameter users can choose the scenario for which he wants to generate the report. Mandatory Parameter. |
Budget Version 1 | Mandatory parameter. Through this parameter users can choose the first Budget Version to compare, from the list of Budget Versions that belong to the selected scenario. |
Fiscal Year for Budget Version 1 | Mandatory parameter. Through this parameter users can choose the scenario fiscal year, from the list of Fiscal Years of the selected Scenario, for the first Budget Version to compare. |
Budget Version 2 | Through this parameter users can choose the second Budget Version to compare, from the list of Budget Versions that belong to the selected scenario. |
Fiscal Year for Budget Version 2 | Mandatory parameter. Through this parameter users can choose the scenario fiscal year, from the list of Fiscal Years of the selected Scenario, for the second Budget Version to compare. Scenario CoA Group: Mandatory Parameter. Through this parameter user will choose the Scenario CoA Group for which the report will be generated. |
Comment | Comment entered by the User. |
Scenario CoA Group | The system will automatically assign the lowest group in hierarchy for the budget plan structure linked to the selected budget plan, the Group must be selected from the corresponding Scenario COA group linked to a specific Budget plan structure which at the end are linked to the Budget plan. |
Overview
This Report enables users to report future year Commitments and Obligations against the Budget Plan. This report can be generated at the detailed budget plan lines or can be summarized to any level of the COA. It offers up to 3 fiscal years of budget and will calculate the variance of the budget plans for each years. Users can then identify any negative variance and correct them as Budget Plans that are less than future year commitments and obligations will not be sent to Execution.
Navigation
Budget Planning ► Reports ► Budget Plan Versus Planned Commitments And Obligations Report
Budget Plan Versus Planned Commitments And Obligations Report screen Fields
Field | Description |
Scenario | Scenario from which the information is extracted for this report, from the list of active scenarios. |
Budget Version | Budget Version selected from the list of Budget Version(s) that belongs to the selected Scenario. |
Fiscal Year (1) | First Fiscal Year selected from the list of Fiscal Years associated to the scenario. Through this parameter, the User can choose the first Budget Version Fiscal Year for which the comparison will be performed. |
Fiscal Year (2) | Second Fiscal Year selected from the list of Fiscal Years associated to the scenario. Through this parameter, the User can choose the Second Budget Version Fiscal Year for which the comparison will be performed. |
Fiscal Year (3) | Third Fiscal Year selected from the list of Fiscal Years associated to the scenario. Through this parameter, the User can choose the third Budget Version Fiscal Year for which the comparison will be performed. |
COA Group | COA Group selected by the user, restricted to the Scenario COA groups with Apply for Ceilings set to False. |
Comment | Comment entered by the User. |
Hierarchy Rollups COA Elements | This functionality will allow to filter by any of the CoA concept elements. |
Coding Block Filter type | Possible values are “Coding Block”, “Coding Block Expression Filter”, and “Hierarchical Coding Block Element”. If “Coding Block” is selected, the system will allow the user to enter a coding block that will be used for filtering. “Coding Block Expression Filter” is selected the system will allow the user to enter a coding block expression that will be used for filtering. If “Hierarchical Coding Block Element” is selected, the system will allow the user to select any CoA concept element or ranges of elements, from the segment that are included in the selected CoA Group. |
Coding Block | This field will allow the user to enter the Coding Block, if Coding Block Filter type is set to “Coding Block”. |
Segment | Segment used for filtering if Coding Block Filter type is set to “Hierarchical Coding Block Element” – one (1) or more segment(s) can be selected, or for grouping (along with the selected concept), for any Coding Block Filter type. |
Concept | Concept used for filtering, for each selected segment, if Coding Block Filter type is set to “Hierarchical Coding Block Element”, or for grouping, for any Coding Block Filter type. |
Overview
This report shows a list of the defined Budget Ceilings for the selected Fiscal Year compared to the Previous Year’s Ceiling. It also shows the variance between the two Ceilings amounts. This report is helpful for budgeting authorities as it helps them identify any variances between the Ceilings Figures for both years.
Navigation
Budget Planning ► Reports ► Budget Ceilings Comparison Report
Budget Ceilings Comparison Report screen Fields
Field | Description |
Scenario | First Scenario, from the list of Active Scenarios, for which the report will be generated. |
Budget Version | It manages the status and general information of each budget version. Each budget version within same scenario will share Budget Scenario parameters, Budget Plan Structure and Budget Ceiling Information. |
Fiscal Year (1) | First Scenario Fiscal Year for which the report will be generated |
Fiscal Year (2) | Second Scenario Fiscal Year, for which the report will be generated |
Fiscal Year (3) | Third Scenario Fiscal Year, for which the report will be generated |
COA Group | COA Group, selected from the list of COA groups belonging to Scenario A and B, with Apply for Ceiling set to True. |
Comment | Comment entered by the user. |
Hierarchy Rollups COA Elements | This functionality will allow to filter by any of the CoA concept elements. |
Coding Block Filter type | Possible values are “Coding Block”, “Coding Block Expression Filter”, and “Hierarchical Coding Block Element”. If “Coding Block” is selected, the system will allow the user to enter a coding block that will be used for filtering. “Coding Block Expression Filter” is selected the system will allow the user to enter a coding block expression that will be used for filtering. If “Hierarchical Coding Block Element” is selected, the system will allow the user to select any CoA concept element or ranges of elements, from the segment that are included in the selected CoA Group. |
Coding Block | This field will allow the user to enter the Coding Block, if Coding Block Filter type is set to “Coding Block”. |
Segment | Segment used for filtering if Coding Block Filter type is set to “Hierarchical Coding Block Element” – one (1) or more segment(s) can be selected, or for grouping (along with the selected concept), for any Coding Block Filter type. |
Concept | Concept used for filtering, for each selected segment, if Coding Block Filter type is set to “Hierarchical Coding Block Element”, or for grouping, for any Coding Block Filter type. |
Group | If checked, grouping will be performed for the selected Concept. |
Sub Total | If checked, sub totals will be displayed for the selected grouping. |
Overview
The purpose of this report is to show the distribution of Budget Ceilings from higher COA group levels to lower levels.
Navigation
Budget Planning ► Reports ► Budget Ceiling Distribution Report
Budget Ceiling Distribution Report screen Fields
Field | Description |
Scenario | Scenario from which the Budget Plan information extracted. |
Fiscal Year | By clicking dropdown list users get the fiscal year list to select. |
COA Group | Selected COA Group of parent ceiling displayed, selected from the list of Scenario COA Groups. |
Comment | Comment based on the report. |
Overview
The purpose of this report is to show the list of Budget Plans, with Budget Plan Code, Budget Plan Description, Budget Plan Status, Last Updated Date and Responsible User, for the selected Budget Version, Deadline Date, Budget Plan Status, Budget Plan Type, and filtered Chart of Accounts concepts and elements.
Navigation
Budget Planning ► Reports ► Budget Plan Report
Budget Plan Status Report screen Fields
Field | Description |
Scenario | Scenario from which the Budget Plan information will be extracted. |
Fiscal Year | Display all available fiscal years. Mandatory Parameter. |
Date for Generation | Date for which the budget plan is generated. |
Budget Version | Mandatory parameter. The user should select any version that belongs to any Scenario that matches the selected fiscal year. |
Budget Plan Status | Budget Plan Status that can be selected from the following possible values: “All”, “Open”, “Completed”, “Under Analysis”, “Closed”, “Partially Sent for Execution”, “Fully Sent for Execution”, “Revised”, “Uncompleted”. |
Budget Plan Type | Budget Plan Type ID and Description. |
Comment | Comment based on the report. |
Group Individual Institutions | Default checkbox value is true. |
Group By Institution Type | Group it by the type of institutions. |
Institution | As per report requirement check the institution. |
Overview
This is a statutory budget report that is sent out to Government Of Jamaica for discussion and approval. The report shows detailed estimates for Ministries and Departments expenditures, for Financial Patterns Recurrent (1), Capital A (2), or Capital B (3).
.
Navigation
Budget Planning ►Budget Book Builder ► Jamaica Reports ► Statutory Provisions and Provisions to be Voted
Statutory Provisions and Provisions to be Voted screen fields and Tab
Field | Description |
Scenario | Through this parameter user can choose the scenario for which he wants to generate the report |
Planning CoA Group | The Default value is the CoA Group from Scenario CoA Group with attribute Lower level CoA Group equal to Null |
Print Amount | States the print amount |
Execution CoA Group | Signifies the Executing CoA group for the report to be generated. |
Fiscal Year | The current Fiscal Year |
Fiscal Year – 2 | This is the Budget Execution Fiscal Year |
Fiscal Year – 1 | This field states the Actuals Fiscal Year |
Budget Version (Fiscal Year) | First Budget Version in list. Alphabetically ascending order. |
Fiscal Year 1: | This field states the Projection 1 Fiscal Year |
Budget Version (Fiscal Year 1) | Budget version for Fiscal Year 1 |
Fiscal Year 2 | This field states the Projection 2 Fiscal Year |
Budget Version (Fiscal Year 2) | Budget version for Fiscal Year 2 |
Fiscal Year 3 | This field states the Projection 3 Fiscal Year |
Budget Version (Fiscal Year 3) | Budget version for Fiscal Year 3 |
Comment | Comment regarding the report |
Overview:
This Report list the budget amount calculated by the Cost Drivers values register during Budget Line detail registration.
Navigation:
Budget Line Cost Driver Report screen fields:
Fields | Description |
Fiscal Year | Filter criteria for fiscal year, Displays all available fiscal years. |
Budget Version | Filter criteria for budget version. Users can select any version that belongs to any Scenario that matches the selected fiscal year. |
Budget Plan | Filter criteria for Budget Plan, Indicates a single Budget Plan that matches the fiscal year in Budget version. |
Institution | Filter criteria for Institution. Allows the user to select any institution. |
Budget Plan Status | The user could select the Budget Plan status as filter criteria. |
CoA Group | COA Group used extract information for this report. The COA group must be entered by the users, if no Budget Plan is selected. |
Group By Budget Plan | Allow users to group information by Budget Plan. |
Comment | Comment entered by Users. |
Hierarchy Rollups UACS Elements | Allow the user to filter by any concept and range of elements belonging to the CoA group. |